PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 NOVEMBER 2018
For the purpose of certifying outdoor lighting devices for the development, a qualified
person is:
a. Registered Professional Engineer of Queensland;
b. an environmental or electrical design consultant with a minimum of 3 years
current experience in the field of outdoor lighting.
Building Demolition/Removal/Relocation
38. Where the development involves the removal, relocation or demolition of a building, a
Waste Management Plan (construction and demolition) in accordance with Planning
Scheme Policy 11, Waste Management Plans must be submitted and approved by
Council’s Environmental Health Officer prior to issue of a development permit for
operational works for demolition, removal or relocation of any building other than a
shed.
The purpose of the Waste Management Plan is to facilitate the segregation of waste
for the effective reuse and recycling of such materials. Segregated wastes attract
significantly reduced disposal fees at the landfill with some items free. Higher gate
fees are charged for mixed waste.
Waste storage areas must provide adequate separation of all reusable, recyclable
and waste materials. These must be located so that they are convenient and safe to
use.
The Plan must contain the following information:
a. The site area for the storage and separation of waste is to be shown on the
plan drawings accompanying the application.
b. A waste management table as indicated below is to be completed showing how
waste material is to be segregated - recycled – reused or disposed.
c. Table – Waste Management Table
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume(m³) *specify proposed *specify contractor and
re-use or on-site contractor and landfill site or
recycling methods recycling outlet other disposal
site
Excavation material
Green waste
Bricks
Concrete
Timber-please specify
Plasterboard
Metals - please specify
Asbestos
Other - please specify
Note * If a demolition contractor is undertaking works, then the Waste Management table is
to be completed by the demolition contractor.
WASTE
39. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 "Waste Management Multi-Dwellings and Commercial
and Industrial Premises". The facilities must include an external impervious area
correctly sized for all refuse and recycling containers and suitably screened from
public places and neighbouring properties. A bin wash area is required with a cold-
water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain
Page 45 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.