Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2016-05-10 Planning & Environment Committee Agenda

of 96

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     10 MAY 2016


      21.2. removal of any existing redundant property access and reinstatement of the kerb,
            footpath and verge area to match the balance of the site frontage, including the
            provision of topsoil and turf where the existing verge is grassed.
      Site Access and Driveways
22.   A sealed access driveway must be provided extending from the existing concrete driveway
      within the easement at the rear of the site to all parking and manoeuvring areas of the
      development. The works must be undertaken in accordance with an Operational Works
      approval and must include in particular:
      22.1. a driveway width of 5 metres maximum;
      22.2. suitable safety measures, including warning signage, to improve driver awareness of
            other vehicles on the existing easement;
      22.3. sufficient area for vehicles to access the spaces, manoeuvre on site and exit the site
            in a forward gear in a total of 3 movements.
      Car Parking
23.   A minimum of 6 car parking spaces must be provided and marked on the site. The works
      must be undertaken in accordance with an Operational Works approval and must include in
      particular:
      23.1. A minimum of 2 visitor parking spaces within the total, which are clearly marked for
            that purpose and accessible at all times for visitor use;
      23.2. crossfalls and gradients in accordance with Australian Standard AS2890: Parking
            Facilities.
24.   All car parking areas and access driveways must be maintained exclusively for vehicle
      parking and manoeuvring and kept in a tidy and safe condition at all times.
25.   Directional signage must be provided to direct visitors to the car parking spaces provided
      on site.
      Pedestrian Facilities
26.   Pedestrian facilities must be provided for the development. The works must be undertaken
      in accordance with an Operational Works approval and must include in particular:
      26.1 a 1.5 metre wide footpath within the road verge for the entire length of the site’s
           frontage to Grant Street.
      Stormwater Drainage
27.   The site must be provided with a stormwater drainage system connecting to a lawful point
      of discharge. All stormwater drainage must be collected and discharged so there is no net
      increase in stormwater runoff from the site. The works must be generally in accordance
      with drawing number 26041-SW1 prepared by SCG Consulting and be undertaken in
      accordance with an Operational Works approval.
      Electricity and Telecommunication Services
28.   Unless otherwise stipulated by telecommunications legislation at the time of construction,
      the development must be provided with all necessary conduits, pits and pipes to
      accommodate the future connection of optic fibre technology telecommunications.
      Earthworks and Retaining Walls
29.   All fill and associated batters must be undertaken in accordance with an Operational Works
      approval, and contained entirely within the subject site unless written permission from the
      respective landowner(s) is provided to Council.



                                                                                   Page 33 of 96
Log in to download the original file

2016-05-10 Planning & Environment Committee Agenda(PDF, 11MB).pdf · 11.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.