SUPERSEDED Decision Notice - 010.2007.00002104.001 [As Published] · 142007.2104
NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 8
28. Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
signed approved drawings and conditions by the applicant.
29. The Consulting Engineers for the project shall be currently Registered Professional Engineers of
Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with
Council’s Construction Technical Officer or nominated staff. Council’s Construction Technical Officer shall
provide an inspection form for signing off by the Engineer at appropriate stages of construction, during on-
site meetings. Construction Technical Officer will also sign the form at each stage when conditions
required have been satisfied. The works will be accepted “On Maintenance” after this form, signed by the
inspector for each stage is complete, together with a letter from the Engineer requesting that the works go
“On Maintenance”.
30. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
(This person will be the contact for the project).
31. Council standards shall apply to these works unless otherwise modified herein.
32. The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
during the construction of the engineering works to ensure that Council property, road pavements or
facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
furniture etc.) are protected against any damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
Development and shall forthwith rectify the damage to that property or facility at its cost and to the
satisfaction of the Manager Land Development.
All rectification works are to be completed prior to the commencement of the use or, alternatively, the
Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
being paid by the Applicant to the Council prior to the commencement of the use.
In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
Applicant, such cost being paid prior to the commencement of the use.
33. The development of the site shall be carried out in such a manner as to prevent dust and/or sand
nuisance to residents and/or tenants in the vicinity of the development.
34. Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
hours are approved by the Manager-Land Development or his nominee.
35. All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
Traffic Control Devices and Traffic Infrastructure (Roads) Act.
36. Safe pedestrian access on Orealla Crescent and Ventura Street shall be maintained at all times. Should
footpath / road closures be necessary to carry out construction works, Council’s Construction Technical
Officer (ph 0410 512 505) must be notified prior to the proposed closure.
37. Sediment and erosion control measures must be in place prior to works commencing. If such measures
are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
natural waterways. Although the sediment and erosion control measures have been approved on
drawings Nos. 17003-OW1, 480.N00-001-01, Council’s Manager – Land Development may request
further controls to be installed should approved measures be inefficient.
38. The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant traps in
accordance with the manufacturers specifications.
39. The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant traps on a
weekly basis and after each storm event.
The owners of the subject property shall enter into an ongoing maintenance contract with a Registered
Contractor to clean and maintain the grease/oil arrestor pits/gross pollutant traps on a regular three
monthly cycle and on a “On Call” basis in the case of an emergency.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d4038b08\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2007.00002104.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 36 KB (small file)
- File type
No other editions are linked here.