PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 MAY 2016
21.2. removal of any existing redundant property access and reinstatement of the kerb,
footpath and verge area to match the balance of the site frontage, including the
provision of topsoil and turf where the existing verge is grassed.
Site Access and Driveways
22. A sealed access driveway must be provided extending from the existing concrete driveway
within the easement at the rear of the site to all parking and manoeuvring areas of the
development. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
22.1. a driveway width of 5 metres maximum;
22.2. suitable safety measures, including warning signage, to improve driver awareness of
other vehicles on the existing easement;
22.3. sufficient area for vehicles to access the spaces, manoeuvre on site and exit the site
in a forward gear in a total of 3 movements.
Car Parking
23. A minimum of 6 car parking spaces must be provided and marked on the site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
23.1. A minimum of 2 visitor parking spaces within the total, which are clearly marked for
that purpose and accessible at all times for visitor use;
23.2. crossfalls and gradients in accordance with Australian Standard AS2890: Parking
Facilities.
24. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
25. Directional signage must be provided to direct visitors to the car parking spaces provided
on site.
Pedestrian Facilities
26. Pedestrian facilities must be provided for the development. The works must be undertaken
in accordance with an Operational Works approval and must include in particular:
26.1 a 1.5 metre wide footpath within the road verge for the entire length of the site’s
frontage to Grant Street.
Stormwater Drainage
27. The site must be provided with a stormwater drainage system connecting to a lawful point
of discharge. All stormwater drainage must be collected and discharged so there is no net
increase in stormwater runoff from the site. The works must be generally in accordance
with drawing number 26041-SW1 prepared by SCG Consulting and be undertaken in
accordance with an Operational Works approval.
Electricity and Telecommunication Services
28. Unless otherwise stipulated by telecommunications legislation at the time of construction,
the development must be provided with all necessary conduits, pits and pipes to
accommodate the future connection of optic fibre technology telecommunications.
Earthworks and Retaining Walls
29. All fill and associated batters must be undertaken in accordance with an Operational Works
approval, and contained entirely within the subject site unless written permission from the
respective landowner(s) is provided to Council.
Page 33 of 96
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.