Council archive · source document
APPROVED Plans for Negotiated Decision Notice · 142009.1382
Plans and drawings: the text below has words only, no drawings.
Very large file (11.3 MB): may take a few minutes to open.
PROPOSED TEMPORARY CONSTRUCTION = ~
\— BATTER 1v TO 1.5h IN ACCORDANCE WITH yt
GEOTECHNICAL REPORT J
PROPOSED BUILDING RETAINING STRUCTURE
REFER FUTURE STRUCTURAL ENGINEERING
DRAWINGS
“
é \
i
/ ~ , DENOTES TEMPORARY SEDIMENT FENCE
/ ~ Bs od FINAL EXTENT TO BE REVIEWED AND
/ a a DETERMINED ON SITE
{ | x WALL HEIGHT 1.8m
| -—— DENOTES APPROX LOCATION OF
2 Li. TREES TO BE RETAINED, CONFIRM
: WITH LANDSCAPE DRAWINGS
z| ,
2 |
2 | \
“| \
eae i
Lu
Lu |
| a \ TN
<x ba \
a | | \] \ YY
Zz \ | Mid \ M
<< ! \d oN,
a | \ | \
i ~
fa | ROCK FILTER DAM WITH OVER-TOPPING CREST
i | LOCATED AT CENTER LINE OF LEVEL SPREADER
| \ | ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
! |
| } \ CONSTRUCT LEVEL SPREADER
\ | + DURING INITIAL EARTHWORKS STAGE
\ \ h REFER SHEET 8 FOR DETAILS
eS | \ : M\\ a
| \ } \ i
| \
\ | \ \ —“ om EXCAVATE DETENTION BASIN DURING INITIAL
\\ | { \ EARTHWORKS STAGE
Ee
| ‘| \ WALL HEIGHT 1.4m\ a THO STOO S TT eT eniaeqygeb ANU LCUUSE FLAY
shin atieeiene> Council
ALTERNATIVELY CONSTRUCT FULL DETENTION BASI
pnt P mit Pperational Works No: e8@09 :/382...0
7 - 2d 09/7 3&2
i" e _/ RECOMM p FOR APPROVAL: y
\ _ pr \
OPOSED TEMPORARY \
| \ \ CONSTRUCTION ACCESS can DENOTES TEMPORARY SEDIMENT FENGE | inder no aes may the Plan & ‘ ns be departed
| \ Sine PLAN ee enh Cleese eWeU AND from within the written approval of Council
\ SCALE 1-200 DETERMINED ON SITE 0 Dp ;
\ se
| PLANS APPROVED
PROPOSED TEMPORARY CONSTRUCTION PROPOSED BUILDING RETAININ i Ff TURE
ELANDA BATTER 1v TO 1.5h IN ACCORDANCE WITH REFER ATURE STRUCTURAL ENG
STREET GEOTECHNICAL REPORT Name: ...
— PROPOSED BUILDING OUIENE / | XCAVATE DETENTION BASIN DURINGHNITIAL
TO | | Lo | EARTHWORKS STAGE Signature: ....... ae
"s f | _ LINE SIDES WITH GEOFABRIC AND LOSE PLACED Delege CAQSISFALT EROGM WITH OVER-TOPPING CREST
| cut J STONE PITCHING AS REQUIRED AT-GENTERLINE OF-LEVEL-SPREADER —
| PAD LEVEL 48.40 ALTERNATIVELY CONSTRUCT FULL DETENTIONBASIN / ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
=y ' /
Rk /
dl CONSTRUCT LEVEL SPREADER
SECTION A DURING INITIAL EARTHWORKS STAGE
SCALE 1 200 REFER SHEET 8 FOR DETAILS
CONTOUR
Consulting Engineers :
F
E
AT 43-45 €LANDA ST. SUNSHINE BEACH
FOR OAK INVESTMENT HOLDINGS P/L
: 5 APARTMENT DEVELOPMENT
z
Rev | pate | COMMENT PLAN DETAILS.
oe Designed. BPL
ay ™ a Drew RM
Checkect AWS
atu: ‘AHO
may 08
PUAN TITLE:
€ARTH WORKS, SEDIMENT AND
EROSION CONTROL PLAN
revson 8
punns S083 - OPW3
|
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPROVED Plans for Negotiated Decision NoticeRelated documentApplication case desk ↗
About this file
- File size
- 11.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.