Attachment 3 -C_ Planning Scheme Assessment
Appendix C
Assessment Against the Planning Scheme – Waste Management Code
PO4 AO4.1
Waste storage areas are Waste storage areas are constructed of Can comply – The development approval for this
designed for ease of maintenance impermeable and durable surfaces that are development application can be conditioned
and ease of access for cleaning. easily cleaned. accordingly if considered necessary by Council.
AO4.2
Sufficient space is provided between and around Can comply – The development approval for this
waste storage bins to allow for manoeuvring and development application can be conditioned
washing of bins. accordingly if considered necessary by Council.
PO5
Waste storage areas provide a No acceptable outcome provided Can comply – The development approval for this
safe and secure environment for development application can be conditioned
users through: accordingly if considered necessary by Council.
(a) appropriate siting and
access;
(b) the provision of lighting; and
(c) restricting access to the
general public by making the
area clearly identifiable as
private space.
Editor’s note— The use of
landscaping, a change of paving
material or fencing are examples
of delineating a waste storage
area. The locking of the area is
not preferred and should be
avoided.
Water management Table 9.4.10.3 - Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes Compliance
Waste management
PO6 AO6
Waste storage areas are The waste storage area is constructed of Can comply – The development approval for this
designed to contain and impermeable and durable surfaces and: development application can be conditioned
appropriately dispose of leakage a) is bunded and graded so that washwater accordingly if considered necessary by Council.
from bins and wastewater from and bin leakage are drained to the sewer or
bin washing. an on-site effluent disposal system via a
gully within the storage area;
b) has a bund wall with a maximum height of
100 millimetres;
c) is serviced by a conveniently located
hosecock and backflow prevention device,
and connected to a water supply; and
d) is roofed or otherwise covered if the storage
area is -
(i) more than 1m²; or
(ii) storing wet waste; or
(iii) storing other waste with a high
potential to cause pollution if washed
or leaked from the bins, including
waste oil or putrescibles.
Safety and protection of infrastructure when demolishing or removing buildings
Table 9.4.10.3 - Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes Compliance
Safety and protection of infrastructure when demolishing or removing buildings
PO7 AO7.1
Demolition, removal, relocation or Infrastructure including reticulated water, Can comply – The development approval for this
associated works do not result in: sewerage, stormwater, and electricity are development application can be conditioned
(a) 'live' or 'active' infrastructure protected from damage and made safe to the accordingly if considered necessary by Council.
that may present risk to standard required by the regulatory authority.
people using the site or
surrounding areas; or AO7.2
(b) damage to infrastructure or Infrastructure is disconnected, capped or sealed Can comply – The development approval for this
other works. including: development application can be conditioned
a) electricity meters are removed and electrical accordingly if considered necessary by Council.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.