Skip to the record
Accept no imitations.

Original source · versioned page text

Attachment 3 -C_ Planning Scheme Assessment

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Appendix C
Assessment Against the Planning Scheme – Waste Management Code

  Performance Outcomes                        Acceptable Outcomes                                        Compliance
Waste separation
PO1                                AO1.1
Development that generates         Construction, operational and demolition works       Can comply – The development approval for this
several classes of waste is        are planned and managed in accordance with           development application can be conditioned
designed so waste is collected,    Planning Scheme Policy PSP9 Waste                    accordingly if considered necessary by Council.
stored and disposed of in a safe   management.
and ecologically sustainable
manner.                            Editor’s Note— PSP9 Waste Management
                                   requires Waste Management Plans to be
                                   prepared as part of certain types of development
                                   applications to ensure proper consideration is
                                   given to waste minimisation, segregation and
                                   reuse.

                                   AO1.2
                                   Adequate area is provided on-site for the            Can comply – The development approval for this
                                   collection and separate storage of recyclable,       development application can be conditioned
                                   non-recyclable, vegetative and hazardous             accordingly if considered necessary by Council.
                                   materials in their specific waste streams during
                                   construction or demolition works and the
                                   operational phase of development.

PO2                                AO2
Waste storage areas provide for    Waste storage areas allow for the separate           Can comply – The development approval for this
adequate separation of all         storage of different waste materials for reuse or    development application can be conditioned
recyclable and non-recyclable      recycling by:                                        accordingly if considered necessary by Council.
materials.                          a) providing sufficient area to store all
                                        recyclable material and recycling containers;
                                        and
                                    b) sign posting the types of waste stored.

Design and location        Table 9.4.10.3 - Criteria for assessable development (part)
  Performance Outcomes                        Acceptable Outcomes                                        Compliance
Design and location
PO3                                AO3.1
Waste storage areas are located    Waste storage areas are designed and                 Complies – screened bin enclosures are provided
so that they are convenient and    maintained in accordance with Planning Scheme        for each proposed dwelling
safe to use and to collect from.   Policy PSP9 Waste management.

                                   AO3.2
                                   Waste storage areas are designed and located         Complies – screened bin enclosures are provided
                                   so they:                                             for each proposed dwelling
                                   a) are easily accessed and convenient to use;
                                   b) have unobstructed access for the collection
                                        of the waste by service vehicles;
                                   c) without the need for manual handling;
                                   d) are clear of carparking bays, loading bays
                                        and similar areas;
                                   e) are clear of footpaths and pedestrian
                                        access;
                                   f) are capable of being serviced by the
                                        collection vehicle without impeding traffic
                                        flow; and
                                   g) have a level area provided for the storage of
                                        waste, recyclable materials and green waste
                                        in standard bins.

                                   AO3.3
                                   For uses that do not employ a caretaker or           Complies – proposed location of bin enclosures
                                   central management, the maximum distance             comply
                                   between waste storage areas and the kerbside
                                   is 60 metres.

                                   AO3.4
                                   Pathways used to transport bins:                     Complies – proposed pathway to bin enclosures re
                                   a) have a maximum grade of 1:15; and                 comply
                                   b) are free of steps, stairs or other
                                     impediments.
Log in to download the original file

Attachment 3 -C_ Planning Scheme Assessment.pdf · 5.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.