FINAL PAVEMENT DEPTH TO BE CONFIRMED FOLLOWING
SITE SOIL TESTS UNDERTAKEN IN THE EXCAVATED ROAD
BOX BY THE GEOTECHNICAL CONSULTANT
CONTOUR : 5 APARTMENT DEVELOPMENT
AT 43-45 ELANDA ST, SUNSHINE BEACH
FOR OAK INVESTMENT HOLDINGS P/L
Consulting Engineers =
F s G =
LAYOUT PLAN
SCALE 1-200
A e
RT OF ANY CONSTRUCTION
CATION WORKS QUE TOD:
ALL BE BORNE BY THE CONT
WORKS PRIOR TO THE
DENOTES EXISTING > XISTING CONCRETE 8
; SURFACE LEVEL JOIN NEATLY TO EXISTING EXISTING ROAD & 3S Pr Eareen 8
| | KERB & CHANNEL CENTRELINE Y RS | 9
| | LEVEL TreIcaL \ | os er & a
: ——— EXISTING CONCRETE eee = eee
| \ FOOTPATH _
| | a BAU ets es eee eee creas ee eee ee es RS ee
' ~ 10
ROADWORKS NOTES = = JON NEATLY TOExisTing — 3-00
"ILL PUBLICA PRIVATE UTILITY SERVICES PROR 10 CORMIENCENENT DENOTES EEN ° FOOTPATH
L ct ENCEN
OF ANY CONSTRUCTION WHERE UTILITY SERVICES ARE SHOWN ON NEW PAVEMENT SEAL !
THE PLANS. THEY ARE SHOWN FOR THE INFORMATION OF THE 30 000
CONTRACTOR ONLY THE PRINCIPAL SHALL NOT BE LIABLE FOR ANY ors 4620
OMISSION OF SERVICES FROM THE PLANS OR THE ACCURACY OF ANY 1
SERVICES SHOWN ON THE PLANS, 2330 a
2 SURFACE LEVELS OVER THE SITE HAVE BEEN INTERPOLATED THROUGH | / & NEW 1.5m WIDE 2
COMPUTER MODELLING OF FIELD SURVEY DATA THESE CALCULATED ies J ed oe | & or CONCRETE FOOTPATH ao.
LEVELS MAY VARY FROM THE ACTUAL GROUND LEVEL HT) 1 wo AP | 9° gz
3. ALL CONSTRUCTION LEVELS SHALL BE SET BY THE CONTRACTOR WITH Lu 7 4° 1.19 4° 21% S a
REFERENCE TO SURVEYED BENCH MARKS PROVIDED BY THE a | x x : a 4
PRINCIPAL'S APPOINTED SURVEYOR k= a
4 SUBGRADE EVALUATION iS TO BE UNDERTAKEN IN ACCORDANCE WITH n” ' | i }
THE PROCEDURES OUTLINED IN ARRB SR41 - A STRUCTURAL DESIGN a | | DATUM 51.0 j: I cssrvass: axstener eaarenenaiy eee eeeeieins ee EES eS
GUIDE FOR FLEXIBLE RESIDENTIAL STREET PAVEMENTS, SY eee ENT Me RG
5 ALL KERBING SHALL CONFORM TO NOOSA SHIRE COUNCIL'S. z | +— NEW SEMI-MOUNTABLE 20.000 7 “~
RELEVANT STANDARD DRAWINGS, 4 i KERB & CHANNEL SAW CUT EXISTING PAVEMENT \— SUB-SOIL DRAINAGE IN
6 PAVEMENT MARKINGS AND SIGNS PROVIDED IN ACCORDANCE WITH ug | AND JOIN NEATLY & SMOOTHLY ACCORDANCE WITH
THE QUEENSLAND MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. | NSC STD DWG
7 PROVIDE TELSTRA AND ENERGEX CONDUITS UNDER CONCRETE DRIVE. 1 |
WAYS, WHERE DIRECTED & 4760
8 SET-OUT OF ROAD AND DRAINAGE WORKS IS AVAILABLE TO CONTRACTOR 20 000 | | 8 NEW 1.5m WIDE CONGRETE FOOTPATH
FROM CONTOUR ENGINEERS DIGTAL MODEL pew om
| é REFER ARCHITECTS PLANS 8
FOR SET OUT . NEW 1.5m WIDE a.
| : ee CONCRETE FOOTPATH &
9)
i | & 1.8%
NOTE EXISTING CENTRE LINE —]
EXTENT OF CONNECTION TO BE DETERMINED ON SITE DURING | 22 SAE B ee
CONSTRUCTION BY ENGINEER & COUNCILS FIELD OFFICER I | DAUMSI0 ee ee
| | 10.000 NEW DRIVE OVER KERB AND
150 150 | CHANNEL IN ACCORDANCE
| | WITH NSC STD DWG No. 9001
TOTAL SEAL OVERLAP = 300mm t ~ SAW-CUT EXISTING |
(SMOOTH TRANSITION TO | | PAVEMENT EXISTING EDGE OF BITUMEN
EXISTING BITUMEN) \ |
| | :
10.000 | | kid Sunshine Coast Regional Coungil,
= mi “e x /. (nn >
EXISTING PAVEMENT : los / ’ e EXISTING CONCRETE 8
| NEW PAVEMENT | jay. Development Permit Operational Works No: .Z&r200@. /3S.2, J. | re FOOTPATH &
“
| 2007/13 2) e gz
INDICATIVE SAW-CUT DETAIL | RECOMMENDED FOR APPROVALS iY 255
SCALE 1:50 x S5mWiDE (i ie Ep Tocco re ==
| ' \ a a oes tei nem pep ecucanne 1 EXISTING DRIVE OVER
cumstances may the Plan & Specifications be d id KERB AND CHANNEL
RIVE OVER KERB | ‘ Leds u P e departe
30mm ASPHALTIC DRIVE OVE \ from within the written approval of Council. z
CONCRETE SURFACING AND CHANNE \ @LANDA STREET CROSS SECTIONS
| \ PLANS APPROVED F
FSL | SPALE 1:100
| '
—— | Date: ..
— | 0.338 ae
| 0.0001 | Name: . . .
100mm THICK BASE COURSE MATERIAL (TYPE 2.2) - CBR 60 MIN (SOAKED) ON | | JOIN NEATLY TO JOIN NEATUY Big MIBTENG (ee
100mm THICK SUB-BASE COURSE MATERIAL (TYPE 2.4) - CBR 45 MIN (SOAKED) ON | EXISTING KERB& ||| \ FOOTPATH ——e
% 100mm THICK LOWER SUB-BASE COURSE MATERIAL (TYPE 2.5)-CBR15MIN(SOAKED), || | | CHANNEL | 4 \ \ | 7
} \ ae 8
| | \ | 2 |
ASPHALTIC CONCRETE | H} = \| “ —_
OE | 2 | _-—— EXISTING CONCRETE
PAVEMENT DESIGN (INDICATIVE) | | 2 a FOOTPATH CAUTION - EXISTING SERVICES —_— = —+¥
SCALE 1:50 I \ 1 RACTOR IS TO DETERMINE THE EXACT LOCATION OF
% NOTE . ALL EX VICES IN THE VICINITY OF THE PROPOSED 3
DRIVE OVER KERB
AND CHANNEL
SCALE 1:20
gee STO A TET ES I SIS EEE EE I,
PLAN TITLE
EXTERNAL ROAD AND
FOOTPATH WORKS PLAN
reson BF ser 8 of @
punne S083 - OPS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPROVED Plans for Negotiated Decision NoticeRelated documentApplication case desk ↗
About this file
- File size
- 11.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.