11. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
12. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Retention of Existing Trees and Vegetation
13. All trees and vegetation identified for retention must be protected in accordance with AS
4970, Protection of trees on development sites.
Fauna Management
A qualified person* must be engaged to manage fauna prior and during clearing to:
a. Ensure works are carried out in accordance with the approved Environmental
Assessment Report; and the Nature Conservation Act 1992.
b. Undertake pre-clearing inspections including fauna relocation and removal or blocking
of all vacant hollows.
c. Ensure clearing works avoids nesting times of animals and birds.
d. Provide a written report to Council with the request for the prestart meeting of all pre-
clearing activities and initiatives.
e. Co-ordinate staging and sequence of clearing with fauna protection.
f. Protect and recover fauna during clearing operations (fauna not previously removed).
g. Manage the translocation of animals and recovery procedures in accordance with
relevant legislation.
h. Undertake protection works for mulching of any stockpiled vegetation.
*(Refer to Advisory Note)
Plant Pest Management
14. A qualified person* must manage plant pest (weeds) to:
a. Ensure plants listed as Class 1, 2 declared pests and environmental weeds within
Council’s Pest Management Plan are controlled and prevented from spreading.
b. Oversee management techniques that minimise regrowth, prevent damage to non-
target species, retain conservation values and maintains site stability.
*(Refer to Advisory Note)
Land Rehabilitation
15. Rehabilitation works must be undertaken in accordance with the approved Riparian
Rehabilitation Plan prepared by Equilibrium Ecology.
16. Rehabilitation works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice.
17. The following amounts of the bank guarantee/bond may be returned at the end of each
performance criteria year following Council approval as follows:
a. Year 1 - $5,000
b. Year 2 - $3,000
c. Year 3 - $2,000
18. The Rehabilitation supervisor must annually:
a. Organise formal inspection with Council’s delegate*.
Page 4 of 13
Document Set ID: 23009397
Version: 3, Version Date: 10/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - OPW24 0025.pdfRelated documentApplication case desk ↗
About this file
- File size
- 182 KB (small file)
- File type
No other editions are linked here.