No. Conditions Condition timing
Operational Works – Prescribed Tidal Works (pontoon and gangway)
10.17.3.1.1 – Operational work that is tidal works or work in a coastal management district— The chief
executive administering the Planning Act 2016 nominates the Director-General of the Department of
Environment, Science and Innovation to be the enforcement authority for the development to which this
development approval relates for the administration and enforcement of any matter relating to the
following conditions:
1. The pontoon must be carried out generally in accordance with the For the duration of
following plans: works and to be
(a) Layout Plan, date 28/06/2023, Drawing number TJS-04808-02, maintained
Revision A
(b) Elevation, date 28/06/2023, Drawing number TJS-04808-03,
Revision A
2. The works to which this approval relates are to be for a private purpose At all times
only.
3. Any operator and contractor involved in the works to which this During construction
approval relates must:
(a) be provided a copy of these referral agency conditions
(b) install all measures, plant and equipment necessary to ensure
compliance with the conditions of this approval
(c) maintain such measures, plant and equipment in a proper and
efficient condition
(d) operate such measures, plant and equipment in a proper and
efficient manner.
4. For the pontoon works only use materials which are free from During construction
contaminants as defined under section 11 of the Environmental
Protection Act 1994.
5. Should the works become damaged as a result of erosion, flooding or At all times
storm tide inundation, the registered landowner(s) of the subject land
shall be responsible for the removal of all debris at their own expense.
Operational Works – Prescribed Tidal Works (pontoon and gangway)
10.17.3.2.1 – Operational work that is tidal works or work in a coastal management district in tidal waters
(maritime safety) — The chief executive administering the Planning Act 2016 nominates the Director-
General of the Department of Transport and Main Roads to be the enforcement authority for the
development to which this development approval relates for the administration and enforcement of any
matter relating to the following conditions:
6. The development must be carried out generally in accordance with the At all times
following plans:
(a) Layout Plan, date 28/06/2023, Drawing number TJS-04808-02,
Revision A
(b) Elevation, date 28/06/2023, Drawing number TJS-04808-03,
Revision A
State Assessment and Referral Agency Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2405-40643 SRA - Response with conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 261 KB (small file)
- File type
No other editions are linked here.