Original source · versioned page text
Planning Report
103 Wrigley St (Cnr Sugar Road)
P O Box 5774
Maroochydore BC Q 4558
Phone: 617 5479 5311
Fax: 617 5479 1289
Email: [email protected]
Part of CadCon International Pty Ltd
ACN 098 201 828
4 PROPOSAL
The application seeks approval for a code assessable development permit for a Reconfiguration of a
Lot (1 into 2 Lots) at 96 Black Mountain Range Road, Black Mountain in accordance with the submitted
proposal plans and engineering plans (refer to Appendices C and E).
The proposal involves subdividing the existing lot to create a total of 2 standard format lots with an
existing house to be retained on Lot 1. Lot 1 will have an area of 1.882ha and Lot 2 will have an area
of 4.754ha. Lot 1 will provide two separate building envelopes with areas of 3574m2 and 2117m2 (total
building envelope area of 5691m2) with the existing dwelling house being retained in one of the building
envelope areas and Lot 2 will provide a singular building envelope with an area of 862m 2 to
accommodate a future dwelling house.
The proposed subdivision layout results in irregular shaped lots due to lot boundaries being aligned to
avoid traversing ecologically important areas. Despite the lots being irregular in shape, the layout is
considered to be appropriate as they meet the prescribed 1.5ha minimum lot size, are of a consistent
size and character of surrounding lots, still enable activities consistent with the purpose and overall
outcomes sought for the rural residential zone, and both lots are capable of accommodating dwelling
houses (noting that Lot 1 contains an existing dwelling house and Lot 2 has an 862m2 building
envelope).
4.1 Access
The lots will be accessed via new separate concrete driveways from Black Mountain Range Road
located generally in accordance with the existing driveway location.
4.2 Services
The development site will be connected to telecommunications and electricity services. The site is
located in an area that is not serviced by water and sewer trunk infrastructure. Each lot will be
appropriately self-supported with tanks for domestic water supply and fire-fighting purposes and on-site
effluent disposal for wastewater treatment.
Waste management will be via kerbside collection from Black Mountain Road.
4.3 Earthworks
The development will require minor earthworks to facilitate construction of the driveway crossovers only.
CadCon provides boundary, contour & detail and construction surveys, town planning applications, liaison & negotiation with Councils & Government,
coordination and liaison with architects, engineers etc, coordination and management of development projects from start to finish.
Ref 218806 – Brett Hage Page 7 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.