Original source · versioned page text
Appendix D - Civil Engineering Report
The original of this document is very large (31.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 61, section 1. The text section number identifies this passage in the reader.
ROADS AND DRAINAGE CODE
Performance Criteria and Acceptable Solution
Hofmann Drive Medical Centre
1 August 2018
Issue A
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE
PO4 AO4 RO4
Roads and stormwater drainage infrastructure is proven to No solution provided Not applicable - No new public roads or stormwater drainage
be suitable for its use prior to Council accepting the infrastructure is proposed to be constructed as part of the
dedicated asset. development.
PO5 AO5.1 RO5.1
Alignment of stormwater drainage infrastructure is to allow The location, design and construction of stormwater Not applicable - No new public stormwater drainage
for easy access for the ongoing maintenance by Council. drainage structures is in accordance with Sections 4 and 5 infrastructure is proposed to be constructed as part of the
of PSP5, Engineering Design Standards - Roads, development.
Drainage and Earthworks;
AND
AO5.2 RO5.2
Where infrastructure is located on private land an Not applicable - No new public stormwater drainage
easement is dedicated over the infrastructure in infrastructure is proposed to be constructed as part of the
accordance with Section 4 of PSP 5, Engineering Design development.
Standards – Roads, Drainage and Earthworks.
Frontage works
PO6 AO6.1 RO6.1
Development is provided with external roadworks along the The following infrastructure components already exist at Complies – The frontage road to the development is fully
full extent of the frontage of the site to an appropriate the frontage of the site or are provided at the developer’s constructed.
standard having regard to the specified function of the road. expense—
a) full width sealed road;
b) concrete kerb and channel where appropriate;
l:\7000-7999\7700-7799\7700\codes\01-08-18 roads and drainage code.docx
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.