Original Conditions December 1994

of 23

Page text read automatically using OCR, there may be inaccuracies

oon,

8.5

8.6

8.7

9.0

9.1

9.2

9.3

The developer is to comply with all reasonable requirements of the Department of

Transport in respect of this development including the timing of works and the
provision of an overbridge (including separate provision for pedestrian/cycle traffic) .
over the proposed Eenie Creek arterial road. The construction of such overbridge is
to suit the ultimate construction standard of the Eenie Creek arterial.

During construction works associated with the development, Council shall assess
any increases in maintenance costs required on the existing roads in the area, as a
result of use by construction vehicles.

The developer shall be responsible for any restoration works due to damage directly

attributable to the development.

In the event that such restoration works are not

carried out to Council's satisfaction, Council may call upon the performance bond
to obtain adequate maintenance levels.

The developer shall construct a combined pedestrian/cycleway to connect the
development site with the existing facilities in Cooyar Street. The
pedestrian/cycleway is to be located within the road reserve for the proposed access
road to the development and shall be a minimum 2 metres wide. The
pedestrian/cycleway is to be constructed in conjunction with the first stage of the
development.

INTERNAL ROADWORKS AND CARPARKING

Bitumen AC internal roads with kerb and channel are to be provided at the
developer's expense throughout the site to service the whole of the development.
Detailed plans and specifications are to be submitted for approval by the Shire
Engineer. No construction shall take place until such approval is granted.

The Developer shall establish car parking areas in accordance with the.requirements -
of the Town Planning Scheme. Such areas and access thereto shall be paved or

sealed in accordance with the requirements of the Shire Engineer.

The Developer shall also identify an overflow car park area which need not be of a
sealed standard but which shall be of a sufficient size to accommodate visitors to the

resort.

The developer shall fulfil the requirements of the Department of Transport
(Passenger Transport Division) in respect of setdown and pickup bays for local bus
services as well as long distance coaches. The advices of this Department are to be

obtained prior to submission of the internal road designs to Council for approval.

The developer shall provide a combined pedestrian/cycleway~ within the
development site to connect to the external facility. The minimum standard’shall be

2.0 m. wide concrete construction.

“

Log in to download the original (Original Conditions December 1994.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.