190629 AGLA Essence David Low Way (215), Peregian Beach issue C
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
GENERAL NOTES
STRUCTURE AND BENCH SEATING
A. ARCHITECTURAL WORKS INFORMATION ORGANIC MULCHING - BULK PLANTING AREAS
Refer to Architect's drawings for all information contained within these documents related to and nominated as GENERALLY: Design and construct shelter structure with incporated seat in the location as shown on the
Architectural Works. This includes all hardscape items such as paving, outdoor structures / shelters, walls and GENERALLY: Proposed mulch must comply with Australian Standards AS4454-2003. drawings. The images and landscape drawings show the extent and design intent and the final finish should be
coherent with similar elements on site or as discussed with the landscape architect.
fencing. Architectural Works information contained within these documents are indicative only and not for ANDREW GOLD LANDSCAPE ARCHITECTURE
construction or certification purposes. MATERIAL: Spread 1" Hoop Bark to a minimum depth of 100mm entirely over planting bed areas as indicated
on the drawings. The construction methodology, timber sizes, finishing, fixings, wind loading, footings and final design will be PO BOX 5220
B. CIVIL WORKS INFORMATION undertaken by an engineer/ builder to the landscape architects approval. MT GRAVATT EAST
SUPPLIER: Centenary Landscape Supplies Ph (07) 3373 4999 or equal approved. QLD 4122
Refer to Civil Engineer's drawings for all information contained within these documents related to and
nominated as Civil Works. Civil Works information contained within these documents are indicative only and T 07 3420 0006
not for construction or certification purposes. INORGANIC MULCHING - AS INDICATED TIMBER GARDEN EDGE M 0405 389 243
E [email protected]
C. STRUCTURAL WORKS INFORMATION GENERALLY: Install inorganic mulch to a minimum of 75mm entirely over planting areas as indicated on the GENERALLY: Install to the locations as indicated on the drawings.
Refer to Structural Engineer's drawings for all information contained within these documents related to and drawings. Weed mat to be installed in all areas of inorganic mulch.
nominated as Structural Works. This includes retaining walls. Structural Works information contained within MATERIAL: Sawn hardwood of Durability Class 1 as defined in Appendix D of AS 1604 or CCA treated
these documents are indicative only and not for construction or certification purposes. MATERIAL: Inorganic mulch to be Tenterfield Pearl 20-40mm subject to sample. softwood.
SIZE: 3000 x 100 x 15mm nominal edgings, 50mm square pegs, 350mm long.
ORGANIC MULCH - 1 INCH HOOP BARK INORGANIC MULCH - 'TENTERFIELD PEARL' DECORATIVE BOULDERS
D. ELECTRICAL WORKS INFORMATION SUPPLIER: Centenary Landscape Supplies Ph (07) 3373 4999 or equal approved. INSTALLATION: Set edgings flush with adjoining surfaces to define planting, grass areas, pathway edges, etc.
Refer to Electrical Engineer's drawings for all information contained within these documents related to and Fix to pegs with galvanized nails, two per fixing. Drive pegs into the ground at 1200-1750mm centres on the
nominated as Electrical Works. Electrical Works information contained within these documents are indicative SANDSTONE STEPPERS turf side of the edging and on both sides of joints between boards with peg tops 15mm below top of edging.
and not for construction or certification purposes. CURVING: Where the timber edge is to be curved, space the pegs to hold it to a uniform curve.
GENERALLY: Use natural stone, which is uniform quality in each grade, sound and free from defects liable to
E. HYDRAULIC WORKS INFORMATION affect its strength. BIO-RETENTION BASIN
Refer to Hydraulic Engineer's drawings for all information contained within these documents related to and
nominated as Hydraulic Works. Hydraulic Works information contained within these documents are indicative SIZE: Random steppers to average approx. 400mm but varying in size/ shape for visual interest with gap of Refer to Engineering drawings for bio-retention details. Prior to planting, ensure installation of erosion control
only and not for construction or certification purposes. approx. 150 – 200mm between to allow for planting. matting (ie: Jutmaster Fine by Geofabric Australasia), secured as per manufacturer's recommendations.
SIZE: Regular steppers to be 300 x 1500mm min 20mm thickness or equal approved IRRIGATION
LANDSCAPE SPECIFICATION NOTES
SUPPLIER: Sandstone World Ph 0431 285 425 or equal approved. Planting plan has been designed to survive without an automatic irrigation system. Water additives and water
LEVELS-GENERAL NOTES
retention elements, along with hardy water-wise plants will ensure an irrigation system is not imperative to the
Finish organic mulch surfaces 25 - 40mm below adjacent paving surfaces and / or edging. Finish lawn surfaces
LAYING: Subgrade to be fully compacted before mortar bed is laid. Subgrade shall be compacted 95% of long-term maturation and survival of the proposed plants. If approved, install an automatic, fixed position, low
flush with adjacent paving surfaces and / or edging. Ensure adequate falls in finished surface levels away from
medium dry density. Mortar to comply with AS 3700 and match sandstone colour as new. Stone should vary in pressure sprinkler irrigation system to all landscaped areas shown on the drawings internal to the site only, to
buildings to drainage collection points (eg, field inlets, etc).
size and shape for interest and naturalistic look. Noosa Shire Council approval. The irrigation shall meet the following performance requirements and as per the
manufacturers and/or installers specifications:
SUBSOIL DRAINAGE - GENERAL NOTES
CONCRETE AND PAVING • Summer target application of 32mm
Ensure adequate subsoil drainage elsewhere by installing suitable agricultural drainage systems where
• Fully automatic and metered
necessary, and especially in areas subjected to site excavation works including retaining walls.
GENERALLY: Install exposed aggregate and coloured concrete footpaths, driveways and roadways in the • Recycled water use (from rainwater tanks)
locations and to the extents as shown on the drawings. Refer drawings for the locations and extents of the • Commercial quality fittings and fixtures
PLANTS below types. • Mainlines
• Dripline system under mulch SANDSTONE REGULAR STEPPERS SANDSTONE RANDOM STEPPERS
• NATSPEC shall apply to trees where Council requires this certification. Type 1 Driveway: Boral exposed aggregate to match ‘Black night’ mix or equal approved based on supplied • RPZ backflow prevent device
• Plants are to be good quality nursery stock from a NIASA Accredited nursery sample. Level of exposure to be determined following sample.
• They shall be fundamentally free of pest and diseases. All design and documentation, materials supplied and work carried out should be in accordance with the
• After installation they shall be thoroughly watered. Type 2 Entry: Portland grey standard concrete trowel finish. Approval based on supplied sample. Not float current relevant Australian Standards and best practice.
edges. Trowel finish to be even across whole pour section.
TURF PLANT ESTABLISHMENT / CONTINUING MAINTENANCE
Type 3 Footpath: CCS Full depth coloured concrete sand colour or equal approved based on supplied sample.
SUBGRADE PREPARATION: Allow a 12 WEEK Plant Establishment Period from Practical Completion to the satisfaction of the Landscape
Turfed areas shall be prepared initially by removing all deleterious material Type 4 Footpath: Portland grey standard concrete trowel finish. Approval based on supplied sample. Not float Architect.
Cultivate subgrade surface by thoroughly ripping to a minimum depth of 150mm before spreading topsoil edges. Trowel finish to be even across whole pour section. • Maintain adequate watering regime
unless otherwise directed (ie: no cultivation under trees to be retained) • Remove weed growth from all mass planting beds and turfed areas
Type 5 Roadway: CCS Full depth coloured concrete ‘Black 44’ or equal approved based on supplied sample. • Fertilise (as per the notes above)
SOIL: Depth and construction detail of roadway to engineer’s detail. • Weed control (as per the notes above)
Spread turf underlay topsoil to a minimum depth of 100mm unless otherwise directed. Proposed topsoil must • Prune planting, control pest and disease management (as per the notes above) to maintain healthy growth
comply with Australian Standards AS4419-2003 and described as 'Soil blend'. Type 6: Open jointed pavers located within the lots to be 400 x 400 x 40mm paver to match Boral Exposed • Replenish mulch material where necessary
aggregate ‘Coral Coast’ or equal approved based on supplied sample . • Replace dead / dying plant material
TURF: • Reinstate stakes, ties and marker stakes where necessary
To be fundamentally free from weeds and disease or other deleterious substances. Supplier: Exposed aggregate mixes to be Boral Ph 1300 305 980 and coloured concrete pigment to be CCS • Reinstate erosion control matting and other erosion control measures as necessary
• Turf to be Sir Grange (Zeon Zoysia) for all areas within the project designated as 'turf' (Concrete colour systems) Ph 1800 077 744
Continue maintenance works beyond Plant Establishment Period as required.
Supplier: Refer Lawn Solutions website for local growers https://lawnsolutionsaustralia.com.au/turf-suppliers/ or Joints: Construct joints in the patterning as shown on the drawings. Approximate locations of joints shown.
call 1300 883 711. Adjust accordingly to suit engineer’s requirement of frequency and types. MANAGEMENT PLAN/S:
INSTALLATION: DECORATIVE BOULDERS The turfed areas shall be throughly watered on the day of turf installation and then as follows at the equivalent CONCRETE PAVING TYPE 1 DRIVEWAY CONCRETE PAVING TYPE 3 FOOTPATH
Turf shall be close turfed with staggered cross-joints and laid in straight lines, running perpendicular to the of 5l/m², including natural rainfall, or as required to maintain active healthy growth.
direction of slope (and / or parallel to contours). GENERALLY: Place and secure decorative boulders in the locations as indicated on the drawings. Boulders to
Proposed topdressing soil to comply with Australian Standards AS4419-2003 and as described as be placed in a naturalistic and artistic arrangement. Weeks 1-3: Twice a week
'Topdressing'. Weeks 3-12: Once a week or as necessary
All joints shall be filled with an approved topdress light soil or sand and the turf shall be lightly rolled. MATERIALS: Boulders to range in size and vary between 400 x 400, 600 x 600 and 900 x 900 depending on
Finished levels shall be 3mm below surrounding surface levels to allow for future top dressing. Allowance the locations and availability. Source boulders to match with sandstone and gravel materials. If no irrigation, apply the above rates to the mass planting beds. Watering to use rainwater tanks if possible.
should be made for shrinkage and settling.
Turf shall be adequately watered once installed, refer Management Plan/s. GRAVEL TO FOOTPATH SPECIAL NOTE
Ensure protection from trampling.
GENERALLY: Install feature gravel to a minimum of 75mm in the locations as indicated on the drawings. Accord particular diligence to the following prime items:
FERTILISER:
Fertiliser to be applied to the turf at the rates and period of time from installation as recommended by the MATERIAL: Gravel to be Tenterfield Pearl 20-40mm subject to sample. TOPSOIL QUALITY and SUBGRADE PREPARATION as specified.
supplier. If no starter Fertiliser supplied by the supplier, we recommend:
Dynamic Lifter Turf Starter: SUPPLIER: Centenary Landscape Supplies Ph (07) 3373 4999 or equal approved. PLANT QUANTITY: Use only consistently well nurtured nursery stock from an approved supplier. Check with
http://www.yates.com.au/products/fertilising/organic-based/dynamic-lifter-turf-starter/ Landscape Architect where species substitutions must be made.
#tbCQXOZuFJZ01z1B.97 LIGHT BOLLARDS
Lawn Builder™ Seed & Turf Starter Slow Release Lawn Fertiliser: MAINTENANCE: Ensure a continuing maintenance program, including weed/disease, fertilising, watering (but
https://www.scottsaustralia.com.au/scotts-brands/lawn-builder/lawn-builder-slow-release- GENERALLY: Bollard lights to be installed under the electrical contract. If they are installed prior to landscape beware of over-watering) and replacement of ailing plant material.
lawn-fertilisers/lawn-builder-seed-turf-starter-slow-release-lawn-fertiliser/ works, ensure they are protected and maintained during works or rectified with like for like if damaged during
works. GUARANTEE
SOIL WETTING AGENT: Failure to adequately address these items, best practice and relevant Australian Standards WILL result in a
We recommend the application of a soil wetting agent wetting agent (ie: non biodegradable detergent not Refer engineer’s drawings for specification and locations as required. sub-standard landscape outcome. CONCRETE PAVING TYPE 2 ENTRY CONCRETE PAVING TYPE 5 ROADWAY CONCRETE PAVING TYPE 6
crystals) to stop hydrophobia if not already in the starter fertiliser supplied with the turf, at the rates
recommended by the manufacturer:
AND TYPE 4 FOOTPATH
FENCING
• Scotts Hydraflow Wetta Soil
• Searle’s Penetraide GENERALLY: Install fencing, screens, gates and associated locks and fixings in the locations as shown on the
• Plant of Health Soils Soaker drawings. The construction, finishing, fixings, wind loading, footings and final design will be undertaken by an
engineer/ builder. The images and landscape drawings show the extent and design intent and the final finish
WEEDS, PESTS DISEASE MANAGEMENT should be coherent with similar elements on site or as discussed with the landscape architect.
Weeds are required to be removed by physical or chemical (Glyphosate or other herbicides) means. If chemical
means, as per the manufacturer recommendations. Refer to the following reference for guideline on weeds, FENCE TYPE A1: 1500mm or 1800mm high fence (in outdoor shower locations) with 50 x 50mm timber
pest and disease management battens (or composite wood as approved) spaced at 50mm or 100mm spacings as indicated on the drawings.
REFERENCE: Colour finish to match house colour that it is located next to. Confirm with Architect on site.
http://thelawnguide.com.au C 28/06/19 FOR TENDER
B 28/06/19 FOR REVIEW
FENCE TYPE A2: 1500mm fence with 50 x 50mm battens at 50mm spacings fixed atop retaining wall. Colour
PLANTING BEDS A 26/06/19 FOR REVIEW AND COORDINATION
finish to match house colour that it is located next to. Confirm with Architect on site.
SUBGRADE PREPARATION: FENCE TYPE B Pool Fence: By others, refer Architects Drawings ISSUE DATE REASON
Cultivate subgrade surface by thoroughly ripping to a minimum depth of 150mm before spreading topsoil.
FENCE TYPE C Proposed Fire Protection Fence: By others, refer Architects Drawings THIS DRAWING HAS BEEN PREPARED WITH ALL CARE FROM BASE INFORMATION AVAILABLE AT
TOPSOIL: THE TIME OF PREPARATION. ALL EXISTING AND RETAINED ELEMENTS ARE SHOWN
Spread topsoil to a minimum depth of 300mm unless otherwise directed. Proposed topsoil must comply with FENCE TYPE D1 Boundary: 1800mm high fence with 100 x 100mm posts and 100 x 10mm timber capping and INDICATIVELY ONLY. THE LOCATION OF THESE ELEMENTS ARE BASED FROM SURVEY
INFORMATION. ALL PLANS AND DETAILS ARE TO BE READ IN CONJUNCTION WITH ALL
Australian Standards AS4419-2003 and described as 'Soil blend'. plinth. 100 x 20mm battens to be angled to obscure views through. RELEVANT CONSULTANT'S DOCUMENTATION PACKAGES, INCLUDING (BUT NOT LIMITED TO)
Provide certification of soil types delivered to site, as per AS4419-2003. ARCHITECTURAL, CIVIL, STRUCTURAL, HYDRAULIC, ELECTRICAL, LIGHTING AND SIGNAGE
DOCUMENTATION. ALL ABOVE AND BELOW GROUND SERVICE LOCATIONS ARE SHOWN
FENCE TYPE D2 Boundary Fence Acoustic: By others, refer Architects Drawings
INDICATIVELY. REFER TO THE RELEVANT ENGINEERS DRAWINGS AS REQUIRED. ALL
FERTILIZER:
DIMENSIONS ARE TO BE VERIFIED ON SITE.
A slow or controlled release fertiliser organic or inorganic to be incorporated generally into the imported (or FENCE TYPE E Bin Enclosure: 1500 - 1800mm high fence/ gate with 50 x 50mm battens at 50mm spacings. FENCE TYPE A1 FENCE TYPE D1 FENCE AND GATE TYPE E FENCE AND GATE TYPE E
excavated / site topsoil). We recommend the following: Height of fence/ gate to be 1800mm for front access and 1500mm high for bin enclosures.
Inorganic Slow or Controlled Release fertilisers:
• Osmocote ENTRY FEATURE
• Nutricote
• Macrocote GENERALLY: Construct a major and two minor signage/ features in the locations as shown on the drawings.
• E-Scape PRO by eCo-Enviroment See indicative images to show materials, design intent and general proportions.
Organic slow release: All required fixings, footings, and construction methodology to engineer's / builder's confirmation and
• Dynamic Lifter
• Organic Link by Plant of Health
Landscape Architect's approval. Final locations, extent and positioning to Landscape Architect's approval and
may require the construction of a plinth to ensure visibility and appropriate finished levels.
ESSENCE OF PEREGIAN BEACH
WETTING AGENT:
215 DAVID LOW WAY, PEREGIAN BEACH
MATERIALS: Stone cladding from Eco Outdoor 'Cracken Back' Ph1300 131413. Project logo, lettering font and
A wetting agent and / or soil ameliorant including a wetting agent is required to all mass planting beds: sizing to be confirmed by project marketing / branding consultant.
• Scotts Hydraflow Wetta Soil
• Searle’s Penetraide Plant of Health Soils Soaker
• Multipro by eCo-Enviroment
LANDSCAPE WORK NOTES
PLANTING:
As indicated on plan.
JOB No. SHEET No. ISSUE DRAWN BY CHECKED BY
19.021 1 C CP/NB AG/NC
STRUCTURE AND BENCH SEATING SHELTER STRUCTURE
NOT FOR CONSTRUCTION
See the original