Decision Notice - OPW24 0025 · OPW24/0025

of 13

Text shows just the words. Original shows the document exactly as it was published.

                                                                             Officer:            Daniel Epps
                                                                             Direct Telephone:   07 53296223
                                                                             Our Reference:      OPW24/0025
                                                                             Your Reference:     BA220095

               9 May 2024


               QRE Construction
               C/- JDBA Certifiers
               1/13 Norval Ct
               MAROOCHYDORE QLD 4558

               [email protected]



               Dear Sir/Madam,
                                                         Decision Notice
                                                         Planning Act 2016

               I refer to your application and advise that on 7 May 2024, Council decided to approve the
               application subject to conditions.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              OPW24/0025

                   Street address:              332 Eastern Branch Rd Kin Kin Qld 4571

                   Real property description:   Lot 218 MCH 186

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Approval for Operational Works - Drainage Works, Earthworks,
                       Landscaping, Clearing Vegetation under planning scheme, Vehicle Crossover
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.      Development undertaken in accordance with this approval must generally comply with the
                       approved plans of development. The approved plans are listed in the following table unless
                       otherwise amended by these conditions.




               ABN 97.969.214.121                                                               PO Box 141
               noosa.qld.gov.au                                                          Tewantin QLD 4565
               [email protected]                                                          07 5329 6500
                                                                                                      Page 1 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024
Full text of the other 12 pages

Page 2

                         Plan No.      Rev.    Plan/Document Name                             Date

                         100           B       Site Layout Plan                               18 October 2023
                                               Prepared by BAX Engineering

                         200           B       Earthworks Layout Plan                         18 October 2023
                                               Prepared by BAX Engineering

                         201           B       Earthworks Sections                            18 October 2023
                                               Prepared by BAX Engineering

                         300           B       Overall Roadworks Layout Plan                  18 October 2023
                                               Prepared by BAX Engineering

                         301           B       Roadworks Layout Plan Sheet 1 of 2             18 October 2023
                                               Prepared by BAX Engineering

                         302           B       Roadworks Layout Plan Sheet 2 of 2             18 October 2023
                                               Prepared by BAX Engineering

                         310           B       Roadworks Longitudinal Sections Sheet 1 of 2   18 October 2023
                                               Prepared by BAX Engineering

                         311           B       Roadworks Longitudinal Sections Sheet 2 of 2   18 October 2023
                                               Prepared by BAX Engineering

                         320           B       Roadworks Cross Sections Sheet 1 of 3          18 October 2023
                                               Prepared by BAX Engineering

                         321           B       Roadworks Cross Sections Sheet 2 of 3          18 October 2023
                                               Prepared by BAX Engineering

                         323           B       Roadworks Cross Sections Sheet 3 of 3          18 October 2023
                                               Prepared by BAX Engineering

                         QE-01         Final   Environmental Assessment Report                15 August 2022
                                               Prepared by Fox & Co. Environmental

                         -             -       Riparian Rehabilitation Plan                   -
                                               Prepared by Equilibrium Ecology

                         -             1       Bushfire Hazard Assessment                     31 August 2022
                                               Prepared by Equilibrium Ecology

                         -             1       Bushfire Evacuation Plan                       26 January 2024
                                               Prepared by Equilibrium Ecology




                                                                                                     Page 2 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024

Page 3

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 7 May 2026, unless an application to extend the currency period is
                      approved by Council.
               SITE SPECIFIC CONDITIONS
                      Bonds
               3.     A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the
                      pre-start meeting. The pre-start meeting will only be held once Council's Construction
                      Engineering Officer has confirmation that the bond monies have been received by Council.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      these conditions or any additional inspections incurred for substandard work or work
                      undertaken not in accordance with this permit.
               4.     Prior to the prestart meeting for the rehabilitation works, a bank guarantee or a bond of
                      $10,000 must be lodged as security for the completion of the rehabilitation works and three-
                      year performance maintenance period identified in the conditions of this approval.
               5.     Bonds must:
                      a.      have approval of the bond calculations and amount from Council prior to lodgement;
                      b.      be lodged with Council and accompanied by the Bond Administration Fee/s; and
                      c.      be requested for release by writing to Council, when relevant approval requirements
                              have been met.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               6.     All necessary approvals from external service providers (e.g., Unitywater) and external
                      parties on which the development works are proposed have been obtained and a copy
                      supplied to Council.
               7.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to council at the prestart meeting / prior to any works commencing.
               8.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               9.     Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Landscape works;
                      c.      Erosion and sediment control works; and
                      d.      Other relevant parties.
               10.    A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      Traffic management during all phases of construction;
                      b.      Adequate parking arrangements for works and deliveries;
                      c.      appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD); and
                      d.      provision for safe vehicle and pedestrian access across the frontage of the site both
                              during daily construction and after daily construction has ceased.




                                                                                                      Page 3 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024

Page 4

               11.    Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               12.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
               DURING CONSTRUCTION
                      Retention of Existing Trees and Vegetation
               13.    All trees and vegetation identified for retention must be protected in accordance with AS
                      4970, Protection of trees on development sites.
                      Fauna Management
                      A qualified person* must be engaged to manage fauna prior and during clearing to:
                      a.      Ensure works are carried out in accordance with the approved Environmental
                              Assessment Report; and the Nature Conservation Act 1992.
                      b.      Undertake pre-clearing inspections including fauna relocation and removal or blocking
                              of all vacant hollows.
                      c.      Ensure clearing works avoids nesting times of animals and birds.
                      d.      Provide a written report to Council with the request for the prestart meeting of all pre-
                              clearing activities and initiatives.
                      e.      Co-ordinate staging and sequence of clearing with fauna protection.
                      f.      Protect and recover fauna during clearing operations (fauna not previously removed).
                      g.      Manage the translocation of animals and recovery procedures in accordance with
                              relevant legislation.
                      h.      Undertake protection works for mulching of any stockpiled vegetation.
                      *(Refer to Advisory Note)
                      Plant Pest Management
               14.    A qualified person* must manage plant pest (weeds) to:
                      a.      Ensure plants listed as Class 1, 2 declared pests and environmental weeds within
                              Council’s Pest Management Plan are controlled and prevented from spreading.
                      b.      Oversee management techniques that minimise regrowth, prevent damage to non-
                              target species, retain conservation values and maintains site stability.
                      *(Refer to Advisory Note)
                      Land Rehabilitation
               15.    Rehabilitation works must be undertaken in accordance with the approved Riparian
                      Rehabilitation Plan prepared by Equilibrium Ecology.
               16.    Rehabilitation works must be supervised, undertaken and certified by qualified persons*. All
                      works must be completed in accordance with this Decision Notice.
               17.    The following amounts of the bank guarantee/bond may be returned at the end of each
                      performance criteria year following Council approval as follows:
                      a.      Year 1 - $5,000
                      b.      Year 2 - $3,000
                      c.      Year 3 - $2,000
               18.    The Rehabilitation supervisor must annually:
                      a.      Organise formal inspection with Council’s delegate*.



                                                                                                         Page 4 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024

Page 5

                      b.      Submit to Council (with each inspection request) a Rehabilitation Status Report (written
                              and photographic), mapping:
                              i.       The condition of the regeneration area.
                              ii.      Detailing works undertaken in the previous year.
                              iii.     The percentage cover of indigenous recruitment.
                              iv.      Measuring the works against the conditioned Performance Criteria.
                      *(Refer to Advisory Notes)
               19.    Rehabilitation works must meet the following Performance Criteria for:
                      a.      Year One – 12 months after installation:
                              i.       Planted trees have achieved an average height of 1m.
                              ii.      Planted shrubs have achieved an average height of 0.4m.
                      b.      Year Two - 24 months after the installation:
                              i.       Planted trees have achieved an average height of 2m.
                              ii.      Planted shrubs have achieved an average height of 1m.
                      c.      Year Three - Final acceptance installation:
                              i.       Planted trees have achieved an average height of 3m.
                              ii.      Planted shrubs have achieved an average height of 1.2m.
                              iii.     Canopy and / or vegetative strata must not be devoid for any area greater than
                                       1.0m2 within any 10m2 sample.
                              iv.      Plant density shading out and/or self-mulching.
                      d.      The duration of the establishment period:
                              i.       Adherence to maintenance regime for rehabilitation and revegetation areas.
                              ii.      No evidence of woody weeds reshooting from stumps, poisoned trees or the
                                       regrowth of cut stumps.
                              iii.     No evidence of over-weeding or impact on non-target species.
                              iv.      Signs of indigenous recruitment in rehabilitation areas.
                              v.       Weed infestations less than 5% of the rehabilitation areas.
                              vi.      Any failed plants within the previous 12 month period have been replaced.
                              vii.     Healthy and vigorous growth allowed to grow to full form.
                              viii.    Mulch layer sufficient to suppress weeds.
                         Bushfire Management
               20.    A qualified person* must be engaged for the duration of the works to ensure:
                      a.      Works are carried out in accordance with the approved Bushfire Hazard Assessment
                              (Ver. 1) prepared by Equilibrium Ecology dated 31 August 2022.
                      b.      The asset protection zones and the fire management access paths are established for
                              both the new and existing building envelopes.
                      Engineering
               21.    The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.


                                                                                                        Page 5 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024

Page 6

               22.    All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               23.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice;
                      b.      The relevant conditions of the higher order Material Change of Use approval viz.
                              MCU22/0052 to which this approval relates;
                      c.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines; and
                      d.      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                      Works within Road Reserve/Reinstatement
               24.    Safe vehicle and pedestrian access on all streets in the vicinity of the development must be
                      maintained at all times. Should footpath/road closures be necessary to carry out construction
                      works, Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               25.    All frontage works must match neatly with existing road and verge/footpath features.
                      Additional works beyond the frontage may be required to provide an acceptable transition to
                      existing road and verge/footpath profiles.
               26.    Electrical conduits or other services proposed to be installed within existing and proposed
                      road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
                      driveways or significant vegetation must be installed by boring. Trenching is not permitted,
                      unless specifically approved by Council.
                      Site Access and Driveways
               27.    Driveway crossovers must be constructed in accordance with council’s Standard Drawings
                      RS-056 and any associated addendum.
               28.    Any existing unnecessary or redundant property accesses must be removed, and the kerb,
                      footpath and verge area reinstated to match the existing footpath and/or verge treatments.
                      Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
                      or turf, and must be maintained by the developer until established.
               29.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      a.      The driveway surfacing must consist of either an approved hot mixed asphaltic
                              concrete or patterned/plain concrete, or an approved all-weather purpose material;
                      b.      The driveway must be constructed so as not to concentrate stormwater runoff onto
                              neighbouring properties;
                      c.      Underground service conduits for water supply, electricity and any other services must
                              be provided as part of the access driveway;
                      d.      Where there is an existing pedestrian path, a matching crossfall must be provided for
                              the driveway on the alignment of the path, for the full width of the path; and
                      e.      The property access must be located a minimum of 1m clear of existing power poles,
                              streetlights or other signage. The developer is responsible for any necessary relocation
                              of existing services to provide this clearance and must contact the relevant service
                              authorities and comply with their requirements in relation to these works.




                                                                                                        Page 6 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024

Page 7

                      Earthworks and Retaining Walls
               30.    All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
                      on Earthworks for Commercial and Residential Development, with geotechnical testing
                      undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as
                      defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and
                      uniformity of fill shall be provided by a RPEQ and submitted to Council.
               31.    Slope and batters are a maximum grade of:
                      a.      1 in 6 where in proximity to waterbodies;
                      b.      1 in 4 for grassed areas;
                      c.      1 in 3 for planted areas; and
                      d.      1 in 2 for combined structural engineering and planting solutions.
                      Stormwater Drainage
               32.    Appropriate scour protection must be provided at the outlet of all stormwater pipes including
                      temporary outlets.
               33.    Works associated with this permit must not adversely impact on the existing drainage
                      conditions on other properties (e.g., by blocking or interfering with natural overland flows).
               34.    Construction of all internal stormwater drainage works must comply with the relevant
                      section/s of Australian Standard AS/NZS 3500.3.
                      Erosion and Sediment Control
               35.    Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
                      Regulation 2019) must not be released from the site or to waters within the site, or be likely
                      to be released should rainfall occur, unless all reasonable and practicable measures are
                      taken to prevent or minimise the release and concentration of contamination.
               36.    Sediment and erosion control measures must be in place prior to works commencing. If such
                      measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
                      fines can be issued if sediments from the site are found to enter or have the potential to enter
                      Council’s stormwater system, natural waterways, any downstream stormwater filtration
                      system or adversely impacting on other properties. The sediment and erosion control design
                      and measures have NOT been approved, it is the site's Supervising Engineer who is
                      responsible for ensuring that the sediment and erosion control measures have:
                      a.      Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
                              practise" methods;
                      b.      Been revised by an RPEQ or CPESC to address the issues raised by changes in the
                              projected construction schedule and/or methods;
                      c.      Been revised to address predicted rainfall events; and
                      d.      Achieve the desired environmental outcomes.
                      Council may request further controls to be installed should the implemented measures be
                      found inefficient.
               37.    The erosion and sediment control measures must be designed, installed and maintained in
                      accordance with the supervising engineer instructions and the current best practice
                      standards * (Refer to Advisory Note).
               38.    The developer must ensure non-essential exposure of soil is prevented by restricting the
                      extent of disturbance and minimising the duration of soil exposure to adverse weather
                      conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
                      to rainfall occurring.




                                                                                                       Page 7 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024

Page 8

               39.    The developer must ensure sediment does not leave the site or enter onto adjoining
                      properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
                      machinery. It is essential to implement appropriate approved erosion and sediment control
                      measures throughout the site during all phases of construction including vehicle shakedown
                      pad/grid (or similar) at the access to the construction site. Where sediments or other
                      contaminants are deposited on a road, they must be removed so as not to enter Council’s
                      drainage system or waterways.
               40.    Prior to the completion of the development and commencement of use, all site surfaces must
                      be effectively stabilised using methods which have achieved effective short-term stabilisation
                      and which will continue to achieve effective stabilisation in the medium to long-term.
                      For the purpose of this condition, an effectively stabilised surface is defined as one that does
                      not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion
                      or lead to sedimentation, or lead to water contamination.
                      Damage to Services and Assets
               41.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               FOLLOWING CONSTRUCTION
                      Certification
               42.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the Operational Works permit.
                      Bonds
               43.    Performance Bonds must be lodged for:
                      Rehabilitation
                      On Maintenance
               44.    Maintenance periods* must be:
                      a.      36 months for Rehabilitation or subject to meeting final performance criteria.
                      *(Refer to Advisory Note)
               45.    Prior to requesting an On Maintenance inspection, the following information package
                      (prepared by respective qualified persons* and certifying compliance with approvals) must
                      be submitted to Council:
                      a.      All required bonds.
                      b.      Landscaping certification.
                      c.      Pest Plant certification.
                      Bushfire management certification.
                      Off Maintenance
               46.    Prior to requesting an Off Maintenance inspection, the following must be provided:
                      a.      Written request of bond release; and
                      b.      Rehabilitation certification confirming all works have been met all performance
                              outcomes in accordance with conditions of approval.



                                                                                                             Page 8 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024

Page 9

               47.    Off Maintenance Inspection must be requested:
                      a.      By contacting Council.*
                      b.      Only after lodgement of all required certification and documentation.
                      *(Refer to Advisory Note)
               48.    A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
                      where:
                      a.      a Council inspection reveals works do not comply with approval requirements; or
                      b.      submitted certification falsely states works comply with approval requirements.
               49.    A final inspection and approval of the new driveway and completed reinstatement works by
                      Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
                      inspection.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Retention of Existing Trees
               1.     The existing trees on adjoining properties must be retained and protected during construction
                      wherever achievable. To avoid doubt, this advisory note is not intended to exclude the
                      operation of Chapter 3 of the Neighbourhood Dispute Resolution Act 2011 following
                      construction of the development which is the subject of this development approval.
                      Removal of Existing Trees and Vegetation
               2.     Stockpiling mulch to the appropriate volume and separation is required for fire mitigation as
                      well as optimum weed seed sterilisation.
                      Qualified Person
               3.     Qualified Person, for the purpose of:
                      a.      Supervising landscape works and preparing a landscape certification, is considered to
                              be a landscape architect, landscape designer or horticulturist with a minimum of three
                              years current experience in the field of landscape design.
                      b.      Undertaking landscape construction and establishment works is considered to be a
                              person with five years current experience in commercial landscape construction
                              projects.
                      c.      Undertaking rehabilitation construction and establishment works is considered to be a
                              person with five years current experience in revegetation and regeneration.
                      d.      Undertaking, supervising tree works and preparing arboriculture certification, is
                              considered to be a person with a minimum three years current experience in tree
                              protection, hazard identification/mitigation and AS2302 – Tree stock for landscape use
                              and either:
                              i.       International Society of Arboriculture (ISA) certification; or
                              ii.      A Diploma of Arboriculture.
                      e.      Managing Fauna protection is considered to be a certified Fauna Spotter Catcher.
                      f.      Preparing certification and managing declared plant pests, is considered to be:
                              i.       a landscape architect with a minimum of 3 years current experience in the field
                                       of pest plant management;



                                                                                                        Page 9 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024

Page 10

                              ii.      a botanist or ecologist with a minimum of 3 years current experience in the field
                                       of pest plant management;
                              iii.     an environmental consultant with a minimum of 3 years current experience in the
                                       field of pest plant management.
                      g.      Supervising and certifying Bushfire Management is considered to be an Ecologist with
                              suitable experience or a person with Fire Protection Association Australia – Bushfire
                              Planning and Design certification.
                      Landscape Works
               4.     The applicant must pay the re-inspection fee in accordance with Council's Fees and Charges
                      Register where:
                      a.      An inspection revealed that any constructed rehabilitation/landscape works do not
                              comply with the conditions of the Decision Notice, Approved Plans and or Approved
                              Documents.
                      b.      Certification is submitted to Council falsely stating that works comply with the approved
                              plans, documents and or conditions of the Decision Notice.
                      General Advisory Notes
               5.     As this driveway is a private structure, the owner bears full responsibly for the standard of its
                      construction, maintenance and any liabilities associated with its construction. It is
                      recommended that professional advice be sought for the construction of the driveway to
                      ensure that the driveway is constructed in accordance with standard drawings RS-049, RS-
                      050 and any associated addendum.
               6.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
                      the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               7.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               8.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Prestart, On and Off Maintenance Inspections Request
               9.     Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
                      business days’ notice of preferred inspection time.
               10.    If Council officers are required to undertake additional inspections of the same works, a
                      reinspection fee will be applicable in accordance with Council’s Fees and Charges register
                      applicable at the time.
               11.    Request for On Maintenance is the responsibility of the developer. No credit will be given
                      due to failure to request inspection. Maintenance works are the responsibility of the
                      developer and must include regular inspections, repairs, rectifications and establishment. A
                      single maintenance run immediately prior to inspection is not acceptable.
                      Environmental Advisory Notes




                                                                                                         Page 10 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024

Page 11

               12.    The Environmental Protection Act 1994 states that a person must not carry out any activity
                      that causes, or is likely to cause, environmental harm unless the person takes all reasonable
                      and practicable measures to prevent or minimise the harm. Environmental harm includes
                      environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
                      construction and landscaping phases of this development are to adhere to their ‘general
                      environmental duty’ to minimise the risk of causing environmental harm.
                      Erosion and Sediment Control
               13.    Accepted best practice standards include International Erosion Control Association
                      Australasia Best Practice Erosion and Sediment Control.
               14.    Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
                      in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
                      Engineer of Queensland (RPEQ).
               15.    As a general rule, a site is determined to have achieved effective short-term stabilisation if
                      at the time of the plan sealing inspection:
                      a.      Methods of stabilisation are:
                              •    appropriate for slopes and slope lengths; and
                              •    are consistent with best practice environmental management practices such as in
                                   the Manual for Erosion and Sediment Control or the IECA Manual; and
                      b.      Stormwater runoff from the site is not currently, and is not likely to result in visible
                              evidence of sedimentation or erosion, or lead to water contamination.
               Infrastructure Charges
               16.    All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
               7.     PROPERTY NOTES

               The following property notes will be placed against the subject property in Council’s property record
               system:
                      Bushfire Management
               1.     The owner is advised to access the ‘Bushfire Awareness Package’ including a copy of the
                      approved Bushfire Hazard Assessment (Ver. 1) prepared by Equilibrium Ecology dated 31
                      August 2022, the approved Bushfire Evacuation Plan (Ver. 1) prepared by Equilibrium
                      Ecology dated 26 January 2024, and the Bushfire Prepared Communities brochure or latest
                      equivalent prepared by the Queensland Fire and Rescue Service (available online at
                      www.fire.qld.gov.au)
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

               Not applicable.
               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.



                                                                                                       Page 11 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024

Page 12

               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               12.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.




               Yours faithfully




               Daniel Epps
               Graduate Development Engineer



               Enc:   Appeal Rights
                      Approved Plans/Documents
               cc.    Unitywater




                                                                                                     Page 12 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024

Page 13

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 13 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024

Used in these records

About this file

File size
182 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - OPW24 0025.pdf · 182 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.