SUPERSEDED Decision Notice - 010.2007.00002104.001 [As Published] · 142007.2104

of 8

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                     4 of 8


15.    All 45 litre trees must be planted with a clean trunk of 1 metre in height to ensure clear vehicle sight lines
       within the carpark.

16.    The applicant must ensure that all landscaping treatment does not unduly restrict/prevent access to
       service meters within the site.

17.    All trees must be planted a minimum of 1 metre from all services.

18.    This Development Permit lapses if the development has not happened by 16 January 2010, unless
       application to extend the currency is approved by Council.
Land Development
19.    The development shall be carried out in accordance with Engineering drawings Nos.

              17003-OW1 dated October 2007                by SCG Consulting Engineers

              1682-2                dated 11 July 2007           by Construction Hydraulics

              1682-3A               dated 14 November 2007       by Construction Hydraulics

              480.N00-001-01        dated 3 May 2007             by Dezignteam

              480.N00-101-01        dated 3 May 2007             by Dezignteam

              or as modified herein.

20.    Excavation of the site and the construction of the proposed works shall not have any adverse affects on
       the stability of adjoining buildings and/or structures and/or services and/or lands. In this regard a
       Registered Professional Engineer Queensland shall supervise the excavation of the site and the
       construction of the new works to determine whether any additional measures are required to protect the
       stability of adjoining buildings and/or structures and/or services and/or lands.

21.    The use of vibratory equipment of any kind is not permitted to be used (including vibrating rollers and the
       use of vibrating installation techniques for sheet piling and other construction vibrations caused by
       excavating, earthmoving or demolition machinery or other similar construction techniques) unless
       approved and supervised by a Certified Geotechnical Engineer. Under such circumstances the operator
       of such equipment shall at all times comply with the directions of the Geotechnical engineer and the
       reasonable and lawful directions of Council officers.

22.    Should any works, including sheet piling anchors, be required within the adjoining properties that are not
       part of this development. The developer/applicant must obtain written consent from those property owners
       to carry out works within their properties.

23.    Certification of the completed works must be provided to Council by the supervising engineer. The
       certification shall state that the completed works conform with all aspects of the design and that the
       completed works will not have any adverse affects on the stability of adjoining buildings and/or structures
       and/or services and/or lands.

24.    Roof and surface runoff connection to Council’s drainage system shall be as shown on drawing No. 1682-
       3A.

25.    Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
       first existing external downstream stormwater structure.
       These devices are to be checked and cleaned on a regular basis and specifically after each rain event.
       These devices are to remain in place during the civil works and construction phases of the development.
       The location and type of device to be installed shall be established at the “pre start” meeting with
       Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
26.    Council’s Construction Technical Officer – Mick Conroy (ph 0410 512 505), shall be given seven (7) days’
       notice of intention to commence works to arrange a “pre start” meeting regarding the civil works.

27.    The principal contractor must have all the appropriate insurance and public liability documentation to carry
       out the works. The principal contractor is also responsible to ensure that any sub contractors also have
       the appropriate insurance and public liability documentation.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d4038b08\@[email protected]

Used in these records

About this file

File size
36 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Decision Notice - 010.2007.00002104.001 [As Published].pdf · 36 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.