MAINTENANCE
Each proposed stormwater treatment device requires regular maintenance to achieve the required
pollutant removal efficiencies. If the devices are not properly maintained, they may underperform
and, in some cases, cause pollutants to leach into downstream receiving environments.

It is recommended that the maintenance requirements for the pit be adopted from the suppliers of
these propriety devices to ensure the optimum performance of the proposed SQIDs.

The detention and rain harvesting tank should be inspected and cleaned annually to ensure all inlets
and outlets are free-draining, and the tank is clear of sediment that may have been captured from
the upstream catchments.

Any material being disposed of during maintenance should be done in an acceptable manner that
does not harm the environment.

CONCLUSION
SCCE has prepared this SMP for the proposed development at 51 Elanda Street.

Based on our investigations, analyses, and designs, it has been demonstrated that the proposed
development can be constructed and operated in accordance with all stormwater objectives listed in
Section 1 of this report. The primary outcomes of this SMP are as follows:

    •   Lawful Point of Discharge—The existing lawful point of discharge on the eastern boundary
        will be maintained, with most of the site flows captured for stormwater quantity and quality
        before being discharged from the site.
    •   Stormwater Quantity—To ensure non-worsening downstream, the proposed underground
        detention tank has been sized to mitigate post-development flows to pre-developed flows
        for the 1% AEP rainfall event. The tanks should be no smaller than 2.5m³ in volume. The
        below-ground detention tank has been sized using DRAINS modelling software for the
        upstream catchment. A rainwater harvesting tank has also been considered for on-site
        detention of stormwater for greywater applications. The rainwater harvesting tank should be
        no smaller than 20m³ in volume.
    •   Stormwater Quality— Stormwater discharged from the site is treated to achieve maximum
        removal of nutrients, gross pollutants and suspended solids.




24083 – 51 Elanda Street, Sunshine Beach - SMP                                               Page 15

Used in these records

About this file

File size
15.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan.pdf · 15.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.