ORDINARY MEETING AGENDA 21 SEPTEMBER 2017
3 OPW16/0016 – PLANNING &
ENVIRONMENT COURT APPEAL 281/2017 REFUSAL OF DEVELOPMENT PERMIT FOR
OPERATIONAL WORKS – PRESCRIBED TIDAL WORKS SITUATED AT 2 PARKYN
COURT, TEWANTIN
That Council note the report by the Manager, Development Assessment to the Planning &
Environment Committee Meeting dated 12 September 2017 regarding Planning &
Environment Court Appeal 281/2017 and agree to settle the appeal generally in accordance
with the following conditions:
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
4901-SK3 E Indicative New Deck Layout prepared by International 14 July 2017
Marina Consultants
4901-301 A General Arrangement and Elevation 5m Option 4 August 2017
4901-302 Elevation and Sections 5m Option 4 August 2017
3D View 1 Proposed New Northern Deck Extension at Noosa 14 August 2017
Marina, Tewantin. Qld. - Artist Impression
3D View 2 Proposed New Northern Deck Extension at Noosa 14 August 2017
Marina, Tewantin. Qld. - Artist Impression
Deck Extension Design
2. The deck extension must be constructed of materials as depicted on the 3D View 1
and 2 prepared by Peter Morrison and dated 14 August 2017 including open and
transparent balustrades with timber post uprights,; and timber decking; and timber
ramps and approaches.
Prior to Commencement of Works
3. All necessary State government approvals relating to this development must be
obtained prior to any works commencing on the site.
4. A complete set of amended structural design plans, duly signed by the consultant
Registered Professional Engineer of Queensland (RPEQ) must be provided to
Council’s Engineering Officer Construction at the “pre start” meeting
5. A site control and/or compliance bond of $5,000 is to be submitted to Council prior to
the pre-start meeting. The pre-start meeting will only be held once Council's
Construction Engineering Officer has confirmation that the bond monies have been
received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance
with these conditions or any additional inspections incurred for substandard work or
work undertaken not in accordance with this permit.
6. All necessary approvals from external service providers (eg Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
Page 18 of 22