Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Attachment 3 -C_ Planning Scheme Assessment

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Appendix C
Assessment Against the Planning Scheme – Existing Services Code

  Performance Outcomes                          Acceptable Outcomes                                       Compliance
Assessable development
PO1
Development near a stormwater        No acceptable outcome provided                       Can comply – engineering plans have been
drain, overland flow path or                                                              prepared by Arcos to demonstrate the ability to
associated structure does not—                                                            comply and are included in Appendix B.      The
(a) adversely affect the function                                                         development approval for this development
    of the service;                                                                       application can be conditioned accordingly if
(b) place an additional load on                                                           considered necessary by Council.
    the service; and
(c) unduly increase future
    maintenance costs.

PO2
Maintenance access is provided       AO2.1                                                Can comply – engineering plans have been
to all stormwater drains, overland   For trunk infrastructure, a registered easement in   prepared by Arcos to demonstrate the ability to
flow paths and associated            favour of Council is created over all underground    comply and are included in Appendix B.      The
structures.                          infrastructure located in private property.          development approval for this development
                                                                                          application can be conditioned accordingly if
                                                                                          considered necessary by Council.

                                     AO2.2
                                     The width of the easement required is in
                                     accordance with Council’s Planning Scheme
                                     Policy PSP6 Engineering Design Standards –
                                     Roads, drainage and earthworks.

                                     AO2.3
                                     The easement is centred over the centreline of
                                     the infrastructure.
Log in to download the original file

Attachment 3 -C_ Planning Scheme Assessment.pdf · 5.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.