Original source · versioned page text
SUPERSEDED Reference Document Bushfire Hazard Assessment & Management Plan v 2 June 2024 MCU24 0084 (1)
Bushio Hazard Assessment & Management Plan v2 Lot 4 on RP 160124 ~ 658 Louis Bazzo Dr, Ringlal Crook QLD 4565 NCES REF: Joo1s1s Table 4 — Reproduction of Table 8.2.3.3 Bushfire Hazard Areas ~ Part 8 Overlay Code Nooea Plan 2020 Safety of people and property Pot Development maintains the safety of people and property from the adverse impacts of bushfire. A014 Development which will materially increase the number of people living or congregating on premises, including reconfiguring a lot, is not located within a medium or high bushfire hazard area. A01.2 Development maximises setbacks from hazardous vegetation to achieve an acceptable risk. Editor's Note —PSP8 Natural Hazards provides guidance for assessing bushfire hazard risk and preparing a bushfire hazard management plan. This Bushfire Hazard Assessment and Management Plan has been prepared to maintain the safety of people and property from the adverse impacts of bushfire. A01.1 —The proposed development is located outside of a mapped Very High, High, and Medium Potential Bushfire Intensity areas as depicted on the Local Hazard Area Map (refer Plan BFO3). ‘A01.2- The wedding marquee (the only proposed building) has been provided with appropriate separation from the adjacent hazardous vegetation; SUSb, to satisfy the SPP Assessment Benchmark 4 criteria of <29kWim? radiant heat flux exposure. Impact on Ecologically Important Areas poz Bushfire mitigation measures do not adversely impact on: a) biodiversity values, connectivity and ecosystem functioning; and b) the long term physical integrity of waterways, wetland and areas of native vegetation. No acceptable outcome provided P02 — No vegetation clearing is required to satisfy the APZ recommendations. ‘A minor amount of vegetation clearing/delimbing may be required to facilitate the vehicular access recommendations about the waterway crossings for the emergency alternative access route to achieve a minimum 3.5m width and 4.8m vertical clearance. All vegetation clearing required to facilitate the vehicular access recommendations can likely be carried out as exempt clearing under the routine management (a) definition of the Planning Regulation 2017 if restricted to 10m width. Refer NCES Ecobgical Assessment Report v1 2024 for detailed response for impacts to ecological values. Water Supply for Fire Fighting Purposes PO3 Development provides an adequate water supply for firefighting purpose which is reliable, safely located and freely accessible A031 Premises are connected to the reticulated water supply. Editor's note—For reconfiguring a lot, water supply needs to provide for a minimum flow and pressure of 10 litres a second at 200kPa at all times for firefighting purposes. OR A032 Where there is no available reticulated water supply, the premises has: a) an accessible dam, swimming pool or water tank available for firefighting purposes with an onsite water volume of not less than 5,000 litres; and b) a water supply outlet pipe 50 millimetres in diameter fitted with a ‘A03.1 — No reticulated water is currently available to the site. The water supply requirements of SPP Assessment Benchmark 5 prevails and can be conditioned with an approval (as recommended in Section 5.3). Note, the reliance upon dams or pools for water storage is not an acceptable solution under the SPP. ©2024 Document Set ID: 23422887 Version: 3, Version Date: 14/01/2025
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.