SUPERSEDED Decision Notice - Other Change - 132004 4029 01 & RAL22 0010 [As Published]
13.1. the use or erection of a building or other structure associated with the use, has not
been commenced by 4 November 2008, unless application is made and approved
by Council for an extension; or
13.2. the use of any premises pursuant to the Development Permit ceases.
14. The developer must obtain all of the other Development Permits referred to in the
Decision Notice, prior to obtaining a Development Permit for building works.
Land Development
15. DELETED.
16. DELETED.
Carparking
Off Street
17. DELETED.
18. A minimum of 4 car parking spaces must be provided on the site. The works must include
dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
19. DELETED.
Pathway Contributions
20. A pathway contribution of $68.00 towards external major pathways, in accordance with
Planning Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to
the Council prior to obtaining a Development Permit for Operational Works. This amount
will be subject to variations in the Price Index, All Groups Brisbane from June 2004 until
the date of payment.
Stormwater Drainage
21. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be generally in accordance with RECOR’s
Stormwater Management Plan (20220116-SWMP01) dated 27 September 2022.
Sewer Mains
22. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to
Council.
Town Water Supply
23. The site shall be connected to Council’s existing town water supply and be constructed
in accordance with Council’s standards and requirements at no cost to Council.
Service Easements
24. A registered easement shall be created over the existing sewer main that crosses the
site. The easements shall generally be parallel to and centred over the sewer main and
be equivalent in width to twice the depth to invert level of the sewer at the deepest point
within the allotment (measured from the finished surface) and be no less than 3.0 metres
wide.
In this regard, plans submitted for Operational Works approval shall accurately show the
location of the easement.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at
Page 5 of 20
Document Set ID: 22435165
Version: 5, Version Date: 23/05/2023