Original source · versioned page text
Noosa Council Planning Report - 26 Sallwood Ct, Pinbarren. (3)
Attached to the e-mail 26 Sallwood Ct - OPW21/0332 - response to Information Request.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
the months of December through to March to ‘Moderate or Low’ for the rest of the year. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec H H H M M M L VL M M M H Table 1: Erosion risk ratings based on monthly rainfall erosivity. Risk for erosive rainfall and subsequent sediment loss are higher during the months of December to March. The clearing and drainage works occurred outside the high risk months which was a key project objective. 2.2 Water Drainage runs through the property and the whole property is within its catchment. Department of Natural Resources Mines and Energy (DNRME) Watercourse Identification Map within Queensland Globe Inland Waters (accessed on 20 March 2022) indicates that the drainage line is not a determined drainage feature until it reaches Pinbarren Creek (approximately 0.5km downstream) that is regulated under the Water Act 2000. Department of Environment and Science Environmental Report (Refer Attachment A) recognises the drainage line on the property as a waterway with potential values for aquatic habitat and connectivity. Aerial photos show that much of the upper catchment from the property has low naturalness and the drainage line has been re- aligned and rip rap & vegetation protected. There was a risk during clearing and earthworks that sediment would be released to downstream environments. Appropriate measures appeared to be in place (i.e. mulch bunds and the existing dam used as a sediment trap). Permanent drainage/channel protection matched existing rip rap protection which would have been hydraulically sized to the upstream catchment, slope and expected flows (i.e. D50=400mm). Inspections have identified a stable non-eroding environment with natural recruitment of native sedges and grass becoming established. All works completed have experienced a beyond average wet season with several large rain events (>300mm in 24hrs). It is therefore anticipated and evident that this change in landscape has improved the overall environmental values of the property including improvements to; drainage protection and capacity, erosion protection, overall water quality to the catchment. 2.3 Soil / Land Management Soil Types Soil mapping and site evaluation identifies most of the property has medium clays overlying clayey subsoils (texture contrast soils) with low organic matter. The Mary River Catchment Coordination Committee’s report “Grazing land types of the Gympie district” (Department of Employment, Economic, Development and Innovation, Feb 2017) provides the following soil characteristics; high moisture holding capacity; moderate to high soil fertility; erosion risk as susceptible to scouring and slumping during high rainfall events. Council overlay mapping indicates a medium risk Landslide Hazard within part of the property mainly due to the topography of the land. Existing topography features show no steep sections on the property. Soils results indicate that although the topsoils are non-dispersive and the existing landscape has moderate erosion risk, once soils are exposed the risks of erosion is high. Therefore, the management of exposure to soil is a major construction element to manage and did govern the Ecological Assessment Report 26 Sallwood Court, Pinbarren Page 6 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.