Council archive · source document
Decision Notice - Approved by Delegation of Authority MCU22 0016 · MCU22/0016.01
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
WD.151 WD.60% Planning Envelope, prepared by Aboda Design 11.08.2022
Group
WD.104 WD.60% GFA and Site Cover, prepared by Aboda Design 11.08.2022
Group
WD.201 WD.60% Lower Level Plan, prepared by Aboda Design 11.08.2022
Group
WD.202 WD.60% Main Level Plan, prepared by Aboda Design Group 11.08.2022
WD.203 WD.60% Upper Level Plan, prepared by Aboda Design 11.08.2022
Group
WD.204 WD.60% Roof Plan, prepared by Aboda Design Group 11.08.2022
WD.501 WD.60% North Elevation, prepared by Aboda Design Group 11.08.2022
WD.502 WD.60% South Elevation, prepared by Aboda Design Group 11.08.2022
WD.503 WD.60% West and East Elevation, prepared by Aboda 11.08.2022
Design Group
WD.601 WD.60% Sections, A & C, prepared by Aboda Design Group 11.08.2022
WD.602 WD.60% Section B & D, prepared by Aboda Design Group 11.08.2022
WD.603 WD.60% Section E, prepared by Aboda Design Group 11.08.2022
WD.604 WD.60% Section F, prepared by Aboda Design Group 11.08.2022
Building Height
3. The maximum height of the development must not exceed 8 metres above the finished
ground level and the natural ground surface.
4. Certification must be submitted to Council from a Licensed Surveyor which certifies that the
building does not exceed the maximum height requirement of this Decision Notice.
Currency Period
5. This development approval lapses if the use has not happened by 16 August 2028 unless
an application to extend the currency period is approved by Council.
Performance Bond
6. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with conditions.
Page 2 of 9
Document Set ID: 22076622
Version: 2, Version Date: 19/08/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority MCU22 0016.pdfRelated documentApplication case desk ↗
About this file
- File size
- 198 KB (small file)
- File type
No other editions are linked here.