Skip to the record
The gold standard in government transparency.

Council archive · source document

Stormwater Management Plan · MCU24/0153

of 38

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (15.9 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

Table of Tables
TABLE 1: OBJECTIVES.................................................................................................................................. 5
TABLE 2: PRE-DEVELOPMENT CATCHMENT RUNOFF ESTIMATIONS .................................................. 10
TABLE 3: POST-DEVELOPMENT CATCHMENT UNMITIGATED RUNOFF ESTIMATIONS ....................... 11
TABLE 4: MODEL PARAMETERS ............................................................................................................ 11
TABLE 5: PRE-DEVELOPMENT CATCHMENT RUNOFF VALIDATION ..................................................... 11
TABLE 6: POST-DEVELOPMENT UNMITIGATED CATCHMENT RUNOFF VALIDATION ......................... 12
TABLE 7: PRE-DEVELOPMENT FLOWS VS. POST-DEVELOPMENT MITIGATED FLOWS ..................... 13


Table of Figures
FIGURE 1: SITE LOCATION (NEARMAPS) ........................................................................................................ 6
FIGURE 2: IFD DESIGN RAINFALL INTENSITY (MM/HR) ......................................................................... 7
FIGURE 3: SITE CHARACTERISTICS ................................................................................................................ 8
FIGURE 4: DEVELOPMENT LAYOUT CONCEPT ................................................................................................. 9
FIGURE 5: DRAINS MODEL ........................................................................................................................ 10
FIGURE 6: STORAGE VOLUME GRAPH FOR THE PROPOSED DETENTION TANK .................................. 13


Appendices
Appendix A Survey Plan

Appendix B Plan of Development

Appendix C Concept Stormwater Plan

Appendix D Stormwater Calculations




24083 – 51 Elanda Street, Sunshine Beach - SMP                                                                                               Page 3

Used in these records

About this file

File size
15.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan.pdf · 15.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.