Council archive · source document
0015E693.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
° .
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Works that take overland flow water | 12. tno. application involve works that take overland flow water in a HPA or an FMA?
The relevant wild river declaration will state
works that take overland flow water are either NO [_} YES (ensure you have completed Part Ke of Form 1)
self assessable of assessable, or are exempt
from wild river requirements. 13. If YES, is the application for works stated in the relevant wild river declaration to be?
If you ticked Q13 i}, your application must be .
assessed by NRW against the Wiki Rivers Code [J i) assessable works
and must comply with the code. (J ii) self-assessable works
If you ticked Q13 fi) an application is not required ee
to be made however the works must comply with [J iti) exempt works
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
If you ticked Q13 ili} your application is not
subject to wild river requirements,
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted. t
Works that interfere with overland =| 14. wen application involve works that interfere with overland flow water in a FMA?
flow water NO YES feted Part Kio of Form 1
The relevant wild river declaration will state [1] YES (ensure you nave completed Part Kw of Form 1)
works that interfere with overland flow water that : oo . oo .
are either self assessable, assessable or exempt} 15. If YES, is the application for works stated in the relevant wild rivers declaration to be?
@} from wild river requirements. oO . bl rk
If you ticked Q15 i), your application must be i) assessable works
assessed by NRW against the Wild Rivers Code {1} ii) self-assessable works
and must comply with the code. .
ff you ficked Q15 ii) an application is not required L iit) exempt works
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable davelopment for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
If you ticked Q15 iil) your application is not
Subject to wild river requirements.
Applications for development that is other than
that stated tp be assessable, self-assessable or
exempt will not be accepted.
Waterway barrier works 16. Does the application involve building or raising waterway barrier works in a PA?
Applications for building or raising waterway [Ac
barier works in a HPA will aot be accepted. NO [_] YES (ensure you have completed Part Os of Form 1)
If you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
® Aquaculture (non ERA) 17. Does je application involve aquaculture in a PA?
ee for aquaculture in a HPA will not be NO [] YES (ensure you have completed Part O; of Form 1)
If you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code,
Works that interfere with waterina | 18. Does the application involve operational works that interfere with water in a watercourse that is in
watercourse a nomjaated waterway in a PA?
Note: if the development is proposed in a HPA,
applications for all works that interfere with water 0 [-] Yes (ensure you have completed the relevant Part K of Form 1)
in a watercourse (including dams or weirs,
stream realignment or stream diversion) willnot | 49° If YES
be accepted. | oo, ; ;
in aPA, appications for instream dams and [_} i) The application is for an instream dam or weir; or
weirs may be accepted in nominated waterways. +. eg ‘ ' . . '
ff you ticked box i) in Q48, your application wil Cr) it) The application is for operational works that interfere with water in a watercourse, and is
nat be accepted. for development other than a dam or weir.
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.
More information and locations of nominated
waterways is available by contact NRW,
accessing the department’s website
www.orw.gld dov.au or contacting the
department by email on:
wild. [email protected] aov.au.
Page 13See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E693.001.pdfRelated documentPublic source context ↗
07/1646 - Preliminary building work assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.