Original source · versioned page text
Attachment 1 - Proposal Plans
The original of this document is very large (16.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn WORK HEALTH & SAFETY NOTES
THESE WORK HEALTH & SAFETY NOTES MUST BE PROVIDED TO ALL OWNERS, BUILDING CONTRACTORS, SUB-CONTRACTORS, CONSULTANTS, RENOVATORS,
OPERATORS, MAINTENANCE PERSONNEL, DEMOLITION CONTRACTORS, & ALL OTHERS ASSOCIATED WITH PERFORMING WORK ON/OR WITHIN THE BUILDING &
SURROUNDS. THE WORK HEALTH & SAFETY NOTES ARE TO BE FULLY READ & UNDERSTOOD BY ALL PERSONS PRIOR TO COMMENCING ANY WORK.
RESTRICTED ON - SITE LOADING / UNLOADING
CONSTRUCTION OF THIS BUILDING WILL REQUIRE LOADING & UNLOADING OF MATERIALS ON THE
ROADWAY. DELIVERIES SHOULD BE WELL PLANNED TO AVOID CONGESTION OF LOADING AREAS
1. FALLS, SLIPS, TRIPS BUILDING OWNERS & OCCUPIERS SHOULD MONITOR THE PEDESTRIAN ACCESS WAYS & IN
& TRAINED TRAFFIC MANAGEMENT PERSONNEL SHOULD BE USED TO SUPERVISE
PARTICULAR, ACCESS TO AREAS WHERE MAINTENANCE IS ROUTINELY CARRIED OUT TO ENSURE
a. WORKING AT HEIGHTS THAT SURFACES HAVE NOT MOVED OR CRACKED SO THAT THEY BECOME UNEVEN & PRESENT LOADING/UNLOADING AREAS.
A TRIP HAZARD. SPILLS, LOOSE MATERIAL, STRAY OBJECTS OR ANY OTHER MATTER THAT
DURING CONSTRUCTION MAY CAUSE A SLIP OR TRIP HAZARD SHOULD BE CLEANED OR REMOVED FROM ACCESS WAYS. ALL BUILDING SITES
WHEREVER POSSIBLE, COMPONENTS FOR THIS BUILDING SHOULD BE PREFABRICATED OFF-SITE BUSY CONSTRUCTION & DEMOLITION SITES PRESENT A RISK OF COLLISION
OR AT GROUND LEVEL TO MINIMISE THE RISK OF WORKERS FALLING MORE THAN TWO METRES. CONTRACTORS SHOULD BE REQUIRED TO MAINTAIN A TIDY WORK SITE DURING CONSTRUCTION, WHERE DELIVERIES & OTHER TRAFFIC ARE MOVING WITHIN THE SITE. A
HOWEVER, CONSTRUCTION OF THIS BUILDING WILL REQUIRE WORKERS TO BE WORKING AT MAINTENANCE OR DEMOLITION TO REDUCE THE RISK OF TRIPS & FALLS IN THE WORKPLACE. TRAFFIC MANAGEMENT PLAN SUPERVISED BY TRAINED TRAFFIC
HEIGHTS WHERE A FALL IN EXCESS OF TWO METRES IS POSSIBLE & INJURY IS LIKELY TO MATERIALS FOR CONSTRUCTION OR MAINTENANCE SHOULD BE STORED IN DESIGNATED AREAS MANAGEMENT PERSONNEL SHOULD BE ADOPTED FOR THE WORK SITE.
RESULT FROM SUCH A FALL. THE BUILDER SHOULD PROVIDE A SUITABLE BARRIER WHEREVER AWAY FROM ACCESS WAYS & WORK AREAS.
A PERSON IS REQUIRED TO WORK IN A SITUATION WHERE FALLING MORE THAN TWO METRES
4. SERVICES
IS A POSSIBILITY. 2. FALLING OBJECTS
RUPTURE OF SERVICES DURING EXCAVATION OR OTHER ACTIVITY CREATES A VARIETY OF
DURING OPERATION OR MAINTENANCE LOOSE MATERIALS OR SMALL OBJECTS RISKS INCLUDING RELEASE OF HAZARDOUS MATERIAL. EXISTING SERVICES ARE LOCATED ON
CLEANING & MAINTENANCE OF WINDOWS, WALLS, ROOF OR OTHER COMPONENTS OF THIS CONSTRUCTION, MAINTENANCE OR DEMOLITION WORK ON OR AROUND THIS BUILDING IS LIKELY OR AROUND THIS SITE. WHERE KNOWN, THESE ARE IDENTIFIED ON THE PLANS BUT THE
BUILDING WILL REQUIRE PERSONS TO BE SITUATED WHERE A FALL FROM A HEIGHT IN EXCESS TO INVOLVE PERSONS WORKING ABOVE GROUND LEVEL OR ABOVE FLOOR LEVELS. WHERE EXACT LOCATION & EXTENT OF SERVICES MAY VARY FROM THAT INDICATED. SERVICES
OF TWO METRES IS POSSIBLE. WHERE THIS TYPE OF ACTIVITY IS REQUIRED, SCAFFOLDING, THIS OCCURS ONE OR MORE OF THE FOLLOWING MEASURES SHOULD BE TAKEN TO AVOID SHOULD BE LOCATED USING AN APPROPRIATE SERVICE ( SUCH AS DIAL BEFORE YOU DIG ),
LADDERS OR TRESTLES SHOULD BE USED IN ACCORDANCE WITH RELEVANT CODES OF OBJECTS FALLING FROM THE AREA WHERE THE WORK IS BEING CARRIED OUT ONTO PERSON APPROPRIATE EXCAVATION PRACTICE SHOULD BE USED &, WHERE NECESSARY, SPECIALIST
PRACTICE, REGULATIONS OR LEGISLATION. BELOW. CONTRACTORS SHOULD BE USED.
1. PREVENT OR RESTRICT ACCESS TO AREAS BELOW WHERE THE WORK IS BEING
WHERE CLEANING & MAINTENANCE OF ANY COMPONENTS OF/OR INSTALLATIONS WITHIN THIS CARRIED OUT. SITES WITH UNDERGROUND POWER
BUILDING MEANS THAT THE USE OF LADDERS OR TRESTLES ARE NOT APPROPRIATE, 2. PROVIDE TOEBOARDS TO SCAFFOLDING OR WORK PLATFORMS. UNDERGROUND POWER LINES ARE LOCATED IN OR AROUND THIS SITE. ALL UNDERGROUND
SCAFFOLDING, FALL BARRIERS OR PERSONAL PROTECTIVE EQUIPMENT (PPE) SHOULD BE USED 3. PROVIDE PROTECTIVE STRUCTURE BELOW THE WORK AREA. POWER LINES MUST BE DISCONNECTED OR CAREFULLY LOCATED & ADEQUATE WARNING SIGNS
IN ACCORDANCE WITH RELEVANT CODES OF PRACTICE, REGULATIONS & LEGISLATION. 4. ENSURE THAT ALL PERSONS BELOW THE WORK AREA HAVE PERSONAL PROTECTIVE USED PRIOR TO ANY CONSTRUCTION, MAINTENANCE OR DEMOLITION COMMENCING.
EQUIPMENT
ANCHORAGE POINTS FOR PORTABLE SCAFFOLD OR FALL ARREST DEVICES ARE TO BE SITES WITH OVERHEAD POWER LINES
INSTALLED ON/WITHIN THE BUILDING FOR USE BY MAINTENANCE WORKERS. ANY PERSONS BUILDING COMPONENTS OVERHEAD POWER LINES ARE NEAR OR ON THIS SITE. THESE POSE A RISK OF
ENGAGED TO WORK ON THE BUILDING AFTER THE COMPLETION OF CONSTRUCTION WORK ELECTROCUTION IF STRUCK OR APPROACHED BY LIFTING DEVICES OR OTHER PLANT &
DURING CONSTRUCTION, RENOVATION OR DEMOLITION OF THIS BUILDING, PARTS OF THE PERSONS WORKING ABOVE GROUND LEVEL. WHERE THERE IS A DANGER OF THIS OCCURING,
SHOULD BE INFORMED ABOUT THE ANCHORAGE POINTS.
STRUCTURE INCLUDING FABRICATED STEELWORK, HEAVY PANELS & MANY OTHER COMPONENTS POWER LINES SHOULD BE, WHERE PRACTICAL, DISCONNECTED OR RELOCATED. WHERE THIS IS
WILL REMAIN STANDING PRIOR TO OR AFTER SUPPORTING PARTS ARE IN PLACE. NOT PRACTICAL ADEQUATE WARNING IN THE FORM OF BRIGHT COLOURED TAPE OR SIGNAGE
b. SLIPPERY OR UNEVEN SURFACES CONTRACTORS SHOULD ENSURE THAT TEMPORARY BRACING OR OTHER REQUIRED SUPPORT IS SHOULD BE USED OR A PROTECTIVE BARRIER PROVIDED.
IN PLACE AT ALL TIMES WHEN COLLAPSE WHICH MAY INJURE PERSONS IN THE AREA IS A
FLOOR FINISHES POSSIBILTY.
SPECIFIED FINISHES MUST BE SELECTED TO MINIMISE THE RISK OF FLOORS & PAVED AREAS
BECOMING SLIPPERY WHEN WET OR WHEN WALKED ON WITH WET SHOES/FEET. ANY CHANGES
5. MANUAL TASKS
MECHANICAL LIFTING OF MATERIALS & COMPONENTS DURING CONSTRUCTION, MAINTENANCE OR
TO THE SPECIFIED FINISH SHOULD BE MADE IN CONSULTATION WITH THE DESIGNER OR, IF THIS DEMOLITION PRESENTS A RISK OF FALLING OBJECTS. CONTRACTORS SHOULD ENSURE THAT COMPONENTS WITHIN THIS DESIGN WITH A MASS IN EXCESS OF 25KG SHOULD BE LIFTED BY
IS NOT PRACTICAL, SURFACES WITH AN EQUIVALENT OR BETTER SLIP RESISTANCE SHOULD BE APPROPRIATE LIFTING DEVICES ARE USED, THAT LOADS ARE PROPERLY SECURED & THAT TWO OR MORE WORKERS OR BY MECHANICAL LIFTING DEVICE. WHERE THIS IS NOT PRACTICAL,
CHOSEN. ACCESS TO AREAS BELOW THE LOAD IS PREVENTED OR RESTRICTED. SUPPLIERS OR FABRICATORS SHOULD BE REQUIRED TO LIMIT THE COMPONENT MASS.
THE OWNER IS RESPONSIBLE FOR THE SELECTION OF SURFACE FINISHES IN THE PEDESTRIAN ALL MATERIAL PACKAGING, BUILDING & MAINTENANCE COMPONENTS SHOULD CLEARLY SHOW
TRAFFICABLE AREAS OF THIS BUILDING. SURFACES SHOULD BE SELECTED IN ACCORDANCE 3. TRAFFIC MANAGEMENT THE TOTAL MASS OF PACKAGES & WHERE PRACTICAL ALL ITEMS SHOULD BE STORED ON
WITH AS HB 197:1999 & AS/NZ 4586:2004. SITE IN A WAY WHICH MINIMISES BENDING BEFORE LIFTING. ADVICE SHOULD BE PROVIDED ON
MAJOR ROAD, NARROW ROAD, OR STEEPLY SLOPING ROAD
PARKING OF VEHICLES OR LOADING/UNLOADING OF VEHICLES ON THIS ROADWAY MAY CAUSE SAFE LIFTING METHODS IN ALL AREAS WHERE LIFTING MAY OCCUR.
STEPS, LOOSE OBJECTS & UNEVEN SURFACES A TRAFFIC HAZARD. DURING CONSTRUCTION, MAINTENANCE OR DEMOLITION OF THIS BUILDING
DUE TO DESIGN RESTRICTIONS FOR THIS BUILDING, STEPS &/OR RAMPS ARE INCLUDED IN THE DESIGNATED PARKING FOR WORKERS & LOADING AREAS SHOULD BE PROVIDED. TRAINED CONSTRUCTION, MAINTENANCE & DEMOLITION OF THIS BUILDING WILL REQUIRE THE USE OF
BUILDING WHICH MAY BE A HAZARD TO WORKERS CARRYING OBJECTS OR OTHERWISE TRAFFIC MANAGEMENT PERSONNEL SHOULD BE RESPONSIBLE FOR THE SUPERVISION OF THESE PORTABLE TOOLS & EQUIPMENT. THESE SHOULD BE FULLY MAINTAINED IN ACCORDANCE WITH
OCCUPIED. STEPS SHOULD BE CLEARLY MARKED WITH BOTH VISUAL & TACTILE WARNINGS AREAS. MANUFACTURER'S SPECIFICATIONS & NOT USED WHERE FAULTY OR ( IN THE CASE OF
DURING CONSTRUCTION, MAINTENANCE, DEMOLITION & AT ALL TIMES WHEN THE BUILDING ELECTRICAL EQUIPMENT ) NOT CARRYING A CURRENT ELECTRICAL SAFETY TAG. ALL SAFETY
OPERATES AS A WORKPLACE. GUARDS OR DEVICES SHOULD BE REGULARLY CHECKED & PERSONAL PROTECTIVE EQUIPMENT
SHOULD BE USED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATION.
AAA Design & Development Pty Ltd No. Description Date Mat Deighton APPROVED Workplace Health and Safety 1 of 2
34/13 Norval Court, MAROOCHYDORE, QLD 4558 14 Orealla Cres, Project number D139-01 Revision
Tel/Fax: (07) 5479 6747 SUNRISE BEACH, QLD 4567 Date 24/08/2022 3951- A114
Mob: 0422 039 247
design Drawn by R.S. A
email: [email protected] Development Pty Ltd PROPOSED DUAL OCCUPANCY For & on behalf of AAA
Design & Development Consulting Checked by D.L.T. Scale @A3 1 : 100
A PRELIMINARY 24/08/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.