Original source · versioned page text
Appendix D - Bushfire Risk Assessment and Management Plan
Ecological Natural Area Management
• Slope in the vegetation = 1.30
• Site slope = 1.30
• Fire run = 80m leading to a reduction of the bushfire rate of spread to 0.50 of the full quasi-
steady state rate of spread
• FFDI = 53
6.5 Map of the assessed Bushfire Attack Levels
This map of the assessed Bushfire Attack Levels for lots in the development shows that:
• All houses in the development can be built in the green areas which have a bushfire
construction requirement of BAL 12.5,
• Areas in the centre of the development have a radiant heat load less than 10kW/m2 and are
safe areas but”
• The escape route is through a BAL 19 area.
Figure 14: Map of the assessed Bushfire Attack Levels for lots in the development. All houses in the
development can be built in the green areas which have a bushfire construction requirement of BAL Areas in
the centre of the development have a radiant heat load less than 10kW/m2 and are safe areas.
6.6 Assessment of the minimum Asset Protection Zone
The minimum Asset Protection Zone that allows radiant heat loads less than 10kW/m2 and are
safe areas as required by Bushfire Resilient Communities
Bushfire Risk Assmnt & Mngt Plan for a “Community housing” development at 55 Carpenters Rd, Cooroy February 2022
24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix D - Bushfire Risk Assessment and Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.