Council archive · source document
Stormwater Management Plan · MCU24/0153
Plans and drawings: the text below has words only, no drawings.
Very large file (15.9 MB): may take a few minutes to open.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
EXECUTIVE SUMMARY Archend engaged Sunshine Coast Civil Engineers (SCCE) to provide development support for a proposed residential development at 51 Elanda Street, Sunshine Beach. This report comprises the assessment of stormwater to address the requirements of the Noosa Shire Council (the Council) planning scheme policy and stormwater guidelines. The proposed development is a residential development of the existing lot into a 6-unit complex. The existing lot does contain a residential building and can be described as sloped, with a paved driveway, good grass cover and some vegetation that is being maintained. The site will require on-site stormwater detention in an underground tank no smaller than 2.5m³ in volume, stormwater quality treatment via pit baskets, and a rain harvesting tank no smaller than 20m³. All stormwater flows will be conveyed to the lawful point of discharge. 24083 – 51 Elanda Street, Sunshine Beach - SMP Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.