Original Conditions December 1994

of 23

Page text read automatically using OCR, there may be inaccuracies

4.4

4.5

4.6

4.7

4.8

5.0

5.1

6.0

6.1

All cleared vegetation is to be suitably processed or removed from the site at the
developer's expense by a method approved by the Shire Engineer. Burning off is
not considered an acceptable means of disposal and will not be approved.

The developer shall construct a public boardwalk/pathway system--along the
Esplanade frontage of the site and connecting to a public road nominated by
Council. The design and standard of construction shall be the subject of detailed
design plans to be submitted and approved by Council prior to construction. All
such works shall be completed to the satisfaction of the Shire Engineer. The
boardwalk/pathway system may be constructed in stages but shall be completed
prior‘to any further building permits being issued after 60% of the multiple dwelling
units have building permits issued, or within 3 years of the first certificate of
classification being issued for any building associated with the project, whichever is
the sooner.

This approval does not permit improvements in the foreshore at Laké Weyba or
Weyba Creek and the proposed beach is not approved.

Detailed landscaping plans shall be submitted for the approval of Council for each
area the subject of a building application or on application for excavation or filling.

All landscaping shall be completed in accordance with the approved Landscape
Design Report, the landscaping plans approved by Council (and the landscaping
plans approved by Council for areas of clearing, fill or works. for which an
Approval is not required). Landscaping shall be maintained at all times to the
reasonable satisfaction of the Shire Planner.

All fertilising, pest and weed control measures shall be carried out in accordance
with the approved Landscape Design Report.

WORKS PROGRAMME

A Works Programme shall be prepared by the developer detailing ‘lead' times 5 for
all construction.

SEWERAGE

The Developer shall, prior to the commencement of Stage 1 of the works, submit to
the Shire Engineer for approval plans for the sewerage reticulation system referred
to in 6.2 hereof. The design of the reticulation system shall meet Council's and the
Department of Local Government's Standards. As part of that system, the
developer shall submit proposals to prevent sewage from entering the groundwater,
and existing surface water system as a result of any mechanical, electrical or other
failure in any pump station. Such proposals may include storage tanks on the
development site for the temporary storage of 24 hours A.D.W.F., and appropriate
valves.

Log in to download the original (Original Conditions December 1994.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.