Original Conditions December 1994

of 23

Page text read automatically using OCR, there may be inaccuracies

on,

10.0

10.1

10.2

10.3

10.4

10.5

10.6

10.7

The pedestrian/cycleway shall be generally located separate from the internal road
network and shall be established in conjunction with and having regard to proposed
open space areas within the site. The pedestrian/cycleway shall extend across the
proposed overbridge.

Prior to any works commencing on the pedestrian/cycleway system, conceptual
plans of the proposed pedestrian/cycleway network shall be submitted for the
approval of the Shire Engineer. All works shall be carried out to the standards and
satisfaction of the Shire Engineer. The submission shall also address the timing of °
construction of various stages of the system and such construction shall again take
place-in accordance with the approved submission.

FILLING AND EXCAVATION

All filling and/or excavation works shall be carried out strictly in accordance with
the approval of the Shire Engineer and the approved Master Drainage Plan as
required by Clause 4. In general major alteration.to the existing landscape will not
be allowed. . .

Earthworks associated with all roads shall be completed in accordance with the
approved Master Drainage Plan.

All proposed fill material shall be tested by an approved Geotechnical Engineer and
the results submitted for approval by Council. Following completion of filling,
compaction tests shall be submitted to the Building Surveyor. Building permits shall
not be issued for areas of filling unless the Building Surveyor is satisfied with the fill
compaction tests.

Filling that will result in the pondage of water on or off the site (other than the
proposed dam system and siltation ponds) shall be prohibited.

All disturbed areas are to be revegetated as soon as practicable following completion
of earthworks to reduce transport of sediments to Lake Weyba.

Prior to commencement of earthworks, the developer shall carry. out the
archaeological site works recommended by the consultant.

Prior to the commencement of earthworks, the developer shall submit to the Council
a survey prepared by a suitably qualified geotechnical engineer or other qualified
consultant to determine the presence of the precursor for acid sulphate formation.
Should the presence of this precursor be found, a management plan must also be
submitted for the approval of Council. The developer shall comply with the
requirements of such approved management plan in the conduct of the development
of the site. a

TOOT Fas

Log in to download the original (Original Conditions December 1994.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.