PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 NOVEMBER 2018
outlet must be designed to prevent storm water entry to the sewerage system. This
can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max
0.5m2) , or alternatively the waste area can be roofed, or any other design approved
by Council.
40. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
41. Bins must be provided throughout the site to reduce littering. All bins provided must
be for refuse and recycling and be decanted into the bulk bins by the site operators.
ENGINEERING
Site Specific Conditions
42. The proposed flood barrier must be of a design that is activated by the rising flood
levels and the associated hydraulic differential to raise and lower the barrier. The
barrier must not require a power supply or human intervention. The barrier must be
maintained by the property owner in accordance with the manufacturer’s
specifications. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
a. Certification from a Registered Professional Engineer of Queensland (RPEQ)
that states that the design of the barrier is suitable for its intended use.
43. The development must include an internal stairwell connecting the basement level to
the upper floor. The stairwell must be located and constructed to provide an escape
route for people to evacuate the basement in the event the barrier and/or pump
system fails. Plans submitted as part of any subsequent operational works and
building permit must clearly indicate the stairwell.
External Works
44. Mary Street must be upgraded for the length of its frontage to the subject site. The
works must be generally in accordance with drawing number 17699-SK100 Revision
A prepared by TOD Engineers and Project Managers dated 17 August 2018. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. construction of new kerb and channelling offset 7.5m (3.5m lane and 4m of
cycle lane/parallel parking) from the northern side of the existing landscaped
median;
b. suitable transitions from the new kerb line to join with the existing kerb at the
western and eastern end;
c. landscaping of the verge area;
d. construction of a pedestrian footpath in accordance with the conditions of this
Decision Notice;
e. removal of the existing property accesses and reinstatement of the kerb,
footpath and verge area to match the balance of the site frontage, including the
provision of topsoil and turf where the existing verge is grassed.
Condition 44 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Site Access and Driveways
45. A sealed access driveway must be provided from Mary Street to all parking and
manoeuvring areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
Page 46 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.