DESIGN INTENT OF PROPOSED WORKS: provide improved visitor and staff amenity to external areas - upgrade existing non compliant and stair and NOTES
access in courtyard 1. Remove defective and unsightly roof in level 1 courtyard 1 and balcony. Remove defective planter boxes in courtyard 1, and 2 Delta Panel colorbond surf mist
New roof and gutter, painted RF New roof corrugate to both sides. depth suitable
steel structure, Colorbond Delta replace with upgraded planter boxes. Reduce areas of metal roof and increase batten and shaded poly carbonate pergola structures to courtyards 1 and to spans as described
4 3 2
2. Provide shaded seating areas in both courtyards. Provide improved visitor access to courtyards 1 and 2.
1 prepare and paint all external walls
panel or equal. to equal same paint all existing
and exposed flashings, etc - 2 coats
area as removed. external walls
external grade paint - white TBS
upgrade all soft scape area - external
to building footprint. remove all weeds
and unhealthy plants, provide new
ld landscape works
sleected native ground cover to all
areas, provide new 300 deep weed free
Exit top soil and 100 deep hoop pine mulch.
rf r removed 116m2
rf n roof new 75m2
pgn pergola new 93m2
ld r landscape removed 39m2
ldn landscape new 23m2
p
New roof and gutter, painted works subject to Minor change
rd
steel structure, Colorbond Delta
panel or equal.
application shown blue dashed
p
p
New Pergola - powder coated
Aluminium frame and battens,
polycarbonate roof
proposed pergola
New roof and gutter, painted proposed structural line below -
steel structure, Colorbond Delta pergola basement
panel or equal.
p
p
61
rd
44
Loading bay rd rd
New powdercoated aluminium fixed
louvre sunshades
ROOF LANDSCAPED AREAS
Total revised metal roof area - 1223m2 - reduction from 1251 - 28m2 - (-)2.2% current
Pergola total landscaped area - site - 303m2
Courtyard 1 existing planter 1 - 5m2 planting area
proposed pergola above new external entry stair shown grey - 53m2- sits below existing Existing planter 2 - 35m2 planting area
parapet. refer to elevation refer page TD 19 elevations Proposed
Courtyard 2 existing planter 1 - 5m2 planting area
proposed roofed pergola - ground level - 40m2 Existing planter 2 - 34m2 planting area
additional pergola is 93m2 new planter 1 - 9m2 planting area
net increase of external shaded and rain protected areas - 65m2 new planter 2 - 5.2m2 planting area
revised total planted area area - 27ym2
all new work is below the current building parapet - refer elevation net reduction in planting area is 26m2 - 8.5%
reduction to landscape areas hard and soft - Nil
0 2000mm 5000mm 10000mm
ROOF NEW
FLEXURE Pty Ltd CLIENT USE FIGURED DIMENSIONS. ISSUE AMMENDMENT Title
THE BODY CORPORATE OF NOOSA CENTRAL DO NOT SCALE FROM THE date details
DRAWINGS. CONFIRM ALL Date 16 June 2025
GRANT CALDER ARCHITECTURE AND URBAN DESIGN DIMENSIONS ON SITE PRIOR
TO CONSTRUCTION OR
FABRICATION. IT REMAINS Scale
PROJECT NOOSA CENTRAL STAGE 2, 6 Bottlebrush Avenue Noosa Junction - THE CONTRACTORS
RESPONSIBILITY TO ENSURE Drawn Grant Calder
21 Bursaria Street Peregian Beach
ph: 0488 084 184 NOOSA COUNCIL ALTERATIONS AND IMPROVEMENTS - TENDER SET COMPLIANCE WITH ALL
RELEVANT CODES AND
email - [email protected] REGULATIONS IS Checked Grant Calder
Registered Architect- BOAQ 3112
APPROVED PLAN MAINTAINED AT ALL TIMES.
51901.25.01 15 JULY 2025 Drawing No GC 138 TD 07 Issue - 0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.