Decision Notice - Approved by Delegation of Authority MCU22 0016 · MCU22/0016.01

of 9

Text shows just the words. Original shows the document exactly as it was published.

                                                               Officer:            Lisa Pienaar
                                                               Direct Telephone:   07 53296514
                                                               Our Reference:      MCU22/0016
                                                               Your Reference:     20220554

               19 August 2022


               Ms IAM Hutton & Dr NJ Hutton
               C/- Adapt Town Planning
               PO Box 7618
               SIPPY DOWNS QLD 4556
               [email protected]



               Dear Sir/Madam,
                                                         Decision Notice
                                                         Planning Act 2016

               I refer to your application and advise that on 16 August 2022, Council decided to approve the
               application, subject to conditions.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              MCU22/0016

                   Street address:              24 Plover St Peregian Beach Qld 4573

                   Real property description:   Lot 5 P 9313

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
                      Development Permit for Material Change of Use - Dwelling House
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

               PLANNING
                       When Conditions must be Complied With
               1.      Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                       the use commencing, and then compliance maintained at all times while the use continues.




                                                PO Box 141                  P. (07) 5329 6500     [email protected]
                                                TEWANTIN QLD 4565           F. (07) 5329 6501     www.noosa.qld.gov.au
                                                                                                                Page 1 of 9
Document Set ID: 22076622
Version: 2, Version Date: 19/08/2022
Full text of the other 8 pages

Page 2

                      Approved Plans
               2.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                         Plan No.      Rev.     Plan/Document Name                                     Date

                         WD.151        WD.60%   Planning Envelope, prepared by Aboda Design 11.08.2022
                                                Group

                         WD.104        WD.60%   GFA and Site Cover, prepared by Aboda Design 11.08.2022
                                                Group

                         WD.201        WD.60%   Lower Level Plan, prepared by Aboda Design 11.08.2022
                                                Group

                         WD.202        WD.60%   Main Level Plan, prepared by Aboda Design Group 11.08.2022

                         WD.203        WD.60%   Upper Level Plan, prepared by Aboda Design 11.08.2022
                                                Group

                         WD.204        WD.60%   Roof Plan, prepared by Aboda Design Group              11.08.2022

                         WD.501        WD.60%   North Elevation, prepared by Aboda Design Group 11.08.2022

                         WD.502        WD.60%   South Elevation, prepared by Aboda Design Group 11.08.2022

                         WD.503        WD.60%   West and East Elevation, prepared by Aboda 11.08.2022
                                                Design Group

                         WD.601        WD.60%   Sections, A & C, prepared by Aboda Design Group        11.08.2022

                         WD.602        WD.60%   Section B & D, prepared by Aboda Design Group          11.08.2022

                         WD.603        WD.60%   Section E, prepared by Aboda Design Group              11.08.2022

                         WD.604        WD.60%   Section F, prepared by Aboda Design Group              11.08.2022

                      Building Height
               3.     The maximum height of the development must not exceed 8 metres above the finished
                      ground level and the natural ground surface.
               4.     Certification must be submitted to Council from a Licensed Surveyor which certifies that the
                      building does not exceed the maximum height requirement of this Decision Notice.
                      Currency Period
               5.     This development approval lapses if the use has not happened by 16 August 2028 unless
                      an application to extend the currency period is approved by Council.
                      Performance Bond
               6.     Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to the
                      issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
                      will be returned on performance of the conditions of approval less any costs incurred by
                      Council in respect of enforcing performance of this permit. Council reserves the right to call
                      upon the bond or guaranteed sum to effect compliance with conditions.




                                                                                                        Page 2 of 9
Document Set ID: 22076622
Version: 2, Version Date: 19/08/2022

Page 3

                      Landscaping
               7.     A minimum of 20% of the site must be retained as soft landscaping.
               8.     A minimum 5 metre wide plantings must be provided for the full length of the reserve/seaward
                      boundary (exclusive of where the pool and stairs encroach within this area). The garden must
                      consist of a mix of native shrubs and ground covers that have fire resistance and in
                      accordance with Planning Scheme Policy PSP 2 – Landscaping.
               9.     Existing trees on the site must be retained, except where required to be removed to
                      accommodate the approved dwelling.
               10.    Existing vegetation in the road reserve must be retained (exclusive of access driveway),
                      unless written authorisation from Council is granted for the clearing.
               11.    The paperbark located in the road reserve may be removed to facilitate new access. Replace
                      with 2 x 45L trees in the road reserve adjacent to the front boundary of the property with an
                      appropriate species in accordance with Planning Scheme Policy PSP 2 – Landscaping that
                      is compatible with the height of powerlines.
               12.    Trees to be retained must be protected from clearing or construction activities by:
                      a.      clearly marking vegetation to be retained with flagging tape
                      b.      installing protective fencing around the drip line of the vegetation
                      c.      restricting stockpiling, storage and vehicle parking to those areas which are already
                              cleared
                      d.      using low impact construction techniques around vegetation.
               13.    Screening vegetation must be planted between the pool and the southern boundary; and
                      between the dwelling and the northern boundary, in accordance with Council’s Planning
                      Scheme Policy PSP2 - Landscaping. The planted vegetation must have a minimum pot size
                      of 10 litres and consist of native, endemic species with a mature height of not less than 2.5
                      metres.
               14.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               15.    All landscape works must be maintained generally in accordance with the approved design
                      for the life of the development.
                      Coastal Protection
               16.    External colours and finishes of the building must comprise of muted/environmental tones
                      that blend with the natural environment.
               17.    Proposed retaining walls on the rear boundary are to be constructed in such a way that there
                      is no impact on adjoining vegetation within the reserve. Footings are to be wholly located
                      within the site.
                      Garage
               18.    The garage on the side boundary must comply with the Queensland Development Code.
               ENGINEERING
                      Site Access and Driveways
               19.    One sealed access driveway must be provided from Plover Street to all parking and
                      manoeuvring areas of the development. The driveway must be constructed in accordance
                      with an Operational Works approval and Council’s Standard Drawing RS-049 and RS-050
                      and any associated addendum. Where existing access occurs and is repositioned, the
                      existing access must be reinstated as grass and street trees as required by Condition 11 of
                      this approval.



                                                                                                      Page 3 of 9
Document Set ID: 22076622
Version: 2, Version Date: 19/08/2022

Page 4

                      Stormwater Drainage
               20.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken generally in accordance with the Stormwater
                      Management Report - reference S22-040 and drawing number S22-040-P01 prepared by
                      Westera Partners dated April 2022.
                      Easements
               21.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               22.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               23.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Earthworks and Retaining Walls
               24.    All earthworks must be carried out in accordance with the Geotechnical Assessment –
                      reference No: 35229URrpt prepared by JK Geotechnics dated 27 July 2022.
               DEMOLITION
                      Performance Bond
               25.    Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
                      submitted to Council prior to the issue of a Development Permit for Building Works for
                      demolition, to secure the demolition conditions of this approval. The cash bond or trading
                      bank guarantee will be returned on performance of the demolition conditions of this approval
                      less any costs incurred by Council in respect of enforcing performance of these demolition
                      conditions. Council reserves the right to call upon the bond or guaranteed sum to effect
                      compliance with conditions.
                      Works
               26.    Demolition must be undertaken in a manner that causes no detrimental effect upon the
                      amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
                      hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
                      in accordance with the nuisance provisions of the Environmental Protection Act 1994.
                      Waste management
               27.    A Waste Management Plan (demolition) must be submitted in accordance with Planning
                      Scheme Policy PSP10 - Waste Management and approved by Council’s Waste Coordinator
                      prior to issue of a development permit for Building Works for demolition, removal or
                      relocation.
                      The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
                      effective reuse and recycling of such materials. Segregated wastes attract significantly
                      reduced disposal fees at the landfill with some items free. Higher gate fees are charged for
                      mixed waste.
                      Waste storage areas must provide for adequate separation of all reusable, recyclable and
                      waste materials. These must be located so that they are convenient and safe to use.
                      The Plan must contain the following information:
                      a.      The areas for the storage and separation of waste shown on a site plan;
                      b.      A waste management table as indicated below is to be completed showing how waste
                              material is to be segregated - recycled – reused or disposed; and
                      c.      Table – Waste Management Table


                                                                                                        Page 4 of 9
Document Set ID: 22076622
Version: 2, Version Date: 19/08/2022

Page 5

                          MATERIALS ON-SITE                                   DESTINATION
                                                                  Re-use and Recycling                    Disposal
                          Expected waste    Estimated  On-site                 Off-site               *specify contractor
                          materials         volume(m³) *specify     proposed   *specify contractor    and landfill site or
                                                         re-use or on-site     and recycling outlet   other disposal site
                                                         recycling methods
                          Excavation
                          material
                          Green waste
                          Bricks
                          Concrete
                          Timber-please
                          specify
                          Plasterboard
                          Metals - please
                          specify
                          Asbestos
                          Other - please
                          specify
                      Note * If a demolition contractor is undertaking works, then the Waste Management table is
                      to be completed by the demolition contractor.
                      Damage to infrastructure
               28.    Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
                      bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
                      Vacant site
               29.    The site must be left clean and tidy free from debris such as concrete, wire, rubble, brick/s
                      and the like. If the site remains vacant for more than 30 days the lot/s must be turfed or
                      landscaped in accordance with Planning Scheme Policy PSP 2 – Landscaping and to the
                      satisfaction of Council so as to not cause nuisance to the surrounding area.
               30.    All waste materials must be removed from site.
                      Litter, erosion and sediment control
               31.    Litter, erosion and sediment control measures must be installed and maintained until soils
                      are stabilised by turf, vegetation or sealed.
                      Note: it is an offence under the Environmental Protection Act 1994 to deposit or potentially
                      allow litter, waste, soil, or other contaminants to enter a waterway or storm water drainage
                      system (e.g. roadside gutter).
                      Asbestos
               32.    Removal of building materials containing asbestos must be undertaken by a licensed
                      asbestos removalist.
               33.    Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
                      requires a licensed asbestos removalist to give notice to Workplace Health and Safety
                      Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
                      commences. Notification must be made using Form 65: Notification of licensed asbestos
                      removal work, demolition work or emergency demolition.
               34.    All building materials containing asbestos products are wrapped and disposed of in
                      accordance with the Public Health Regulation 2006 and the Environmental Protection
                      Regulation 2008.
                      Note: Asbestos is a Regulated Waste. The Department of Environment & Science licenses
                      businesses that transport asbestos waste, and landfills that accept this waste.




                                                                                                         Page 5 of 9
Document Set ID: 22076622
Version: 2, Version Date: 19/08/2022

Page 6

               35.    All building materials containing asbestos, including asbestos cement sheeting or roofing and
                      lagging are removed from the building prior to demolition/relocation.
                      Plumbing and Drainage
               36.    It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
                      demolition of a building, the existing sanitary drain upstream from the connection point for a
                      service provider’s sewerage system must be sealed water tight. This work is deemed as
                      notifiable Work and must be carried out by a suitably licenced plumber who must submit an
                      As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
                      Construction Commission) within 10 days of completing the work.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Aboriginal Cultural Heritage Act 2003
               1.     There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.
                      You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
                      Equitable Access and Facilities
               2.     The plans for the proposed building work have NOT been assessed for compliance with the
                      requirements of the National Construction Code - Building Code of Australia (Volume 1) as
                      they relate to people with disabilities. Your attention is also directed to the fact that in addition
                      to the requirements of the National Construction Code as they relate to people with
                      disabilities, one or more of the following may impact on the proposed building work:
                      a.      the Disability Discrimination Act 1992 (Commonwealth);
                      b.      the Anti-Discrimination Act 1991 (Queensland); and
                      c.      the Disability (Access to Premises – Buildings) Standards.
                      Infrastructure Charges
               3.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges




                                                                                                             Page 6 of 9
Document Set ID: 22076622
Version: 2, Version Date: 19/08/2022

Page 7

                      Property Driveway and Vehicle Crossover
               4.     The planning scheme declares Operational Work for the construction of a driveway and
                      vehicle crossover to the property to be self-assessable against the Low Density Housing
                      Code. A self-assessable application is required to be submitted to Council for the vehicle
                      crossover (*link below) OR if the proposed driveway and vehicle crossover does not comply
                      with each Acceptable Solution contained in the Code, a Development Permit for the work is
                      required to be obtained from Council.
                      *http://www.noosa.qld.gov.au/documents/40217326/40415739/Vehicle%20Crossover%20Application%20Pack.pdf
                      Sustainability
               5.     In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable building
                      design for residential and commercial development. Council encourages the use of
                      sustainable building materials, energy efficient fittings, solar hot water, photovoltaic systems
                      (including the use of inverter/charges), water saving devices and rainwater harvesting. For
                      further information go to http://www.noosa.qld.gov.au/sustainable-homes
                      Building and Construction Industry (Portable Long Service Leave) Levy
               6.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required                     Subject of the required Development Permit

                Development Permit for Operational Works                Access, Landscaping

                Development Permit for Building Works                   All building work

               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.




                                                                                                                     Page 7 of 9
Document Set ID: 22076622
Version: 2, Version Date: 19/08/2022

Page 8

               12.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully,




               Lisa Pienaar
               Development Planner


               Enc:   Appeal Rights
                      Approved Plans/Documents




                                                                                                       Page 8 of 9
Document Set ID: 22076622
Version: 2, Version Date: 19/08/2022

Page 9

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                    Page 9 of 9
Document Set ID: 22076622
Version: 2, Version Date: 19/08/2022

Used in these records

About this file

File size
198 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority MCU22 0016.pdf · 198 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.