MCU15/0034 - Advice Agency Response

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Aurecon Group for NBN Co                         3                              L12 on RP883248

    7.   In order for Powerlink Queensland to maintain and operate a safe and reliable
         supply of electricity, we require unrestricted 24-hour access to our infrastructure.

         Typically such access must be suitable for a 4WD vehicle but to a standard no less
         than existing, and the need for access by a 100-tonne crane must also be
         considered.

         If it is envisaged that there will be any interference to our current access
         arrangements; we require that the applicant contacts our Maintenance Service
         Provider: Richard Beames ph (07) 3860 2111 to formalise unrestricted 24-hour
         access arrangements for Powerlink Queensland.


Enclosures:-                  Annexure "A"
                              Overall Site Plan" 4GYM-51-32.SCHR-C2   Rev 02 dated 23/0412015
Log in to download the original file

MCU15_0034 - Advice Agency Response.pdf · 2.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.