ENGINEERING REPORT Address: 135 Lake Weyba Drive, Noosaville Applicant/Client: Wag Investments (Andres Gabarrin) 1. Background Tod Consulting have been engaged to provide technical advice on the impacts of a proposed development at 135 Lake Weyba Drive, Noosaville (Lot 1 RP 36729). The property is zoned for urban detached housing but is also within the flood hazard zone. It is also acknowledged that the southern section of Lake Weyba Drive becomes cut off from Weyba Rd during flood events which is a concern for Council. The purpose of this report is to assess the likely earthworks (filling) requirements to establish house sites within the proposed lots above the defined flood level, determine the impacts on the surrounding flood levels as a result of these works and how these will be mitigated/minimised, and to address stormwater management for the site. 2. Earthworks for house pads It is proposed to construct three house pads approx. 500m2 each within proposed lots 1, 2 & 3. Lot 4 contains an existing dwelling which will be retained and unaltered regarding floor level. Refer preliminary earthworks drawing attached. The defined flood level for the area is expected to be RL 2.0m AHD and the required freeboard 800mm due to proximity to Noosa River, giving an earthworks pad level of RL2.8m AHD. The existing ground level within the proposed house site areas varies between RL 1.25 and 1.50m AHD so filling of approximately 1.5m is required. Modelling of the earthworks has determined that the volume of fill required is in the order of 2310m3 of which 1067m3 is below the defined flood level (RL 2.0 AHD). It is estimated that approximately 500m3 of fill can be obtained within the existing site (below the defined flood level) with the balance being imported fill. 3. Flood assessment - Levels As noted above approximately 1067m3 of fill is required between the existing levels and the defined flood level to establish the house pad areas. The impacts on the surrounding flood levels as a result of this fill is partially offset by the cut within the site below the defined flood level of approx. 500m3, leaving a total of 567m3 of fill within the floodplain that has not been offset. This volume displaces flood waters in this area which has the potential to raise flood levels however as this volume is applied over the local flood plain area the impacts are virtually insignificant. Conservatively the area of the surrounding floodplain could be defined as the area upstream of the Eenie Creek Rd bridge over Weyba Creek. Arguably this could include the whole of Lake Weyba, however for this exercise this has been excluded. The attached plan shows and the floodplain in this area is over 390 Hectares. Once the displaced volume is applied over this area the increase in flood level that results is less than 0.15mm. 4. Flood assessment – emergency access As outlined in section 1 of this report Lake Weyba Drive is cut off during significant flood events which is a concern for Council in regard to providing access to emergency services. Whilst this is acknowledged due to mechanism of flood in this area residents have significant lead time warning them of such an event and can therefore self-evacuate (if they deem this necessary) prior to being cut off. This flood behaviour is outlined in section 2.6 of the Noosa River Flood Study 1995 (John Wilson & Partners and updated in 2000 by Lawson & Treloar) – extract attached. As noted in this section, “because of the influence of the four large lakes and relative effects of rainfall and storm surge flooding, flooding behaviour along the Noosa River, especially in its lower reaches is characterised by….the Noosa River floodplain being flooded to relatively low depths by generally slow moving floodwaters….Extended periods of relatively high flood levels……AND….A relatively long available 1 17623 - 135 Lake Weyba Drive – Engineering Report – Draft
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
warning time in which downstream residents can be alerted......flood levels can take from 1-2 days to
peak at Tewantin.”
For this reason, we believe that sufficient time is available for residents in Lake Weyba Drive to take
whatever action they feel necessary in the case of a pending flood. Note that as the proposed properties
will be located above the flood level, necessary action would exclude having to secure personal
possessions and property.
5. Stormwater Quality & Quantity
As the development is for only 4 lots (3 additional lots) and results in an impervious area of less than
25% of the developable area, in accordance with State Planning Policy (SPP – page 46) requirements
to meet water quality objectives do not need to be addressed with this development. Notwithstanding
the use of rainwater tanks for re-use on landscaped areas could be added as a deemed to comply
solution to meet the water quality objectives for the site. In regard to water quantity the increase in
impervious area will be in the order of 1250m2 (based on 85% of the house pad areas) which represents
approx. 6% of the total site area. As such detention to mitigate peak flows is not considered necessary.
6. Conclusion
We believe that this report demonstrates that the impacts from the proposed development regarding
flooding and stormwater management are minimal considering the number of lots created and the total
site area. As such we seek Councils support for the development application.
Prepared by
Doug Reynolds (RPEQ 9072)
Tod Consulting Pty Ltd
14 August 2017
2
17623 - 135 Lake Weyba Drive – Engineering Report – Draft