Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Meeting papers

of 79

Text shows just the words. Original shows the document exactly as it was published.

Very large file (10.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

SERVICES & ORGANISATION COMMITTEE MEETING                                           12 NOVEMBER 2024




Pictured: Pinbarren Link Trail (left), Woondum Trail (right) - Completed upgrades




Pictured: Woondum Trail – Completed upgrades
Planning and Design Program
The Design Services team are currently managing 16 projects and providing design services to 18
projects and continue to provide design survey support to over 60 projects in the 2024/25 financial
year. These projects have a combined design and construction value exceeding $14m.
The following design projects are in various stages of design during this quarter:
      • Cooroy, Cooroy Sports Complex Car Park and Entrance
      •   Noosa, Noosa Parade Stage 2
      •   Noosa, Noosa Drive footpath
      •   Noosaville, Noosaville Foreshore Changing Places
      •   Noosaville, Weyba Road and Reef Street Roundabout Design
      •   Peregian Beach, Coastal Pathway Stage 1
      •   Shire Wide, Bus Stop Program
      •   Shire Wide, Pathway Program
      •   Sunshine Beach, 58 David Low Way Retaining Wall




                                                                                                Page 73 of 79
Log in to download the original file

56b44fac6e.pdf · 10.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.