Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Attachment 1 - Proposal Plans

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (16.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                      WORK                    HEALTH                    &         SAFETY                      NOTES
                                                                                       THESE WORK HEALTH & SAFETY NOTES MUST BE PROVIDED TO ALL OWNERS, BUILDING CONTRACTORS, SUB-CONTRACTORS, CONSULTANTS, RENOVATORS,
                                                                                       OPERATORS, MAINTENANCE PERSONNEL, DEMOLITION CONTRACTORS, & ALL OTHERS ASSOCIATED WITH PERFORMING WORK ON/OR WITHIN THE BUILDING &
                                                                                          SURROUNDS. THE WORK HEALTH & SAFETY NOTES ARE TO BE FULLY READ & UNDERSTOOD BY ALL PERSONS PRIOR TO COMMENCING ANY WORK.



 6.     HAZARDOUS                   SUBSTANCES                                                                     TIMBER FLOORS                                                                             9.      OPERATIONAL                                     USE        OF      BUILDING
                                                                                                                   THIS BUILDING CONTAINS TIMBER FLOORS WHICH HAVE AN APPLIED FINISH. AREAS WHERE
        ASBESTOS IN EXISTING BUILDINGS                                                                                                                                                                               RESIDENTIAL BUILDINGS
                                                                                                                   FINISHES ARE APPLIED SHOULD BE KEPT WELL VENTILATED DURING SANDING & APPLICATION,
        BUILDING CONSTRUCTED PRIOR TO 1990                                                                         & FOR A PERIOD AFTER INSULATION. PERSONAL PROTECTIVE EQUIPMENT MAY ALSO BE                        WHERE THE BUILDING HAS BEEN DESIGNED AS A RESIDENTIAL BUILDING, & AT A LATER DATE
                                                                                                                   REQUIRED. THE MANUFACTURER'S RECOMMENDATIONS FOR USE MUST BE CAREFULLY                            IS USED OR INTENDED AS A WORKPLACE, THE PROVISIONS OF THE WORK HEALTH & SAFETY
        IF THIS BUILDING WAS CONSTRUCTED PRIOR TO 1990 & THEREFORE MAY CONTAIN ASBESTOS
                                                                                                                   CONSIDERED AT ALL TIMES.                                                                          ACT 2011 OR SUBSEQUENT REPLACEMENT ACT SHOULD BE APPLIED TO THE NEW USE.
        EITHER IN CLADDING MATERIAL OR IN FIRE RETARDENT INSULATION MATERIAL. THE BUILDER
        SHOULD CHECK &, IF NECESSARY, TAKE APPROPRIATE ACTION BEFORE DEMOLISHING, CUTTING,                                                                                                                           NON-RESIDENTIAL BUILDINGS - END USE UNKNOWN
        SANDING, DRILLING OR OTHERWISE DISTURBING THE EXISTING STRUCTURE.
                                                                                                           7.      CONFINED               SPACES                                                                     THE BUILDING HAS BEEN DESIGNED TO REQUIREMENTS OF THE CLASSIFICATION IDENTIFIED ON
        BUILDING CONSTRUCTED PRIOR TO 1986                                                                                                                                                                           THE DRAWINGS. THE SPECIFIC USE OF THE BUILDING IS NOT KNOWN AT THE TIME OF THE
                                                                                                                   EXCAVATION                                                                                        DESIGN & A FURTHER ASSESSMENT OF THE WORKPLACE HEALTH & SAFETY ISSUES SHOULD
        IF THIS BUILDING WAS CONSTRUCTED PRIOR TO 1986 & THEREFORE IS LIKELY TO CONTAIN
                                                                                                                   CONSTRUCTION OF THIS BUILDING & SOME MAINTENANCE ON THE BUILDING WILL REQUIRE                     BE UNDERTAKEN AT THE TIME OF FIT-OUT FOR THE END-USER.
        ASBESTOS EITHER IN CLADDING MATERIAL OR IN FIRE RETARDENT INSULATION MATERIAL. THE
        BUILDER SHOULD CHECK &, IF NECESSARY, TAKE APPROPRIATE ACTION BEFORE DEMOLISHING,                          EXCAVATION & INSTALLATION OF ITEMS WITHIN EXCAVATIONS. WHERE PRACTICAL,                           NON-RESIDENTIAL BUILDINGS - END USE KNOWN
        CUTTING, SANDING, DRILLING OR OTHERWISE DISTURBING THE EXISTING STRUCTURE.                                 INSTALLATION SHOULD BE CARRIED OUT USING METHODS WHICH DO NOT REQUIRE WORKERS TO
                                                                                                                   ENTER THE EXCAVATION. WHERE THIS IS NOT PRACTICAL, ADEQUATE SUPPORT FOR THE                       THIS BUILDING HAS BEEN DESIGNED FOR THE SPECIFIC USE AS IDENTIFIED ON THE DRAWINGS.
        POWDERED MATERIALS                                                                                         EXCAVATED AREA SHOULD BE PROVIDED TO PREVENT COLLAPSE. WARNING SIGNS &                            WHERE A CHANGE OF USE OCCURS AT A LATER DATE A FURTHER ASSESSMENT OF THE
        MANY MATERIALS USED IN THE CONSTRUCTION OF THIS BUILDING CAN CAUSE HARM IF                                 BARRIERS TO PREVENT ACCIDENTAL OR UNAUTHORISED ACCESS TO ALL EXCAVATIONS                          WORKPLACE HEALTH & SAFETY ISSUES SHOULD BE UNDERTAKEN.
        INHALED IN POWDERED FORM. PERSONS WORKING ON OR IN THE BUILDING DURING                                     SHOULD BE PROVIDED.
        CONSTRUCTION, OPERATIONAL MAINTENANCE OR DEMOLITION SHOULD ENSURE GOOD
        VENTILATION & WEAR PERSONAL PROTECTIVE EQUIPMENT INCLUDING PROTECTION AGAINST                              ENCLOSED SPACES                                                                           10.     OTHER                    HIGH              RISK           ACTIVITY
        INHALATION WHILE USING POWDERED MATERIAL OR WHEN SANDING, DRILLING, CUTTING OR                             ENCLOSED SPACES WITHIN THIS BUILDING MAY PRESENT A RISK TO PERSONS ENTERING FOR
        OTHERWISE DISTURBING OR CREATING POWDERED MATERIAL.                                                                                                                                                          ALL ELECTRICAL WORK SHOULD BE CARRIED OUT IN ACCORDANCE WITH CODE OF PRACTICE:
                                                                                                                   CONSTRUCTION, MAINTENANCE OR ANY OTHER PURPOSE. THE DESIGN DOCUMENTATION CALLS                    MANAGING ELECTRICAL RISKS AT THE WORKPLACE, AS/NZ 3012 & ALL LICENSING
                                                                                                                   FOR WARNING SIGNS & BARRIERS TO UNAUTHORISED ACCESS. THESE SHOULD BE MAINTAINED
        TREATED TIMBER                                                                                                                                                                                               REQUIREMENTS.
                                                                                                                   THROUGHOUT THE LIFE OF THE BUILDING. WHERE WORKERS ARE REQUIRED TO ENTER
        THE DESIGN OF THIS BUILDING INCLUDES PROVISION FOR THE INCLUSION OF TREATED TIMBER                         ENCLOSED SPACES, AIR TESTING EQUIPMENT & PERSONAL PROTECTIVE EQUIPMENT SHOULD BE                  ALL WORK USING PLANT SHOULD BE CARRIED OUT IN ACCORDANCE WITH CODE OF PRACTICE:
        WITHIN THE STRUCTURE. DUST OR FUMES FROM THIS MATERIAL CAN BE HARMFUL. PERSONS                             PROVIDED.                                                                                         MANAGING RISKS OF PLANT AT THE WORKPLACE.
        WORKING ON OR IN THE BUILDING DURING CONSTRUCTION, OPERATIONAL MAINTENANCE OR
        DEMOLITION SHOULD ENSURE GOOD VENTILATION & WEAR PERSONAL PROTECTIVE EQUIPMENT                             SMALL SPACES
                                                                                                                                                                                                                     ALL WORK SHOULD BE CARRIED OUT IN ACCORDANCE WITH CODE OF PRACTICE: MANAGING
        INCLUDING PROTECTION AGAINST INHALATION OF HARMFUL MATERIAL WHEN SANDING,                                  SOME SMALL SPACES WITHIN THIS BUILDING WILL REQUIRE ACCESS BY CONSTRUCTION OR                     NOISE & PREVENTING HEARING LOSS AT WORK.
        DRILLING, CUTTING OR USING TREATED TIMBER IN ANY WAY THAT MAY CAUSE HARMFUL                                MAINTENANCE WORKERS. THE DESIGN DOCUMENTATION CALLS FOR WARNING SIGNS &
        MATERIAL TO BE RELEASED. DO NOT BURN TREATED TIMBER.                                                       BARRIERS TO UNAUTHORISED ACCESS. THESE SHOULD BE MAINTAINED THROUGHOUT THE LIFE                   DUE TO THE HISTORY OF SERIOUS INCIDENTS IT IS RECOMMENDED THAT PARTICULAR CARE BE
                                                                                                                   OF THE BUILDING. WHERE WORKERS ARE REQUIRED TO ENTER SMALL SPACES THEY SHOULD
        VOLATILE ORGANIC COMPOUNDS                                                                                                                                                                                   EXERCISED WHEN UNDERTAKING WORK INVOLVING STEEL CONSTRUCTION & CONCRETE
                                                                                                                   BE SCHEDULED SO THAT ACCESS IS FOR SHORT PERIODS. MANUAL LIFTING & OTHER MANUAL                   PLACEMENT. ALL THE ABOVE APPLIES.
        MANY TYPES OF GLUE, SOLVENTS, SPRAY PACKS, PAINTS, VARNISHES & SOME CLEANING                               ACTIVITY SHOULD BE RESTRICTED IN SMALL SPACES.
        MATERIALS HAVE DANGEROUS EMISSIONS. AREAS WHERE THESE ARE USED SHOULD BE KEPT
        WELL VENTILATED WHILE THE MATERIAL IS BEING USED & FOR A PERIOD AFTER
        INSTALLATION. PERSONAL PROTECTIVE EQUIPMENT MAY ALSO BE REQUIRED. THE                              8.      PUBLIC            ACCESS
        MANUFACTURER'S RECOMMENDATIONS FOR USE MUST BE CAREFULLY CONSIDERED AT ALL
        TIMES.                                                                                                     PUBLIC ACCESS TO CONSTRUCTION & DEMOLITION SITES & TO AREAS UNDER MAINTENANCE
                                                                                                                   CAUSES RISK TO WORKERS & PUBLIC. WARNING SIGNS & SECURE BARRIERS TO
        SYNTHETIC MINERAL FIBRE                                                                                    UNAUTHORISED ACCESS SHOULD BE PROVIDED. WHERE ELECTRICAL INSTALLATIONS,
                                                                                                                   EXCAVATIONS, PLANT OR LOOSE MATERIALS ARE PRESENT THEY SHOULD BE SECURED WHEN
        FIBREGLASS, ROCKWOOL, CERAMIC & OTHER MATERIAL USED FOR THERMAL OR SOUND
                                                                                                                   NOT FULLY SUPERVISED.
        INSULATION MAY CONTAIN SYNTHETIC MINERAL FIBRE WHICH MAY BE HARMFUL IF INHALED OR
        IF IT COMES IN CONTACT WITH THE SKIN, EYES OR OTHER SENSITIVE PARTS OF THE BODY.
        PERSONAL PROTECTIVE EQUIPMENT INCLUDING PROTECTION AGAINST INHALATION OF HARMFUL
        MATERIAL SHOULD BE USED WHEN INSTALLING, REMOVING OR WORKING NEAR BULK
        INSULATION MATERIAL.




AAA Design & Development Pty Ltd                                                       No.                      Description                      Date          Mat Deighton                                                       APPROVED                    Workplace Health and Safety 2 of 2

34/13 Norval Court, MAROOCHYDORE, QLD 4558                                                                                                                     14 Orealla Cres,                                                                               Project number      D139-01                 Revision
Tel/Fax:       (07) 5479 6747                                                                                                                                  SUNRISE BEACH, QLD 4567                                                                        Date             24/08/2022    3951- A115
Mob:           0422 039 247
                                                          design                                                                                                                                                                                             Drawn by                R.S.                  A
email:         [email protected]                         Development Pty Ltd                                                                           PROPOSED DUAL OCCUPANCY                                         For & on behalf of AAA
                                                                                                                                                                                                                            Design & Development Consulting   Checked by            D.L.T. Scale @A3       1 : 100
                                                                                        A    PRELIMINARY                                       24/08/2022
Log in to download the original file

Attachment 1 - Proposal Plans.pdf · 16.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.