SUPERSEDED Decision Notice - Other Change - 132004 4029 01 & RAL22 0010 [As Published]
the Land Titles Office and any additional Titles Office forms or requisitions requiring the
consent of Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to
the use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
25. No building or other structure shall be constructed or encroach over an easement. Any
building or structure within proximity of an easement or any other public utility’s
underground must have its foundations designed so that no surcharge loads are
imposed upon such underground infrastructure. Foundations must be taken down a
minimum of 1 metre below a line of influence measured 1 metre in the direction of the
foundation from the centreline of the closest underground service and along the natural
angle of repose of the foundation soil type(s).
Plans, and supportive documents, detailing these proposed foundations shall be
designed by a registered practicing Geotechnical Engineer and submitted with the
application for a Development Permit for Operational Works.
Headworks
26. Contributions shall be paid to Council in accordance with Planning Scheme Policies
PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage
Headworks Contributions respectively and at the rates applicable at the time of payment.
An estimate only of the contribution rates as of June 2004 under the current policies is
as follows:
Water Supply $1,097
Sewerage $1,271
TOTAL $2,368
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should
the headworks contributions not be paid at the due time, Council shall call upon the
trading bank guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses
or is cancelled, the contribution or trading bank guarantee will be returned.
Erosion and Sediment Control
27. Any person acting on this permit shall prevent erosion and sediment export from leaving
the site. Site control measures such as silt fencing, controlled gravel access to the site
and controlled disposal of waste, will be necessary.
28. In this regard plans detailing the methods of controlling erosion and sediment are
required to be submitted to the Council for approval prior to obtaining a Development
Permit for Operational Works.
General
29. Any damage caused to any public utility during the course of construction shall be
repaired to Council’s standards and at no cost to Council.
30. Any alteration of any public utility or other facilities necessitated by the development of
the land or associated construction works external to the site shall be at no cost to
Council.
Page 6 of 20
Document Set ID: 22435165
Version: 5, Version Date: 23/05/2023