Council archive · source document
Decision Notice - OPW24 0025 · OPW24/0025
Plan No. Rev. Plan/Document Name Date
100 B Site Layout Plan 18 October 2023
Prepared by BAX Engineering
200 B Earthworks Layout Plan 18 October 2023
Prepared by BAX Engineering
201 B Earthworks Sections 18 October 2023
Prepared by BAX Engineering
300 B Overall Roadworks Layout Plan 18 October 2023
Prepared by BAX Engineering
301 B Roadworks Layout Plan Sheet 1 of 2 18 October 2023
Prepared by BAX Engineering
302 B Roadworks Layout Plan Sheet 2 of 2 18 October 2023
Prepared by BAX Engineering
310 B Roadworks Longitudinal Sections Sheet 1 of 2 18 October 2023
Prepared by BAX Engineering
311 B Roadworks Longitudinal Sections Sheet 2 of 2 18 October 2023
Prepared by BAX Engineering
320 B Roadworks Cross Sections Sheet 1 of 3 18 October 2023
Prepared by BAX Engineering
321 B Roadworks Cross Sections Sheet 2 of 3 18 October 2023
Prepared by BAX Engineering
323 B Roadworks Cross Sections Sheet 3 of 3 18 October 2023
Prepared by BAX Engineering
QE-01 Final Environmental Assessment Report 15 August 2022
Prepared by Fox & Co. Environmental
- - Riparian Rehabilitation Plan -
Prepared by Equilibrium Ecology
- 1 Bushfire Hazard Assessment 31 August 2022
Prepared by Equilibrium Ecology
- 1 Bushfire Evacuation Plan 26 January 2024
Prepared by Equilibrium Ecology
Page 2 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - OPW24 0025.pdfRelated documentApplication case desk ↗
About this file
- File size
- 182 KB (small file)
- File type
No other editions are linked here.