2.1 Topography and Site Drainage
The maximum site level is approximately 16.60m AHD, falling to 9.28m AHD over a
distance of approximately 91m. There is an average existing gradient on site of
approximately 8%, falling in a south-westerly direction.
The site currently drains to a DN450 RCP pipe, which flows south to the lawful point
of discharge for Lot 101. In this report, the upstream catchment comprising of a
portion of the neighbouring site is included in the overall catchment calculations.
3 STORMWATER
All stormwater drainage calculations were undertaken in accordance with the
requirements of QUDM. The existing stormwater drainage layout for the proposed
Lot and existing Lot 101 can be found on the attached drawing 10234.01_DA01.
It is proposed that a 3.0m wide easement be provided over the existing stormwater
overland flow path to the south of the site (refer Plan 10234.01_DA01). This will allow
for unimpeded stormwater overland flow from the neighbouring property (Lot 26 on
SP151406) through the proposed Lot 103.
The current catchment for the existing point of discharge was calculated at 0.911ha,
covering an area extending into the neighbouring property (Lot 26 on SP151406) as
shown on Plan 10234.01_DA03. The total catchment discharge for a Q10 Storm event
was calculated to be 0.329m3/s, adopting a C10 value of 0.78 and a tc of 11 minutes
(refer Appendix D for runoff calculations for the overall catchment).
As this application refers only to the reconfiguration of Lot 101, and does not address
the stormwater needs of a developed site scenario, it is assumed that stormwater
detention measures will not be required. The reconfiguration of Lot 101 does not
worsen the current stormwater situation. However any future development that
increases the impervious area of the catchment will require detention measures.
Refer to Section 3.1 for information regarding assumptions made for a post-
development scenario.
3.1 Proposed Lot 103 Catchment
The proposed Lot 103 catchment covers an area of 4073m2 and is currently
vegetated. For the pre-developed scenario, a Q10 discharge of 0.137m3/s was
established, adopting a C10 value of 0.70 and tc of 10 minutes. In the case of a future
developed scenario, a Q10 discharge of 0.209m3/s was established adopting a C10
value of 0.88 and an expected tc of 6 minutes. (Refer to Appendix E for discharge
calculations).
This change in Q10 discharge value indicates that detention measures will need to be
implemented in the case of any development to proposed Lot 103 that increases the
impervious area that provides an approximate total detention volume of 27.0m3.