Log in to see the plans as drawn WORK HEALTH & SAFETY NOTES
THESE WORK HEALTH & SAFETY NOTES MUST BE PROVIDED TO ALL OWNERS, BUILDING CONTRACTORS, SUB-CONTRACTORS, CONSULTANTS, RENOVATORS,
OPERATORS, MAINTENANCE PERSONNEL, DEMOLITION CONTRACTORS, & ALL OTHERS ASSOCIATED WITH PERFORMING WORK ON/OR WITHIN THE BUILDING &
SURROUNDS. THE WORK HEALTH & SAFETY NOTES ARE TO BE FULLY READ & UNDERSTOOD BY ALL PERSONS PRIOR TO COMMENCING ANY WORK.
6. HAZARDOUS SUBSTANCES TIMBER FLOORS 9. OPERATIONAL USE OF BUILDING
THIS BUILDING CONTAINS TIMBER FLOORS WHICH HAVE AN APPLIED FINISH. AREAS WHERE
ASBESTOS IN EXISTING BUILDINGS RESIDENTIAL BUILDINGS
FINISHES ARE APPLIED SHOULD BE KEPT WELL VENTILATED DURING SANDING & APPLICATION,
BUILDING CONSTRUCTED PRIOR TO 1990 & FOR A PERIOD AFTER INSULATION. PERSONAL PROTECTIVE EQUIPMENT MAY ALSO BE WHERE THE BUILDING HAS BEEN DESIGNED AS A RESIDENTIAL BUILDING, & AT A LATER DATE
REQUIRED. THE MANUFACTURER'S RECOMMENDATIONS FOR USE MUST BE CAREFULLY IS USED OR INTENDED AS A WORKPLACE, THE PROVISIONS OF THE WORK HEALTH & SAFETY
IF THIS BUILDING WAS CONSTRUCTED PRIOR TO 1990 & THEREFORE MAY CONTAIN ASBESTOS
CONSIDERED AT ALL TIMES. ACT 2011 OR SUBSEQUENT REPLACEMENT ACT SHOULD BE APPLIED TO THE NEW USE.
EITHER IN CLADDING MATERIAL OR IN FIRE RETARDENT INSULATION MATERIAL. THE BUILDER
SHOULD CHECK &, IF NECESSARY, TAKE APPROPRIATE ACTION BEFORE DEMOLISHING, CUTTING, NON-RESIDENTIAL BUILDINGS - END USE UNKNOWN
SANDING, DRILLING OR OTHERWISE DISTURBING THE EXISTING STRUCTURE.
7. CONFINED SPACES THE BUILDING HAS BEEN DESIGNED TO REQUIREMENTS OF THE CLASSIFICATION IDENTIFIED ON
BUILDING CONSTRUCTED PRIOR TO 1986 THE DRAWINGS. THE SPECIFIC USE OF THE BUILDING IS NOT KNOWN AT THE TIME OF THE
EXCAVATION DESIGN & A FURTHER ASSESSMENT OF THE WORKPLACE HEALTH & SAFETY ISSUES SHOULD
IF THIS BUILDING WAS CONSTRUCTED PRIOR TO 1986 & THEREFORE IS LIKELY TO CONTAIN
CONSTRUCTION OF THIS BUILDING & SOME MAINTENANCE ON THE BUILDING WILL REQUIRE BE UNDERTAKEN AT THE TIME OF FIT-OUT FOR THE END-USER.
ASBESTOS EITHER IN CLADDING MATERIAL OR IN FIRE RETARDENT INSULATION MATERIAL. THE
BUILDER SHOULD CHECK &, IF NECESSARY, TAKE APPROPRIATE ACTION BEFORE DEMOLISHING, EXCAVATION & INSTALLATION OF ITEMS WITHIN EXCAVATIONS. WHERE PRACTICAL, NON-RESIDENTIAL BUILDINGS - END USE KNOWN
CUTTING, SANDING, DRILLING OR OTHERWISE DISTURBING THE EXISTING STRUCTURE. INSTALLATION SHOULD BE CARRIED OUT USING METHODS WHICH DO NOT REQUIRE WORKERS TO
ENTER THE EXCAVATION. WHERE THIS IS NOT PRACTICAL, ADEQUATE SUPPORT FOR THE THIS BUILDING HAS BEEN DESIGNED FOR THE SPECIFIC USE AS IDENTIFIED ON THE DRAWINGS.
POWDERED MATERIALS EXCAVATED AREA SHOULD BE PROVIDED TO PREVENT COLLAPSE. WARNING SIGNS & WHERE A CHANGE OF USE OCCURS AT A LATER DATE A FURTHER ASSESSMENT OF THE
MANY MATERIALS USED IN THE CONSTRUCTION OF THIS BUILDING CAN CAUSE HARM IF BARRIERS TO PREVENT ACCIDENTAL OR UNAUTHORISED ACCESS TO ALL EXCAVATIONS WORKPLACE HEALTH & SAFETY ISSUES SHOULD BE UNDERTAKEN.
INHALED IN POWDERED FORM. PERSONS WORKING ON OR IN THE BUILDING DURING SHOULD BE PROVIDED.
CONSTRUCTION, OPERATIONAL MAINTENANCE OR DEMOLITION SHOULD ENSURE GOOD
VENTILATION & WEAR PERSONAL PROTECTIVE EQUIPMENT INCLUDING PROTECTION AGAINST ENCLOSED SPACES 10. OTHER HIGH RISK ACTIVITY
INHALATION WHILE USING POWDERED MATERIAL OR WHEN SANDING, DRILLING, CUTTING OR ENCLOSED SPACES WITHIN THIS BUILDING MAY PRESENT A RISK TO PERSONS ENTERING FOR
OTHERWISE DISTURBING OR CREATING POWDERED MATERIAL. ALL ELECTRICAL WORK SHOULD BE CARRIED OUT IN ACCORDANCE WITH CODE OF PRACTICE:
CONSTRUCTION, MAINTENANCE OR ANY OTHER PURPOSE. THE DESIGN DOCUMENTATION CALLS MANAGING ELECTRICAL RISKS AT THE WORKPLACE, AS/NZ 3012 & ALL LICENSING
FOR WARNING SIGNS & BARRIERS TO UNAUTHORISED ACCESS. THESE SHOULD BE MAINTAINED
TREATED TIMBER REQUIREMENTS.
THROUGHOUT THE LIFE OF THE BUILDING. WHERE WORKERS ARE REQUIRED TO ENTER
THE DESIGN OF THIS BUILDING INCLUDES PROVISION FOR THE INCLUSION OF TREATED TIMBER ENCLOSED SPACES, AIR TESTING EQUIPMENT & PERSONAL PROTECTIVE EQUIPMENT SHOULD BE ALL WORK USING PLANT SHOULD BE CARRIED OUT IN ACCORDANCE WITH CODE OF PRACTICE:
WITHIN THE STRUCTURE. DUST OR FUMES FROM THIS MATERIAL CAN BE HARMFUL. PERSONS PROVIDED. MANAGING RISKS OF PLANT AT THE WORKPLACE.
WORKING ON OR IN THE BUILDING DURING CONSTRUCTION, OPERATIONAL MAINTENANCE OR
DEMOLITION SHOULD ENSURE GOOD VENTILATION & WEAR PERSONAL PROTECTIVE EQUIPMENT SMALL SPACES
ALL WORK SHOULD BE CARRIED OUT IN ACCORDANCE WITH CODE OF PRACTICE: MANAGING
INCLUDING PROTECTION AGAINST INHALATION OF HARMFUL MATERIAL WHEN SANDING, SOME SMALL SPACES WITHIN THIS BUILDING WILL REQUIRE ACCESS BY CONSTRUCTION OR NOISE & PREVENTING HEARING LOSS AT WORK.
DRILLING, CUTTING OR USING TREATED TIMBER IN ANY WAY THAT MAY CAUSE HARMFUL MAINTENANCE WORKERS. THE DESIGN DOCUMENTATION CALLS FOR WARNING SIGNS &
MATERIAL TO BE RELEASED. DO NOT BURN TREATED TIMBER. BARRIERS TO UNAUTHORISED ACCESS. THESE SHOULD BE MAINTAINED THROUGHOUT THE LIFE DUE TO THE HISTORY OF SERIOUS INCIDENTS IT IS RECOMMENDED THAT PARTICULAR CARE BE
OF THE BUILDING. WHERE WORKERS ARE REQUIRED TO ENTER SMALL SPACES THEY SHOULD
VOLATILE ORGANIC COMPOUNDS EXERCISED WHEN UNDERTAKING WORK INVOLVING STEEL CONSTRUCTION & CONCRETE
BE SCHEDULED SO THAT ACCESS IS FOR SHORT PERIODS. MANUAL LIFTING & OTHER MANUAL PLACEMENT. ALL THE ABOVE APPLIES.
MANY TYPES OF GLUE, SOLVENTS, SPRAY PACKS, PAINTS, VARNISHES & SOME CLEANING ACTIVITY SHOULD BE RESTRICTED IN SMALL SPACES.
MATERIALS HAVE DANGEROUS EMISSIONS. AREAS WHERE THESE ARE USED SHOULD BE KEPT
WELL VENTILATED WHILE THE MATERIAL IS BEING USED & FOR A PERIOD AFTER
INSTALLATION. PERSONAL PROTECTIVE EQUIPMENT MAY ALSO BE REQUIRED. THE 8. PUBLIC ACCESS
MANUFACTURER'S RECOMMENDATIONS FOR USE MUST BE CAREFULLY CONSIDERED AT ALL
TIMES. PUBLIC ACCESS TO CONSTRUCTION & DEMOLITION SITES & TO AREAS UNDER MAINTENANCE
CAUSES RISK TO WORKERS & PUBLIC. WARNING SIGNS & SECURE BARRIERS TO
SYNTHETIC MINERAL FIBRE UNAUTHORISED ACCESS SHOULD BE PROVIDED. WHERE ELECTRICAL INSTALLATIONS,
EXCAVATIONS, PLANT OR LOOSE MATERIALS ARE PRESENT THEY SHOULD BE SECURED WHEN
FIBREGLASS, ROCKWOOL, CERAMIC & OTHER MATERIAL USED FOR THERMAL OR SOUND
NOT FULLY SUPERVISED.
INSULATION MAY CONTAIN SYNTHETIC MINERAL FIBRE WHICH MAY BE HARMFUL IF INHALED OR
IF IT COMES IN CONTACT WITH THE SKIN, EYES OR OTHER SENSITIVE PARTS OF THE BODY.
PERSONAL PROTECTIVE EQUIPMENT INCLUDING PROTECTION AGAINST INHALATION OF HARMFUL
MATERIAL SHOULD BE USED WHEN INSTALLING, REMOVING OR WORKING NEAR BULK
INSULATION MATERIAL.
AAA Design & Development Pty Ltd No. Description Date Mat Deighton APPROVED Workplace Health and Safety 2 of 2
34/13 Norval Court, MAROOCHYDORE, QLD 4558 14 Orealla Cres, Project number D139-01 Revision
Tel/Fax: (07) 5479 6747 SUNRISE BEACH, QLD 4567 Date 24/08/2022 3951- A115
Mob: 0422 039 247
design Drawn by R.S. A
email: [email protected] Development Pty Ltd PROPOSED DUAL OCCUPANCY For & on behalf of AAA
Design & Development Consulting Checked by D.L.T. Scale @A3 1 : 100
A PRELIMINARY 24/08/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.