2405-40643 SRA - Response with conditions · MCU24/0069
2405-40643 SRA
7. (a) Light/mark all vessels, structures, plant and equipment For the duration of
associated with: works and for operation
i. the works, in accordance with the following specifications: to be maintained at all
A. any anchors deployed must be marked with times
yellow buoys and fitted with FL yellow lights
ii. operations, in accordance with the following specifications:
A. any anchors deployed must be marked with
yellow buoys and fitted with FL yellow lights.
(b) Lighting provided must not obscure, disguise or otherwise interfere
with the safe navigation of other vessels, including the
effectiveness of navigational lighting.
8. The construction, operation and maintenance of pontoon and any For the duration of
ship berthed, moored or attached to the structure, must not: works, and at all times
(a) encroach into, pass over or under a navigation corridor or
(b) be located in a high risk maritime zone or
(c) impede the safe navigation of other ships or boats or
(d) restrict safe access to or from neighbouring structures.
9. Remove and dispose of any debris or similar obstruction encountered For the duration of
whilst undertaking the work at an appropriately licensed facility. works
10. All piles and/or structures to be demolished, both above and below the Prior to the completion
waterline must be completely extracted/removed. of the works
State Assessment and Referral Agency Page 4 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2405-40643 SRA - Response with conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 261 KB (small file)
- File type
No other editions are linked here.