QUALITY ASSESSMENT
Construction Phase
Before beginning construction, the principal contractor is responsible for installing effective erosion
and sediment control measures around the site. This is necessary to minimise disturbance and
ensure that the quality of the runoff discharged from the site meets acceptable standards.
In future OPW applications, an erosion and sediment control plan (ESCP) should be added. The plan
should be prepared based on Type 1, 2 and 3 controls and in accordance with the Best Practice
Erosion and Sediment Control Manual (ICEA 2009). The site's erosion and sediment controls must
include:
• Sediment barriers to be installed on all entrances to stormwater inlet pits;
• Construction entry and exit shakedown areas;
• Sediment fences are to be installed on the downstream boundaries of the subject site;
• Construction of temporary bunds at the top of all earthworks batters to ensure runoff is
directed away from exposed batters;
• Construction of temporary diversion drains to divert water to sediment basins and around
any stockpiles;
• Sediment fences to be installed on the downstream side of any stockpiles;
• Stabilisation of all batters upon reaching the finished earthworks levels;
• Dust control measures, which include covering stockpiles, maintaining site fences and
watering exposed areas;
• Sediment basin in accordance with IECA Best Practice Erosion and Sediment Control.
Operational Phase
Stormwater Quality Improvement
The State Planning Policy proposes criteria that apply to ‘high-risk’ developments for stormwater to
identify the triggers for stormwater quality management. The criteria include one or more of the
following:
• A Material Change of Use (MCU) for an urban purpose which involves greater than 2,500m2
of land that:
o will result in an impervious area greater than 25% of the net developable area; or
o will result in six (6) or more dwellings;
• A Reconfiguration of a Lot (ROL) for urban purposes that involves a land area greater than
2,500m2 and will result in six (6) or more lots; or
• Operational works for urban purposes that involve disturbing more than 2,500m2 of land.
Given the size of the proposed development, an alternative management measure in the form of a
communal rain-harvesting tank is considered appropriate. The tank should be complemented with
pit baskets installed along all pits located within the main driveway and the inlet pits along the
southern boundary of the development.
The rain harvesting tank should be no smaller than 20 m³ in volume. All stormwater discharge from
the roof and the pit and pipe system should either discharge through the detention tank or to the
rain harvesting tank. The rain harvesting tank system should be appropriately fitted with a pump
system to facilitate the use of the harvested rain for greywater applications, such as irrigation.
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.