LATE RFI - Response Letter from Recor

of 4

Page text shows just the words. Original shows the document exactly as it was published.

                4. Include the requirements of the Sustainable Building Code (water tanks) within
                   the SMP
            Please refer to the update Stormwater Management Plan. The requirements of the
            Sustainable Building Code have now been incorporated through the requirement that
            future dwellings upon the proposed lot will require a minimum 3,000L rainwater reuse
            tank, which has also been reflected in the updated drawings.



                    5. Provide additional comment on the impacts on the downstream property
                       of the concentrated discharge and the impacts on the future development
                       potential of the adjoining land

            The flow from the upstream properties which is diverted around the site will now be
            dispersed through a level spreader device of nominally 4m to ensure that the flows
            are discharged as sheet flows towards the downstream property. This will ensure
            minimal impacts the downstream property and future development thereupon. As the
            change in peak run-off from the development is negligible, the proposed
            development will remain consistent with the existing peak flows therefore no
            worsening of conditions to the downstream properties will arise. Refer to updated
            stormwater management plan for details and drawings 010 and 040 respectively that
            reflect the changes.

                    6. Indicate on the plans any necessary easements required to convey runoff from
                       external to the site and within the proposed new lots.

            A dedicated drainage easement extending from shared access and services easement
            has been provided to convey runoff from upstream or external sources to the
            proposed development site. Proposed Lot Configuration plan 010 has been updated
            to reflect this.

            Existing Access

                    7. Provide additional comment from the engineer in regard to the condition of the
                       existing driveway and its ability to cater for the additional traffic movements

            The existing driveway is a concrete domestic residential driveway of approximately
            3m. A site visit was undertaken in September 2022 which found that there were no
            significant issues nor presence of extensive cracking beyond typical ageing that would
            impact upon the service life of the driveway were present as shown below.




P +61 7 5211 1003           A 75 Noosa Dr, Noosa Heads Qld 4567   E [email protected]   recorconsulting.com
Log in to download the original file

LATE RFI - Response Letter from Recor.pdf · 387 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.