30. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
walls that are publicly accessible and exceed 1.0m in height must be fitted with a
commercial grade safety fence.
Damage to Services and Assets
31. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
31.1 where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
31.2 where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
RECONFIGURING A LOT CONDITIONS (REC15/0024)
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
- B Proposed Reconfiguration 33 & 35 Grant Street, -
Noosa Heads
2. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
Water & Sewer Connections
3. An underground connection to reticulated water and sewerage must be provided to each lot
in accordance with the standards and requirements of Northern SEQ Distributor–Retailer
Authority (Unitywater).
4. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to each lot.
Community Management Statement
5. Any proposed Community Management Statement required for the development pursuant
to the Body Corporate and Community Management Act 1997 must be submitted to
Council for endorsement at the same time as submission of the subdivision plan to Council
for compliance assessment.
Electricity and Telecommunication Services
6. Certification must be submitted to Council from all relevant service providers which certifies
that the development has met the requirements of this Decision Notice and all applicable
legislation at the time of construction.
Easements
7. Reciprocal easements for access must be created with the lots. The easements must be of
sufficient dimensions to encompass the paths of vehicles accessing the spaces,
manoeuvring on site and exiting the site in a forward gear in a total of 3 movements.
8. Reciprocal easements for support (or similar) must be created with the lots. The easements
must be of sufficient dimensions to encompass the whole of the common dividing wall
together with any necessary foundations.
Page 34 of 96
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.