Council archive · source document
Stormwater Management Plan · MCU24/0153
Plans and drawings: the text below has words only, no drawings.
Very large file (15.9 MB): may take a few minutes to open.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
Table of Tables TABLE 1: OBJECTIVES.................................................................................................................................. 5 TABLE 2: PRE-DEVELOPMENT CATCHMENT RUNOFF ESTIMATIONS .................................................. 10 TABLE 3: POST-DEVELOPMENT CATCHMENT UNMITIGATED RUNOFF ESTIMATIONS ....................... 11 TABLE 4: MODEL PARAMETERS ............................................................................................................ 11 TABLE 5: PRE-DEVELOPMENT CATCHMENT RUNOFF VALIDATION ..................................................... 11 TABLE 6: POST-DEVELOPMENT UNMITIGATED CATCHMENT RUNOFF VALIDATION ......................... 12 TABLE 7: PRE-DEVELOPMENT FLOWS VS. POST-DEVELOPMENT MITIGATED FLOWS ..................... 13 Table of Figures FIGURE 1: SITE LOCATION (NEARMAPS) ........................................................................................................ 6 FIGURE 2: IFD DESIGN RAINFALL INTENSITY (MM/HR) ......................................................................... 7 FIGURE 3: SITE CHARACTERISTICS ................................................................................................................ 8 FIGURE 4: DEVELOPMENT LAYOUT CONCEPT ................................................................................................. 9 FIGURE 5: DRAINS MODEL ........................................................................................................................ 10 FIGURE 6: STORAGE VOLUME GRAPH FOR THE PROPOSED DETENTION TANK .................................. 13 Appendices Appendix A Survey Plan Appendix B Plan of Development Appendix C Concept Stormwater Plan Appendix D Stormwater Calculations 24083 – 51 Elanda Street, Sunshine Beach - SMP Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.