Original source · versioned page text
Rfi - PG-2096, 2022-11-03, Gr Ver 3
Project No. PG-2096 Page | 2 March 2023 Ref: PG-2096, 2022-11-03, GR VER 3 Keith & Jeannette Ince – Geotechnical Stability Assessment - Proposed Residence, 22 Arakoon Crescent, Sunshine Beach As part of the development, an onsite efficient disposal infiltration system is proposed as indicated in Figure 1. FIGURE 1 2.0 METHODOLOGY The geotechnical investigation comprised the drilling and sampling of 3 boreholes to depths of between 1.0m and 1.5m (drilling refusal), using hand-held auger equipment, and drilling and sampling 1 borehole to a depth of 6.0m using a 4WD mounted Compac 018 drilling rig. Dynamic Cone Penetrometer (DCP) testing was conducted adjacent to the boreholes and at two additional locations. The soil classification descriptions and field tests were carried out in general accordance with Australian Standards. AS 1726 Geotechnical Site Investigations AS 1289 Methods of Testing Soils for Engineering Purposes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.