7.8 79 8.0 8.1 8.2 8.3 8.4 The use of Council's bulk water supply for the general irrigation of landscaped areas and the golf course is prohibited. The development shall provide its own bulk water supply for general irrigation. The Developer shall provide to Council detailed transparency plans showing the system of water reticulation prior to any of the work being accepted “on maintenance". EXTERNAL ROADWORKS The following works are to be carried out to the standards and requirements of the Shire Engineer and the Department of Transport (Main Roads Division) where relevant:- The developer shall construct an access road between the development site and the proposed roundabout on Cooyar Street near Tarina Street in conjunction with the first stage of development. The minimum standard of construction shall be a 10 m. wide formation with full width bitumen seal. The developer shall construct the Cooyar Street roundabout including connections to existing streets and proposed access road to development in conjunction with the first stage of development. The developer is, to pay compensation to Council for Council land required for the access road and roundabout. The value of the compensation shall be as determined by Council's Valuer following completion of the roundabout design is to be subject to, negotiation between Council and the developer. , The Developer shali contribute $250,000 plus P.I.. increases measured from July 1993 (being the date of gazettal of the first rezoning of this site) towards the cost of constructing improvements at the intersection of Leslie: Drive and the Cooroy-Noosa Road. and towards the cost of upgrading the narrow section of Leslie Drive from Arkana Drive to the Cooroy-Noosa Road. : These contributions are to be paid prior to building permits being issued for more than 30% of the development or within 12 months after the first Certificate of Classification is issued for any building associated with the project, whichever is the sooner. The developer shall contribute $200,000 plus P.I increases measured from July 1993 (being the date of gazettal of the first rezoning of this site) towards the . cost of constructing intersection improvements at the intersection of Cooyar Street and Langura Street and the cost of upgrading the narrow sections of Cooyar Street. Such contributions shall’ be paid prior to the issue of any building permit in. conjunction with the project. :
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Original Conditions December 1994.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.