Skip to the record
For the highest quality transcripts.

Council archive · source document

0015E693.001

of 30

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

°           .

                   INTEGRATED PLANNING ACT 1997                                                                                         IDAS Assessment Checklist, Version 20, 2 April 2007
                   Works that take overland flow water | 12.           tno. application involve works that take overland flow water in a HPA or an FMA?
                   The relevant wild river declaration will state
                   works that take overland flow water are either           NO                  [_} YES (ensure you have completed Part Ke of Form 1)
                   self assessable of assessable, or are exempt
                   from wild river requirements.                 13.   If YES, is the application for works stated in the relevant wild river declaration to be?
                   If you ticked Q13 i}, your application must be           .
                   assessed by NRW against the Wiki Rivers Code        [J i) assessable works
                  and must comply with the code.                       (J ii) self-assessable works
                   If you ticked Q13 fi) an application is not required     ee
                   to be made however the works must comply with       [J iti) exempt works
                   the relevant self-assessable section of the Wild
                   Rivers Code, otherwise the works become
                   assessable development for which an application
                   is required and must be assessed by NRW
                   against the relevant part of the Wild Rivers Code
                   and must comply with the code.
                    If you ticked Q13 ili} your application is not
                   subject to wild river requirements,
                   Applications for development that is other than
                   that stated to be assessable, self-assessable or
                   exempt will not be accepted.                                                                  t
                    Works that interfere with overland =| 14.          wen         application involve works that interfere with overland flow water in a FMA?
                    flow water                                              NO                       YES                          feted Part Kio of Form 1
                    The relevant wild river declaration will state                              [1] YES (ensure you nave completed       Part Kw of Form 1)
                    works that interfere with overland flow water that          :             oo                         .                    oo                  .
                    are either self assessable, assessable or exempt} 15. If YES, is the application for works stated in the relevant wild rivers declaration to be?
      @}            from wild river requirements.                       oO  .           bl     rk
                    If you ticked Q15 i), your application must be          i) assessable works
                    assessed by NRW against the Wild Rivers Code       {1} ii) self-assessable works
                    and must comply with the code.                          .
                    ff you ficked Q15 ii) an application is not required L iit) exempt works
                    to be made however the works must comply with
                    the relevant self-assessable section of the Wild
                    Rivers Code, otherwise the works become
                    assessable davelopment for which an application
                    is required and must be assessed by NRW
                    against the relevant part of the Wild Rivers Code
                    and must comply with the code.
                    If you ticked Q15 iil) your application is not
                    Subject to wild river requirements.
                    Applications for development that is other than
                    that stated tp be assessable, self-assessable or
                    exempt will not be accepted.
                    Waterway barrier works                        16.  Does the application involve building or raising waterway barrier works in a PA?
                    Applications for building or raising waterway     [Ac
                    barier works in a HPA will aot be accepted.              NO                  [_] YES (ensure you have completed Part Os of Form 1)
                    If you answered YES to Q16, your application
                    must be assessed by DPIF against the Wild
                    Rivers Code and must comply with the code.
   ®                Aquaculture (non ERA)                         17.   Does     je application involve aquaculture in a PA?
                    ee for aquaculture in a HPA will not be                   NO                 [] YES (ensure you have completed Part O; of Form 1)
                    If you answered YES to Q17, your application
                    must be assessed by DPIF against the Wild
                    Rivers Code and must comply with the code,
                    Works that interfere with waterina         | 18.    Does the application involve operational works that interfere with water in a watercourse that is in
                   watercourse                                         a nomjaated waterway in a PA?
                    Note: if the development is proposed in a HPA,
                    applications for all works that interfere with water      0                  [-] Yes (ensure you have completed the relevant Part K of Form 1)
                    in a watercourse (including dams or weirs,
                    stream realignment or stream diversion) willnot | 49° If YES
                    be accepted.                                               |              oo,           ;                       ;
                    in aPA, appications for instream dams and           [_} i) The application is for an instream dam or weir; or
                    weirs may be accepted in nominated waterways.           +.            eg                     ‘                   '           .           .                         '
                    ff you ticked box i) in Q48, your application wil   Cr) it) The application is for operational works that interfere with water in a watercourse, and is
                    nat be accepted.                                           for development other than a dam or weir.
                    Note: Operational works outside a HPA or
                    nominated waterway are not subject to wild
                    river requirements.
                    More information and locations of nominated
                    waterways is available by contact NRW,
                    accessing the department’s website
                    www.orw.gld dov.au or contacting the
                    department by email on:
                   wild. [email protected] aov.au.

                                                                                                          Page 13

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E693.001.pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.