Skip to the record
The gold standard in government transparency.

Council archive · source document

APPROVED Plans for Negotiated Decision Notice · 142009.1382

of 16

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (11.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
PROPOSED TEMPORARY CONSTRUCTION = ~
\— BATTER 1v TO 1.5h IN ACCORDANCE WITH yt
GEOTECHNICAL REPORT J

PROPOSED BUILDING RETAINING STRUCTURE

REFER FUTURE STRUCTURAL ENGINEERING
DRAWINGS

“

 

 

 

 

 

 

   
 

 

 

 

 

 
 

 
  
    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

  
 
 
 
 
   

 

     

 

é \
i
/ ~ , DENOTES TEMPORARY SEDIMENT FENCE
/ ~ Bs od FINAL EXTENT TO BE REVIEWED AND
/ a a DETERMINED ON SITE
{ | x WALL HEIGHT 1.8m
| -—— DENOTES APPROX LOCATION OF
2 Li. TREES TO BE RETAINED, CONFIRM
: WITH LANDSCAPE DRAWINGS
z| ,
2 |
2 | \
“| \
eae i
Lu
Lu |
| a \ TN
<x ba \
a | | \] \ YY
Zz \ | Mid \ M
<< ! \d oN,
a | \ | \
i ~
fa | ROCK FILTER DAM WITH OVER-TOPPING CREST
i | LOCATED AT CENTER LINE OF LEVEL SPREADER
| \ | ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
! |
| } \ CONSTRUCT LEVEL SPREADER
\ | + DURING INITIAL EARTHWORKS STAGE
\ \ h REFER SHEET 8 FOR DETAILS
eS | \ : M\\ a
| \ } \ i
| \
\ | \ \ —“ om EXCAVATE DETENTION BASIN DURING INITIAL
\\ | { \ EARTHWORKS STAGE
Ee
| ‘| \ WALL HEIGHT 1.4m\ a THO STOO S TT eT eniaeqygeb ANU LCUUSE FLAY
shin atieeiene> Council
ALTERNATIVELY CONSTRUCT FULL DETENTION BASI
pnt P mit Pperational Works No: e8@09 :/382...0
7 - 2d 09/7 3&2
i" e _/ RECOMM p FOR APPROVAL: y
\ _ pr \
OPOSED TEMPORARY \
| \ \ CONSTRUCTION ACCESS can DENOTES TEMPORARY SEDIMENT FENGE | inder no aes may the Plan & ‘ ns be departed
| \ Sine PLAN ee enh Cleese eWeU AND from within the written approval of Council
\ SCALE 1-200 DETERMINED ON SITE 0 Dp ;
\ se
| PLANS APPROVED
PROPOSED TEMPORARY CONSTRUCTION PROPOSED BUILDING RETAININ i Ff TURE
ELANDA BATTER 1v TO 1.5h IN ACCORDANCE WITH REFER ATURE STRUCTURAL ENG
STREET GEOTECHNICAL REPORT Name: ...
— PROPOSED BUILDING OUIENE / | XCAVATE DETENTION BASIN DURINGHNITIAL
TO | | Lo | EARTHWORKS STAGE Signature: ....... ae
"s f | _ LINE SIDES WITH GEOFABRIC AND LOSE PLACED Delege CAQSISFALT EROGM WITH OVER-TOPPING CREST
| cut J STONE PITCHING AS REQUIRED AT-GENTERLINE OF-LEVEL-SPREADER —
| PAD LEVEL 48.40 ALTERNATIVELY CONSTRUCT FULL DETENTIONBASIN / ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
=y ' /
Rk /
dl CONSTRUCT LEVEL SPREADER
SECTION A DURING INITIAL EARTHWORKS STAGE
SCALE 1 200 REFER SHEET 8 FOR DETAILS

CONTOUR

Consulting Engineers :

F

E

AT 43-45 €LANDA ST. SUNSHINE BEACH
FOR OAK INVESTMENT HOLDINGS P/L

: 5 APARTMENT DEVELOPMENT
z

 

 

 

 

 

Rev | pate | COMMENT PLAN DETAILS.

    

oe Designed. BPL
ay ™ a Drew RM
Checkect AWS

atu: ‘AHO

may 08

PUAN TITLE:
€ARTH WORKS, SEDIMENT AND
EROSION CONTROL PLAN

 

 

 

 

revson 8

punns S083 - OPW3

|

Used in these records

About this file

File size
11.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

APPROVED Plans for Negotiated Decision Notice.pdf · 11.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.