Change to Jetty OPW18-0150 - Planning Report
Attached to the e-mail Change Operational Works Application - OPW18/0150.01 - 21 Wesley Court Noosa Heads.
1.2m if fitted with one handrail and
900mm if fitted with a handrail on
each side;
iii. the primary walkway to multiple
berth pontoons has a maximum width
of 1.5m; and
iv. The maximum width of the
gangway is 1.5m;
AND
S9.7 In Noosa Sound, where quay lines Complies
are set, a jetty or pontoon does not The proposed
extend into the watercourses beyond modification includes
the quay line; attaching two floating
OR fenders to the existing
S9.8 Where no quay lines are set, the approved jetty. The width
maximum distance a jetty or pontoon of both fenders are
extends into the watercourse is 10m, 650mm and represent a
unless it can be demonstrated that a minor addition to the
distance in excess of 10m is essential fixed jetty.
to safely access the jetty;
AND
S9.9 All attachments to jetties, Complies
including but not limited to boat lifts, The proposed fenders,
jet ski dradles, floating berths and dry storage pontoon and
floating pontoons must be located steps are attached to the
within the quay line; AND existing approved jetty.
S9.10 Pontoons must be structurally Complies
capable of sitting on the sand bed. The pontoon has been
Rollers and bracing must account for suitably designed.
this situation; AND
S9.11 Jetties and pontoons must be Not applicable
free standing and not rely on The proposal does not
connecting to any Council revetment change the structure of
wall or other structure. the approved jetty.
14.166 Design, Construction and Safety – Boat Ramps
S10.1 Where there is an existing Not applicable
O10 Boat ramps are designed
revetment wall— A boat ramp is not
and constructed to—
a) the levels of a boat ramp surface proposed.
a) allow access by a wheeled
at the revetment wall is no more than
boat trailer;
150mm above the top of the wall, not
b) ensure that unacceptable
more than 500mm below the top of
risks to personal and public
the wall and not more than 200mm
safety are unlikely to be caused;
above the existing beach; and
c) avoid cluttering of the
b) The ramp extends into the
watercourse;
watercourse no more than 9m from a
d) avoid excessive traffic
revetment wall; AND
volumes within foreshore areas
S10.2 The ramp is constructed at a
and adjoining lands; and
uniform grade and no steeper than 1
e) ensure that visual amenity of
in 5 (20%);
the foreshore is maintained.
AND
RG Strategic Town Planning Report – Other Change Application 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.