Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Appendix D - Civil Engineering Report

of 71

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (31.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 62, section 1. The text section number identifies this passage in the reader.

ROADS AND DRAINAGE CODE
Performance Criteria and Acceptable Solution
Hofmann Drive Medical Centre
1 August 2018
Issue A

             PERFORMANCE OUTCOMES                                                  ACCEPTABLE OUTCOMES                                                    RESPONSE

                                                                  c) forming and grading to footpaths;

                                                                  d) vehicular kerb and footpath crossings;

                                                                  e) a constructed bikeway;

                                                                  f) a constructed footpath;

                                                                  g) a constructed carriageway;

                                                                  h) required alterations to public utility mains, services or
                                                                  installations;

                                                                  i) construction of any required alterations to public utility
                                                                  mains, services or installations;

                                                                  j) stormwater drainage works; and

                                                                  k) installation of electrical conduits;

                                                                  AND

                                                                  AO6.2                                                           RO6.2
                                                                  Road and drainage design and construction is in                 Not applicable - No new public roads or stormwater drainage
                                                                  accordance with Sections 3 and 4 of PSP5 Engineering            infrastructure is proposed to be constructed as part of the
                                                                  Design Standards – Roads, Drainage and Earthworks.              development.




l:\7000-7999\7700-7799\7700\codes\01-08-18 roads and drainage code.docx
                                                                                               Page 6
Log in to download the original file

Appendix D - Civil Engineering Report.pdf · 31.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.