ORDINARY MEETING AGENDA 15 OCTOBER 2020
Car Parking
22. A minimum of 44 car parking and 8 motorcycle spaces must be provided and marked on the
site, and made available and accessible at all times while the use is open for business. The
works must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. A maximum of 6 tandem staff parking spaces within the total, which are clearly marked
for that purpose
b. 1 disabled parking space/s within the total
c. 11 bicycles parking spaces.
d. provision of vandal resistant public lighting with intensities to satisfy the requirements
of Australian Standard AS1158: Public Lighting Code
e. crossfalls and gradients in accordance with Australian Standard AS2890: Parking
Facilities
23. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
24. Directional signage must be provided to direct visitors and customers to the car parking
spaces provided on site.
Service Vehicle
25. Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
The works must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. 1 van service space
Ambulance Bay
26. An ambulance bay must be provided on site generally in accordance with approved plans to
accommodate an urban ambulance vehicle (eg Mercedes Benz Sprinter 519 Bariantric-
Specialist).
Stormwater Drainage
27. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval and in compliance with relevant requirements of the Queensland Urban Drainage
Manual, and must include in particular:
a. The works shown on the Concept Stormwater Management Plan, Job ref No: SC-8407,
Dwg No C001 Rev C, prepared by Empire Engineering and dated 19/03/2020.
b. Extension of the site stormwater system to accommodate stormwater from external
site, including registration of all required drainage easements.
c. Stormwater drainage works within Myall Street generally as shown on Concept
Stormwater Management Plan by Empire Engineering.
d. Interallotment easement over proposed Lot 6 (9 Myall Street) should be dedicated for
piped and overland drainage flows.
e. The use of gravity stormwater drainage and not surcharge pits.
28. Easements for drainage purposes must be registered against the burden properties generally
in accordance with the Concept Stormwater Management Plan, Job ref No: SC-8407, Dwg
No C001 Rev C, prepared by Empire Engineering.
29. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Page 23 of 27