Council archive · source document
Stormwater Management Plan · MCU24/0153
Plans and drawings: the text below has words only, no drawings.
Very large file (15.9 MB): may take a few minutes to open.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
MAINTENANCE Each proposed stormwater treatment device requires regular maintenance to achieve the required pollutant removal efficiencies. If the devices are not properly maintained, they may underperform and, in some cases, cause pollutants to leach into downstream receiving environments. It is recommended that the maintenance requirements for the pit be adopted from the suppliers of these propriety devices to ensure the optimum performance of the proposed SQIDs. The detention and rain harvesting tank should be inspected and cleaned annually to ensure all inlets and outlets are free-draining, and the tank is clear of sediment that may have been captured from the upstream catchments. Any material being disposed of during maintenance should be done in an acceptable manner that does not harm the environment. CONCLUSION SCCE has prepared this SMP for the proposed development at 51 Elanda Street. Based on our investigations, analyses, and designs, it has been demonstrated that the proposed development can be constructed and operated in accordance with all stormwater objectives listed in Section 1 of this report. The primary outcomes of this SMP are as follows: • Lawful Point of Discharge—The existing lawful point of discharge on the eastern boundary will be maintained, with most of the site flows captured for stormwater quantity and quality before being discharged from the site. • Stormwater Quantity—To ensure non-worsening downstream, the proposed underground detention tank has been sized to mitigate post-development flows to pre-developed flows for the 1% AEP rainfall event. The tanks should be no smaller than 2.5m³ in volume. The below-ground detention tank has been sized using DRAINS modelling software for the upstream catchment. A rainwater harvesting tank has also been considered for on-site detention of stormwater for greywater applications. The rainwater harvesting tank should be no smaller than 20m³ in volume. • Stormwater Quality— Stormwater discharged from the site is treated to achieve maximum removal of nutrients, gross pollutants and suspended solids. 24083 – 51 Elanda Street, Sunshine Beach - SMP Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.