Original source · versioned page text
Original Conditions December 1994
oon, 8.5 8.6 8.7 9.0 9.1 9.2 9.3 The developer is to comply with all reasonable requirements of the Department of Transport in respect of this development including the timing of works and the provision of an overbridge (including separate provision for pedestrian/cycle traffic) . over the proposed Eenie Creek arterial road. The construction of such overbridge is to suit the ultimate construction standard of the Eenie Creek arterial. During construction works associated with the development, Council shall assess any increases in maintenance costs required on the existing roads in the area, as a result of use by construction vehicles. The developer shall be responsible for any restoration works due to damage directly attributable to the development. In the event that such restoration works are not carried out to Council's satisfaction, Council may call upon the performance bond to obtain adequate maintenance levels. The developer shall construct a combined pedestrian/cycleway to connect the development site with the existing facilities in Cooyar Street. The pedestrian/cycleway is to be located within the road reserve for the proposed access road to the development and shall be a minimum 2 metres wide. The pedestrian/cycleway is to be constructed in conjunction with the first stage of the development. INTERNAL ROADWORKS AND CARPARKING Bitumen AC internal roads with kerb and channel are to be provided at the developer's expense throughout the site to service the whole of the development. Detailed plans and specifications are to be submitted for approval by the Shire Engineer. No construction shall take place until such approval is granted. The Developer shall establish car parking areas in accordance with the.requirements - of the Town Planning Scheme. Such areas and access thereto shall be paved or sealed in accordance with the requirements of the Shire Engineer. The Developer shall also identify an overflow car park area which need not be of a sealed standard but which shall be of a sufficient size to accommodate visitors to the resort. The developer shall fulfil the requirements of the Department of Transport (Passenger Transport Division) in respect of setdown and pickup bays for local bus services as well as long distance coaches. The advices of this Department are to be obtained prior to submission of the internal road designs to Council for approval. The developer shall provide a combined pedestrian/cycleway~ within the development site to connect to the external facility. The minimum standard’shall be 2.0 m. wide concrete construction. “
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Original Conditions December 1994.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.