Council archive · source document
0015E693.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Works in tidal areas, coastal 5. 1s the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-_
management districts and fish habitat utenen in a wild river area)
areas
If you answered YES to Q5, and ticked any NO OC YES
boxes in Q6}, your application is required to be ooo, .
assessed against and must comply with the Wild | 6. The application is for one or more of the following:
Rivers Code. . . co . oy
if you answered YES to QS and ticked box 7) in Cc i) Operational works that is tidal works or works in a coastal management district (ensure you
Q6, your application is required to be referred to have completed Part M and/or Part P of Form 1); OF
the EPA. vs . : .
Note: If specifed works are roposed in aca (J ii) Operatio rks for the removal, destruction o1 9g plants (ensure you have
i rational works f |, destruction or damage of marine plants
government area, it is prescribed tidal work — the completed Part O2 of Form 1); Of
relevant local government will be the sem ae q . :
seeccsrent evager with the EPA as 2 {_] iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).
concurrence agency
If you answered YES to Q5, and ticked box ji) or
iti) in Q6, your application requizes referral to
OPIF.
{f you answered NO to Q5 and ticked box i} in
Q6, the application will not be accepted.
If you answered NO to Q5, ticked box fi) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or ff a
required permit is hetd, the application must be
assessed against and must comply with tha Wild
Rivers Code. Applications for purposes other
@ than specified works or as described above will
not be accepted.
If you answered NO at Q5 and ticked box iii) in
Q6, the application may be made if the works are
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located [email protected] more information about specified works refer
to Guide 27
Residential, commercial or industrial |7. _|s the application for residential, commercial or industrial development in a designated urban
development area
not subject to wild river requirements. Provided NO CJ YES
If you answered YES to Q7, your application is
there are no other aspects of this development
that require assessment against the relevant wild) 8° |f NO@oes the application for residential, commercial or industrial development involve:
river declaration or Wikd Rivers Code, you do not ‘ ; PP , e ; P ;
need to complete the remaining questions in i) a material change of use made assessable in a local government planning scheme
Section 2 (ensure you have completed Part D of Form 1); or
If you answered NO to Q7 and ticked either box . . . . .
i} oF ii} in Q8, the assessing agency is the [_] i) operational works associated with reconfiguring a lot (ensure you have completed Part F
relevant local goverment. The application must f F 1)
ofrorm 1).
be assessed against and must comply with the
Wild Rivers Code.
@ Animal husbandry activities 9. Does the application involve a material change of use for animal husbandry activities (as defined
Ifyou answered YES to Q9 your application under the Wild Rivers Act 2005) in a PA?
wires assessment against and must comply
vith the Wild Rivars Code. C] NO | YES (ensure you have completed Part R of Form 1)
The assessing agency is NRW.
Note: Applications for animal husband ry
activities will not be accepted if proposed in a
HPA, For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
Agricultural activities 10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
If you answered YES to Q10, your application oh
requires assessment against and must comply
with the Wild Rivers Cale. NO [_] YES (ensure you have completed Part Q of Form 1)
The assessing agency is NRW. . —
Note: Applications for agricultural activities wil | 11. If YES is the application for:
not be accepted if proposed in a HPA, For more ' : .
details and a definition of agricultural activities O i) a material change of use; or
see the Wild Rivers Act 2005 and refer to Guide C] il) operational works
2. .
Tha production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.
Page 12See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E693.001.pdfRelated documentPublic source context ↗
07/1646 - Preliminary building work assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.