Original source · versioned page text
Noosa Council Planning Report - 26 Sallwood Ct, Pinbarren. (3)
Attached to the e-mail 26 Sallwood Ct - OPW21/0332 - response to Information Request.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
26 SALLWOOD COURT, PINBARREN 4568 ECOLOGICAL REHABILITATION MANAGEMENT PLAN MONITORING The property owner is responsible to provide monitoring and reporting sufficient to conform compliance with the Key Performance Indicators outlined in Table 1. PLANTING The Reconstruction Zone will be monitored based on the Key Performance Indica- Planting should match the Key performance Indicators in Table 1 (1 tree species every tors. 10m2 & 1 shrub species every 5m2 ). If not supplementary planting is required and is to consist of planting flora drawn from Table 3. Reporting will include: Plant installation methods shall include: - Project Snapshot; - Report on maintenance activities; · Plants are to be vigorous, well established, hardened off, consistent with species or variety. - Outcomes since last report; · Excavate planting medium to a depth suitable for the installation of tube stock speci- - Monitoring on Revegetation heights, density, and diversity; mens. In areas where planting substrate is deemed to be very poor (compacted, nutrient - Outcomes against Key Performance Indicators; deficient, hydrophobic, etc.) topsoil may be used. - Photos; · Pre-water plant hole, if soil is dry, to decrease root stress upon planting and assess the - Weed management actions taken; infiltration of water through the soil. - Non-conformances; and · Incorporate into the planting substrate the appropriate quantity of prepared water crystals or other suitable hydrating product such as Hortex 'Rainsaver' or 'Moisturaid'. - Actions to be undertaken in the next annual period. · Place plant into hole and backfill ensuring that the plant is upright and the stem is not covered in any less than 10mm or any more than 20mm of planting medium. · Plants are to be watered thoroughly immediately after planting (ensure deep irrigation) and creation of a concave hollow around the base of each plant will aid water infiltration to the plant roots. · A complete, slow release fertiliser is recommended, and is to be administered appropri- ately during planting. · To ensure successful establishment, all planting surfaces must be covered in 100mm layer of high quality weed-free mulch (site mulch) - Note: to avoid possible stem rot in some 'drier' species ensure mulch is 'dished' and not covering plant stem by more than 20mm. · A minimum 90% survival rate should be achieved. CLIENT Author: Luke Hamilton B.Env.Sc PROJECT TITLE DRAWING TITLE Revegetation Plan Ecological Rehabilitation Property Owner - Notes (3) Management Plan 6 Sallwood Court 19 Central Park Drive, Yandina 4561 Lot 3 SP170008 Drawing No. Pinbarren 4568 www.aussieenvironmental.com.au ERMP04
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.